{"site_name":"14 GATEHILL ROAD","site_number":14,"decision_process":"Delegated","subdivision_of_building":null,"decision_date":"16/07/2026","last_date_consultation_comments":"17/06/2026","street_name":"NORTHWOOD","lpa_name":"Hillingdon","date_building_work_started_under_previous_permission":null,"last_updated_by":"CSV Data Import","postcode":null,"appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"bo_system":"CSV Data Import","decision_conditions":["The development hereby permitted shall be begun before the expiration of three years from the date of this permission.","REASON","To comply with Section 91 of the Town and Country Planning Act 1990.","The development hereby permitted shall not be carried out except in complete accordance with the details shown on Drawing Refs:","P01.02","P02 Rev. C","P03 Rev. F","P04 Rev. E","P05 Rev. A","P06","Arboricultural Impact Assessment and Method Statement, reference AAAIA14GA, dated 24 April 2025","Tree Protection Plan, reference AATPP14GA, dated 24 April 2025","REASON","To ensure the development complies with the provisions of the Hillingdon Local Plan: Part One - Strategic Policies (November 2012) and the Hillingdon Local Plan: Part Two - Development Management Policies (January 2020), and the London Plan (March 2021).","The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building and shall thereafter be retained as such.","REASON","To safeguard the visual amenities of the area and to ensure that the proposed development does not have an adverse effect upon the appearance of the existing building or the character and appearance of the Gatehill Farm Area of Special Local Character, in accordance with Policies DMHB 1, DMHB 5, DMHB 6, DMHB 11 and DMHB 12 of the Hillingdon Local Plan Part 2 (2020).","Prior to the construction of the rear dormers or installation of the front rooflights hereby approved, detailed drawings at a scale of not less than 1:20 shall be submitted to and approved in writing by the Local Planning Authority. The details shall include the dimensions, profiles, materials, external finishes, glazing, flashings and junctions with the existing roof. The rooflights shall be conservation-style units installed substantially flush with the surrounding roof covering. The development shall thereafter be completed and retained in accordance with the approved details.","REASON","To ensure that the roof alterations are appropriately detailed and do not result in visual clutter or detract from the character and appearance of the dwelling or the Gatehill Farm Estate Area of Special Local Character, in accordance with Policies HE1 and BE1 of the Hillingdon Local Plan Part 1 (2012), Policies DMHB 1, DMHB 5, DMHB 6, DMHB 11 and DMHD 1 of the Hillingdon Local Plan Part 2 (2020), Poli","The approved development, excluding the hardstanding works to the rear of the dwelling (subject to Condition 5), shall be carried out strictly in accordance with the tree protection plan and methods detailed in the Arboricultural Impact Assessment and Method Statement, prepared by Allarboriculture, ref. AAAIA14GA dated 24th April 2025.","The fencing shall be at least 1.5m in height and shall be retained in position until development is completed. The area within the approved protective fencing shall remain undisturbed during the course of the works and in particular in these areas:","1. There shall be no changes in ground levels;","2. No materials or plant shall be stored;","3. No buildings or temporary buildings shall be erected or stationed;","4. No materials or waste shall be burnt; and","5. No drain runs or other trenches shall be dug or otherwise created, without the prior written consent of the Local Planning Authority.","REASON","To ensure that the proposed development will preserve and e","Notwithstanding the proposed hardstanding to the rear of the dwelling shown on drawing ref. P05 Rev A, no ground preparation or implementation of hardstanding shall be installed until a tree protection plan and method statement demonstrating that the proposed works would not adversely affect the health of potentially affected trees, has been submitted to the Local Planning Authority for approval. These details shall include the provision of permeable hardstanding. The ground preparation and installation of hardstanding shall thereafter be carried out strictly in accordance with these approved details.","REASON","To ensure that the proposed development will preserve and enhance the visual amenities of the locality and provide adequate facilities in compliance with policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020) and Policies G5, G6 and G7 of the London Plan (2021).","No trees or hedges shall be removed other than the Category C ornamental Thuja identified as T2 within the approved Arboricultural Impact Assessment. Prior to the end of the first planting season following first occupation of the approved development, a replacement tree of at least the same quality as that removed shall be planted in the rear garden of the site and maintained to provide successful establishment.","REASON","To ensure that the proposed development will preserve and enhance the visual amenities of the locality and provide adequate facilities in compliance with policies DMHB 11 and DMHB 14 of the Hillingdon Local Plan Part 2 (2020) and Policies G5, G6 and G7 of the London Plan (2021).","Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015, or any Order revoking and re-enacting that Order, no additional windows, doors or other openings shall be constructed in the walls or roof slopes of the development hereby approved.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The first floor side elevation window facing No. 12 Gatehill Road shall be glazed with permanently obscured glass to at least scale 4 on the Pilkington scale and be non-opening below a height of 1.8 metres taken from internal finished floor level for so long as the development remains in existence.","REASON","To prevent overlooking to adjoining properties in accordance with policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The flat roof of the extension hereby permitted shall not be used as a balcony, terrace, roof garden or similar amenity area. Access shall be permitted only for maintenance, repair and access to the approved air-conditioning equipment.","REASON","To protect the privacy and residential amenity of neighbouring occupiers, in accordance with Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","Prior to the installation of the air-conditioning condenser units hereby approved, details of the proposed plant shall be submitted to and approved in writing by the Local Planning Authority. The details shall include:","- the manufacturer and model of each unit","- the sound power and sound pressure levels;","- the proposed mounting and vibration-isolation measures; and","- any other noise-mitigation measures considered necessary.","The units shall be installed and thereafter operated and maintained in accordance with the approved details.","REASON","To protect neighbouring occupiers from noise and vibration, in accordance with Policy D14 of the London Plan (2021) and Policy DMHB 11 of the Hillingdon Local Plan Part 2 (2020).","The decision to GRANT planning permission has been taken having regard to all relevant planning legislation, regulations, guidance, circulars and Council policies, including The Human Rights Act (1998) (HRA 1998) which makes it unlawful for the Council to act incompatibly with Convention rights, specifically Article 6 (right to a fair hearing); Article 8 (right to respect for private and family life); Article 1 of the First Protocol (protection of property) and Article 14 (prohibition of discrimination).","The decision to GRANT planning permission has been taken having regard to the policies and proposals in the Hillingdon Local Plan Part 1 (2012) and Part 2 (2020) set out below, including Supplementary Planning Guidance, and to all relevant material considerations, including The London Plan (2021) and national guidance.","You are advised that if any part of the development hereby permitted encroaches by either its roof, walls, eaves, gutters, or foundations, then a new planning application may have to be submitted. The validity of this planning permission may be challengeable by third parties if the development results in any form of encroachment onto land outside the applicant's control for which the appropriate Notice under Article 13 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 has not been served.","The Party Wall Act 1996 requires a building owner to notify, and obtain formal agreement from, any adjoining owner, where the building owner purposes to:","- carry out work to an existing party wall:","- build on the boundary with a neighbouring property;","- in some circumstances, carry out groundworks within 6 metres of an adjoining building.","Notification and agreements under this Act are the responsibility of the building owner and are quite separate from Building Regulations, or Planning Controls. The Building Control Service will assume that an applicant has obtained any necessary agreements with the adjoining owner, and nothing said or implied by the Council should be taken as removing the necessity for the building owner to comply fully with the Party Wall Act.  