{"borough":"Hounslow","application_type":"All Other","decision":"Approved","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: PL1/SM/3461 � 00, PL1/SM/3461 � 01, PL1/SM/3461 � 02, PL1/SM/3461 � 03, PL1/SM/3461 � 04, PL1/SM/3461 � 05, PL1/SM/3461 � 06, PL1/SM/3461 � 07, PL1/SM/3461 � 08 Received 24 August 2026\r\n\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, unless otherwise shown on the approved plans.\r\nReason: In order to safeguard the appearance of the area.","Condition : 4 - The window(s) to be fitted on the front roof face of the dwelling shall be black-framed and traditional, conservation-style.\r\nReason: In order to safeguard the architectural and historic interest of the conservation area.","Condition : 5 - The windows formed in the side elevation shall be obscure-glazed and non-opening below 1.7 metres above internal floor level. The windows shall not be repaired or replaced otherwise than in accordance with the requirements of this condition. \r\nReason: In order to protect neighbours' privacy\r\n","Condition : 6 - No additional windows or openings shall be formed in the side elevation of the development hereby permitted.\r\nReason: In order to protect neighbours' privacy.\r\n","Condition : 7 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include:\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 8 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority. These\r\ndetails shall include: \r\n(a) a statement setting out the design objectives and how these will be delivered; \r\n(b) existing and proposed finished levels or contours; \r\n(c) means of enclosure/boundary treatment(s) and retaining structures;\r\n(d) vehicle parking layouts; \r\n(e) other vehicle and pedestrian access and circulation areas;\r\n(f) hard surfacing materials; \r\n(g) minor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting, CCTV etc.); \r\n(h) proposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc. indicating alignments, levels, access points, supports as relevant); \r\n(i) retained historic or other landscape features and proposals for restoration, where relevant; \r\n(j) renewable energy installations (where relevant);\r\n(k) planting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and\r\n(l) an implementation programme (including phasing of  work where relevant). \r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first\r\noccupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme. \r\nReason: In order to ensure a satisfactory appear","Condition : 9 - No development shall take place until the following details have been submitted to and approved in writing by the local planning authority:\r\n(a)\tA plan showing the position of each tree on the site and on land adjacent to the site (including street trees) that could influence or be affected by the development, indicating which trees are to be removed;\r\n(b)\tA schedule in relation to each tree identified listing species, diameter and approximate height, and an assessment on the general state of health and stability of each tree, in accordance with British Standard 5837:2012 (or in an equivalent British Standard if replaced); and any proposed pruning, felling or other works;\r\n(c)\tDetails of any proposed alterations to existing ground levels, and of the position of any proposed excavation, that may affect the root protection area of retained trees;\r\n(d)\tDetails of the fencing to be installed for the protection of retained trees.\r\nThe development shall not be carried out otherwise than in accordance with the approved details, which shall be put into effect at the commencement of work on site and retained permanently for the duration of the development works.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 10 - (a)\tNo development (except any demolition, site clearance, ground investigation and remediation work) shall take place until a full specification of all proposed tree planting has been submitted to and approved in writing by the local planning authority. The specification shall include the quantity, size, species, and positions or density of all trees to be planted, how they will be planted and protected and the proposed times of planting. \r\n\r\n(b)\tAll trees shall be planted in accordance with the details and times stated in the approved specification and in accordance with British Standard 8545:2014 (or an equivalent British Standard if replaced).\r\n\r\n(c)\tAny trees that, within five years of planting, die, are cut down, uprooted, destroyed or become (in the opinion of the local planning authority) seriously damaged or diseased, shall be replaced with another tree of a similar size and species within the first planting season following its death, removal, uprooting or destruction.\r\n\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 11 - No development shall take place until an Ecological Management Plan has been submitted to and approved in writing by the Local Planning Authority.\r\nThe Ecological Management Plan shall incorporate:\r\n(i) details of measures to protect breeding birds, nests and eggs from mortality/damage, injury and disturbance, including avoidance by timing and/or appropriate supervision;\r\n(ii) details of the ecological clerk of works supervision to be put in place to monitor the clearance of vegetation to ensure no impact on undiscovered or other unexpected faunal encounters;\r\n(iii) an ecological lighting plan;\r\n(iv) details of ecological enhancement;\r\n(v) details of how the enhancement measures will be monitored, managed and maintained, including the long- term design objectives, management responsibilities and maintenance schedules;\r\n(vi) additional detail on location and type of bird/bat boxes, maintenance and a commitment that any data collected is to be shared with the Council;\r\n(vii) species surveys within and around the site to demonstrate ecological enhancements\r\nThe development shall then be carried out in accordance\r\nwith the approved details.