{"borough":"Hounslow","application_type":"All Other","decision":"Approved","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [1840 E00, 1840 E01, 1840 E02, 1840 E02 dated 9.10.2025, 1840 P01B, 1840 P02B, 1840 P03, 1840 P04. Received: 24/09/2025].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, unless otherwise shown on the approved plans.\r\nReason: In order to safeguard the appearance of the area."],"last_synced":"2026-02-15T02:45:25.252Z","centroid_northing":0.0,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/2869","lpa_app_no":"P/2025/2869","site_number":null,"ward":"Osterley & Spring Grove","locality":null,"last_date_consultation_comments":"05/11/2025","date_building_work_started_under_previous_permission":null,"description":"Erection of a new roof to raise the ridge height and change the pitch of the roof with alterations to the front and rear elevations of the industrial unit","parking_details":{"no_existing_lgv":4,"no_proposed_lgv":4,"net_lgv":0},"postcode":null,"appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"14327161","status":"Approved","last_updated_by":"Northgate M3","polygon":{"geometries":[{"coordinates":[[[516555.7488375353,178142.78573477],[516534.8604519884,178156.5710210626],[516538.9073269885,178162.80526152044],[516559.79579801194,178149.45787885704],[516555.7488375353,178142.78573477]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.322577,51.490229],[-0.322873,51.490357],[-0.322813,51.490412],[-0.322516,51.490288],[-0.322577,51.490229]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"19/01/2029","bo_system":"Northgate M3","decision_date":"20/01/2026","centroid_easting":0.0,"actual_commencement_date":null,"id":"Hounslow-P_2025_2869","lpa_name":"Hounslow","decision_target_date":"20/01/2026","valid_date":"09/10/2025","development_type":"Minor all other minor developments","last_updated":"2026-02-14T09:16:55.890Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":49.766807,"lon":-7.55716},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":"Borough","street_name":null,"appeal_decision":null,"title_number":null,"site_name":null,"appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":0,"non_residential_details":{"total_gia_existing":251,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":251,"gia_gained":0,"use_class":"B2","gia_lost":0}],"building_details":[{"no_storeys":2,"max_height":8.5,"building_ref":"Existing building"}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":251,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.0344,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Phase One","intended_completion_date":"02/2027","intended_commencement_date":"08/2026"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":true,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_active_fast_ev_charging_points":2,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":20,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":1,"total_annual_pm_emissions":0,"no_passive_fast_ev_charging_points":0}},"epc_number":null,"uprn":null,"actual_completion_date":null}