Further information and advice is to be found in 'The Party Walls etc. Act - 1996 - Explanatory Booklet' published by the Department for Communities and Local Government.","Nuisance from demolition and construction works is subject to control under The Control of Pollution Act 1974, the Clean Air Acts and other related legislation. In particular, you should ensure that the following are complied with:-","A. Demolition and construction works which are audible at the site boundary shall only be carried out between the hours of 08.00 and 18.00 hours Monday to Friday and between the hours of 08.00 hours and 13.00 hours on Saturday. No works shall be carried out on Sundays, Bank or Public Holidays.","B. All noise generated during such works shall be controlled in compliance with British Standard Code of Practice BS 5228:2009.","C. Dust emissions shall be controlled in compliance with the Mayor of London's Best Practice Guidance' The Control of dust and emissions from construction and demolition.","D. No bonfires that create dark smoke or nuisance to local residents.","You are advised to consult the Council's Environmental Protection Unit (www.hillingdon.gov.uk/nois","The Council will recover from the applicant the cost of highway and footway repairs, including damage to grass verges.","Care should be taken during the building works hereby approved to ensure no damage occurs to the verge or footpaths during construction. Vehicles delivering materials to this development shall not override or cause damage to the public footway. Any damage will require to be made good to the satisfaction of the Council and at the applicant's expense.","For further information and advice contact - Highways Maintenance Operations, Central Depot - Block K, Harlington Road Depot, 128 Harlington Road, Hillingdon, Middlesex, UB3 3EU (Tel: 01895 277524).","For Private Roads: Care should be taken during the building works hereby approved to ensure no damage occurs to the verge of footpaths on private roads during construction. Vehicles delivering materials to this development shall not override or cause damage to a private road and where possible alternative routes should be ta"],"wgs84_polygon":{"coordinates":[[[-0.412507,51.610583],[-0.412499,51.610649],[-0.412599,51.610653],[-0.41265,51.610653],[-0.412672,51.610652],[-0.412693,51.610194],[-0.412668,51.61019],[-0.412558,51.610173],[-0.412517,51.610503],[-0.412511,51.61055],[-0.412507,51.610583]]],"type":"Polygon"},"centroid_easting":510015.0,"url_planning_app":"http://planning.hillingdon.gov.uk/OcellaWeb/planningDetails?reference=9762/APP/2026/489","appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"actual_commencement_date":null,"cil_liability":true,"epc_number":null,"locality":null,"ward":"NORTHWOOD HILLS 2022","appeal_start_date":null,"secondary_street_name":null,"centroid":{"lat":51.610432,"lon":-0.412614},"title_number":["unregistered"],"decision_target_date":"24/07/2026","decision":"Approved","uprn":null,"application_type":"Householder","appeal_status":null,"polygon":{"geometries":[{"coordinates":[[[510022.05,191387.913],[510022.45,191395.25],[510015.5,191395.55],[510012,191395.5],[510010.45,191395.4],[510010.1,191344.4],[510011.85,191344],[510019.5,191342.3],[510021.55,191379.05],[510021.85,191384.25],[510022.05,191387.913]]],"type":"Polygon"}],"type":"GeometryCollection"},"decision_agency":"Borough","actual_completion_date":null,"pp_id":"14733088","lpa_app_no":"9762/APP/2026/489","last_synced":"2026-10-21T16:25:19.917Z","centroid_northing":191371.0,"application_details":{"existing_uprns":null,"total_gia_gained":95,"no_additional_bathrooms":1,"no_additional_bedrooms":1,"intended_commencement_date":"05/2026","intended_completion_date":"12/2026"},"status":"Approved","parking_details":null,"description":"Demolition and rebuild of existing garage wall, conversion of garage to habitable accommodation, conversion of loft to habitable space including the installation of rear dormers and front rooflights, erection of part single storey, part two storey side and rear extensions, installation of AC units to rear, and alterations to fenestrations.","lapsed_date":"16/07/2029","application_type_full":"Householder planning permission","borough":"Hillingdon","last_updated":"2026-10-14T22:00:14.178Z","development_type":null,"id":"Hillingdon-9762_APP_2026_489","valid_date":"26/02/2026"}