{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on the submitted plans, numbers:","TWC-183/LP-001 Rev B","TWC-183/SP-001 Rev B","SP-003 Rev K","GA-001 Rev A","GA-002-PH1 Rev C","GA-002-PH2 Rev B","BP-001 Rev D","BP-002 Rev C","RC-001","RCA-002 Rev D","FL-001 Rev E","EV-001","EV-002 Rev A","EV-005","EV-007","2602015-TK02","Balustrade Details (Adjustable Aluminium Channel) prepared by Pro-Railing","Door schedule prepared by Enfield Speciality Doors","Limewash product information prepared by Farrow & Ball dated 13.10.2025","and shall thereafter be retained/maintained for as long as the development remains in existence.","REASON","To ensure the development complies with the provisions Hillingdon Local Plan Parts 1 (2012) and 2 (2020) and the London Plan (2021).","The development hereby permitted shall not be occupied until the following has been completed in accordance with the specified supporting plans and/or documents:","Planning Statement prepared by 3BM Planning dated December 2025","Heritage, Design and Access Statement, Revision G, dated 3 December 2025","Biodiversity Net Gain Assessment, Issue 1.1, dated 1 December 2025","Preliminary Ecological Appraisal dated 30th October 2025","Thereafter the development shall be retained/maintained in accordance with these details for as long as the development remains in existence","REASON","To ensure that the development is carried out in accordance with the approved scheme and complies with the Hillingdon Local Plan Parts 1 (2012) and 2 (2020) and the London Plan (2021).","Prior to the commencement of any external works to the building or the construction of the conservatory, full details and samples of all external materials and finishes, including brickwork, render, roofing, rainwater goods and external metalwork, shall be submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be carried out strictly in accordance with the approved details.","Reason","To ensure that the external appearance of the development preserves the character and setting of the listed building in accordance with Policy DMHB 2 of the Hillingdon Local Plan Part 2 (2020).","Before the relevant landscaping works commence, details of the proposed hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority.","The landscaping shall thereafter be carried out in accordance with the approved details.","REASON","To preserve the setting of the listed building and the character and appearance of Hayes Village Conservation Area, in accordance with Policies DMHB 2, DMHB 4 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020).","Notwithstanding the approved plans, prior to occupation of the development hereby permitted, a mixed native species hedge shall be planted alongside the fencing on the south and east boundaries facing the parkland. The proposed fencing shall be painted in a dark green colour.","REASON","To ensure that the proposed development does not have an adverse effect upon the appearance and historic fabric of the listed building in accordance with Policy DMHB 2 of the Hillingdon Local Plan Part 2 (2020).","Trees, hedges and shrubs shown to be retained on the approved plan shall not be damaged, uprooted, felled, lopped or topped without the prior written consent of the Local Planning Authority. If any retained tree, hedge or shrub is removed or severely damaged during construction, or is found to be seriously diseased or dying another tree, hedge or shrub shall be planted at the same place or, if planting in the same place would leave the new tree, hedge or shrub susceptible to disease, then the planting should be in a position to be first agreed in writing with the Local Planning Authority and shall be of a size and species to be agreed in writing by the Local Planning Authority and shall be planted in the first planting season following the completion of the development or the occupation of the buildings, whichever is the earlier. Where damage is less severe, a schedule of remedial works necessary to ameliorate the effect of damage by tree surgery, feeding or groundwork shall be agreed","Prior to the commencement of development, a Biodiversity Gain Plan (BGP) and a Habitat Management and Monitoring Plan (HMMP) shall be submitted to and approved in writing by the Local Planning Authority. The BGP and HMMP shall be based on, and demonstrate compliance with, the Biodiversity Net Gain Assessment prepared by 3BM Limited dated 1.12.2025 (Issue 1.1).","The BGP shall include, but not be limited to:","a) A summary of on-site and (if relevant) off-site biodiversity unit calculations demonstrating at least the required minimum biodiversity net gain;","b) Details of all habitat creation, enhancement and retention measures, including plans, specifications, locations and timescales;","c) Details of responsible persons and lines of communication; and","d) A programme for delivery in accordance with the development phasing.","The HMMP shall include:","a) Management objectives for each created or enhanced habitat;","b) Maintenance and management prescriptions for a minimum period of 30 years from pr","Prior to occupation of the development hereby permitted, a revised Travel Plan shall be submitted to and approved in writing by the Local Planning Authority. The Travel Plan, as submitted shall follow the current Travel Plan Development Control Guidance issued by Transport for London and will include:","(1) targets for sustainable travel arrangements;","(2) effective measures for the ongoing monitoring of the Travel Plan;","(3) a commitment to delivering the Travel Plan objectives; and","(4) effective mechanisms to achieve the objectives of the