{"borough":"Hounslow","application_type":"All Other","decision":"Approved","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: Design and Access Statement, Planning Fire Safety\r\nStatement, Reasonable Exception Statement, Transport Statement, Full SAP Calculations Be Green, Full SAP Calculations Be Lean, Energy Assessment, Flood Map for Planning, Waste Recycling Bin Store Detail, Drainage Assessment Form � received 29th October 2025, 01, 02, 03, 04, 05, 06, 07, 08 � received 24th February 2026, Biodiversity Net Gain Assessment, Small Sites Metric � received 7th September 2026.\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the building(s) hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the local planning authority.\r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site. \r\n","Condition : 4 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. \r\nThe development shall then be carried out in accordance with the approved details and maintained as such.\r\nReason.  In order to protect the appearance of the area thereafter.\r\n","Condition : 5 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:\r\n(a)\tmeans of enclosure/boundary treatment(s) and retaining structures;\r\n(b)\tpedestrian access and circulation areas;\r\n(c)\thard surfacing materials; \r\n(d)\trenewable energy installations (where relevant);\r\n(e)     planting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and\r\n(f)\tan implementation programme (including phasing of work where relevant).\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.\r\n","Condition : 6 - The approved refuse and recycling store as shown on the approved plans shall be completed and made available for use before the development hereby permitted is first occupied or brought into use, and thereafter shall be retained for such use at all times without obstruction. Bins shall be stored within the store at all times and shall not be left on the public highway.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 7 - Prior to occupation, the bicycle stores with spaces for at least 2 bicycles as shown on the approved plans shall be implemented and retained thereafter.\r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 8 - a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\n(b) Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a 77.58% reduction in emissions.\r\n\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 9 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 10 - (A) No development above ground level shall take place until details have been submitted to and approved by the local planning authority which demonstrate that:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n(B) The development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the local planning authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition. The development shall be maintained in accordance with the approved details at all times thereafter.\r\nReason: In the interests of sustainable development.","Condition : 11 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources."],"last_synced":"2026-09-12T03:05:31.456Z","centroid_northing":174060.0,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/2773","lpa_app_no":"P/2025/2773","site_number":"102","ward":"Bedfont","locality":"Feltham","last_date_consultation_comments":"27/11/2025","date_building_work_started_under_previous_permission":null,"description":"Subdivision of the plot and erection of a two storey dwelling attached to the existing property.","parking_details":null,"postcode":"TW14 8LF","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"14322418","status":"Approved","last_updated_by":"Northgate M3","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[508385.6704622659,174059.12750023766],[508378.37089399365,174062.2273390731],[508379.02069463127,174062.42808488425],[508379.62088446243,174062.47758095595],[508380.32081799844,174062.47802437833],[508381.07084132405,174062.37829327813],[508382.2703065308,174062.1279280577],[508383.4705098961,174061.77744996478],[508387.0707334775,174070.1281097089],[508387.3209659459,174070.12787659914],[508403.6704687963,174063.5282910351],[508406.1575277198,174062.21729174416],[508412.67081174674,174059.87729518808],[508413.7702502402,174059.4278859002],[508411.95027813606,174054.9289266155],[508409.320704039,174048.42794413172],[508398.22661932814,174052.73970300105],[508393.8028021696,174054.45558398962],[508392.62069029757,174056.17821099953],[508385.6704622659,174059.12750023766]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.441458,51.455148],[-0.441562,51.455177],[-0.441552,51.455179],[-0.441544,51.455179],[-0.441534,51.455179],[-0.441523,51.455178],[-0.441506,51.455175],[-0.441488,51.455172],[-0.441434,51.455246],[-0.441431,51.455246],[-0.441197,51.455184],[-0.441162,51.455171],[-0.441069,51.455149],[-0.441053,51.455145],[-0.441081,51.455105],[-0.441121,51.455047],[-0.441279,51.455088],[-0.441342,51.455104],[-0.441359,51.45512],[-0.441458,51.455148]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"10/09/2029","bo_system":"Northgate M3","decision_date":"11/09/2026","centroid_easting":508392.0,"actual_commencement_date":null,"id":"Hounslow-P_2025_2773","lpa_name":"Hounslow","decision_target_date":"11/09/2026","valid_date":"29/10/2025","development_type":"Minor dwellings","last_updated":"2026-09-11T13:00:12.007Z","subdivision_of_building":"side part of the site","reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.455154,"lon":-0.441366},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"Bedfont Close","appeal_decision":null,"title_number":null,"site_name":null,"appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":148.86,"non_residential_details":{"total_gia_existing":89.84,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":148.86},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":89.84,"gia_gained":148.86,"use_class":"C3","gia_lost":0}],"building_details":[{"no_storeys":2,"max_height":7.3,"building_ref":"side of 102 Bedfont Close"}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":89.84,"surface_water_discharge_percentage_reduction":1,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":1,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"12/2025","intended_commencement_date":"09/2025"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"urban_greening_factor_score":0},"occupation_status":"Occupied"},"epc_number":null,"uprn":"100021518032","actual_completion_date":null}