Travel Plan by both present and future occupiers of the development.","The development shall be implemented only in accordance with the approved Travel Plan.","REASON","To promote sustainable transport and reduce the impact of the development on the surrounding road network in accordance with Policies","DMT 1, DMT 4 and DMT 6 of the Hillingdon Local Plan Part 2 (2020) and Policies T2, T4 and T6 of the London Plan (2021).","Prior to occupation of the development hereby permitted, a Car Parking Management Plan shall be submitted to and approved in writing by the Local Planning Authority. It shall include the arrangements for all on-site parking, including provisions for managing, monitoring, enforcement and review.","The vehicle parking provision and its management, as outlined in the approved Car Parking Management Plan, shall be fully implemented prior to the first occupation of the development, and so maintained in good working order, and the parking spaces shall not be used for any other purpose for the lifetime of the development.","REASON","To ensure the appropriate operation of the car parking spaces and to ensure that the proposed development provides adequate facilities in accordance with Policies DMT 1, DMT 2 and DMT 6 of the Hillingdon Local Plan Part 2 (2020) and Policy T6 of the London Plan (2021).","The Equality Act 2010 aims to safeguard individuals accessing goods, facilities, and services from discrimination based on a 'protected characteristic', including disability. In accordance with the Act, service providers must enhance access to and within their premises, especially when reasonable adjustments are feasible and straightforward to implement. The Act mandates that service providers proactively identify and eliminate barriers hindering disabled people.","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan - The Spatial Development Strategy for London consolidated with alterations since 2011 (2021) and national guidance.","On this decision notice policies from the Councils Local Plan: Part 1 - Strategic Policies appear first, then relevant Local Plan Part 2 (2020), then London Plan Policies (2021). Hillingdon's Full Council adopted the Hillingdon Local Plan: Part 1 - Strategic Policies on 8 November 2012 and the Hillingdon Local Plan Part 2 on 16 January 2020.","In dealing with the application the Council has implemented the requirement in the National Planning Policy Framework to work with the applicant in a positive and proactive way. We have made available detailed advice in the form of our statutory policies from Local Plan Part 1, Local Plan Part 2, Supplementary Planning Documents, Planning Briefs and other informal written guidance, as well as offering a full pre-application advice service, in order to ensure that the applicant has been given every opportunity to submit an application which is likely to be considered favourably."],"actual_commencement_date":null,"pp_id":"14540316","decision_target_date":"31/07/2026","valid_date":"16/12/2025","lpa_app_no":"8134/APP/2025/3073","locality":null,"appeal_decision_date":null,"parking_details":null,"decision_process":"Delegated","street_name":"WOOD END GREEN ROAD","last_synced":"2026-10-29T02:51:06.261Z","site_number":null,"centroid_easting":509382.0,"polygon":null,"ward":"WOOD END 2022","centroid_northing":181154.0,"application_type":"All Other","uprn":null,"lapsed_date":"30/07/2029","actual_completion_date":null,"decision":"Approved","site_name":"BARRA HALL","borough":"Hillingdon","last_date_consultation_comments":"27/07/2026","application_type_full":"Full planning & listed building consent","url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=8134/APP/2025/3073","decision_date":"30/07/2026","bo_system":"CSV Data Import","development_type":null,"appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Change of use from Class E(f) (children's centre) to Class F1(a) (education provision), together with associated external and internal alterations to the listed building. External alterations include limewashing of the building; installation of an external air source heat pump; replacement doors and a new French window door set; installation of an automatic opening vent within an existing rooflight opening; a new orangery and security building; installation of glazed balustrading and a gate at the foot of the stairs; refurbishment and reinstatement of entrance gates and associated posts; refurbishment of the existing pedestrian gate and posts; installation and refurbishment of security fencing; car park clearance and repainting; a new road layout and roundabout; landscaping; and cycle and refuse storage provision. Internal alterations include widened and new door openings; reconfiguration of toilet and teaching spaces; new safeguarding measures; upgrades to the sensory room; alterations to the teaching kitchen; and relocation of staff areas. (AMENDED DESCRIPTION)","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-10-28T23:00:12.607Z","centroid":{"lon":-0.424928,"lat":51.518726},"lpa_name":"Hillingdon","secondary_street_name":"HAYES","application_details":{"existing_uprns":null,"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_completion_date":"09/2025","intended_commencement_date":"03/2025"}],"total_gia_gained":0,"site_area":0.0438,"total_gia_existing":438,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":438,"use_class":"F1","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":438,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Public"},"wgs84_polygon":null,"id":"Hillingdon-8134_APP_2025_3073","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"CSV Data Import"}