\r\nReason: In the interests of nature conservation.","Condition : 12 - Prior to the first commencement of the hereby approved development, a Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority, the Plan shall include;\r\n(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat,\r\n(b) the pre-development biodiversity value of the onsite habitat,\r\n(c) the post-development biodiversity value of the onsite habitat,\r\n(d) any registered offsite biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development,\r\n(e) any biodiversity credits purchased for the development, and\r\n(f) such other matters as the Secretary of State may by regulations specify.\r\nThe development shall thereafter be carried out in accordance with the approved Plan prior to the first occupation of the development. Any habitats created or enhanced on-site and off-site in accordance with the Biodiversity Gain Plan must be maintained thereafter for a minimum of 30 years.\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.","Condition : 13 - A) Prior to the first commencement of the hereby approved development a Habitat Management and Monitoring Plan (HMMP) prepared in accordance with the approved Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include:\r\n(i) a non-technical summary;\r\n(ii) the roles and responsibilities of the people or organisation(s) delivering the HMMP\r\n(iii) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;\r\n(iv) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and \r\n(v) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. \r\n\r\nB) No occupation or use of the hereby approved development shall take place until:\r\n(i) the habitat creation and enhancement works set out in the approved HMMP have been completed; and \r\n(ii) a completion report, evidencing the completed habitat enhancements, has been submitted to, and approved in writing by the Local Planning Authority. \r\nThe created and/or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP.\r\n\r\nC) Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved HMMP.\r\n\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.\r\n","Condition : 14 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted to the local planning authority for approval in writing a final detailed drainage design, including drawings and supporting calculations updated Drainage Assessment Form to the Lead Local Flood Authority for review and approval, aligned with the Drainage Strategy (02/04/2026) and associated material hereby approved. A detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted and approved which demonstrates how the drainage system is to be maintained for the lifetime of the development. The development shall be carried out in strict compliance with the approved details.\r\nReason: In order to prevent the risk of flooding to and from the site.","Condition : 15 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the local planning authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: In order to ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed.","Condition : 16 - No development above ground level shall take place until full details of the Electric Vehicle Charging Points, each capable of  a minimum output of 7.2kW, are submitted to and approved in writing by the Local Planning Authority. The details shall include manufacturer's specifications and the number of spaces provided with active and passive capabilities shall comply with the London Plan standards.\r\nThe charging points shall be installed in accordance with the approved details, with photographic evidence submitted to the Local Planning Authority upon completion, and so maintained at all times thereafter.\r\nReason: In order to promote sustainable modes of transport.","Condition : 17 - Notwithstanding the submitted details and prior to occupation, full details (including manufacturer's specifications) of all cycle stands for the occupants of, and visitors to, the development shall be submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be fully implemented and made available for use before any part of the development is first occupied and thereafter retained for use at all times without obstruction. \r\nReason: In order to support sustainable transport objectives.","Condition : 18 - Prior to first occupation, full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials\r\nin a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development\r\nshall not be carried out otherwise than in accordance with the approved details.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 19 - a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\n(b) Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a 78.73% reduction in emissions.\r\n(c) Upon final commencement of operation of any low and zero carbon technologies, suitable devices for the monitoring of the low and zero carbon technologies shall have been installed, and the monitored data shall be submitted automatically to a monitoring web-platform at daily intervals for a period of three years from the point of full operation. The data shall be made available to the local planning authority on request for a period of five years.\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 20 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 21 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 22 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 23 - If development has not commenced by May 2028, no development shall take place until a further dusk survey is carried out between 01 May and 30 August. If this survey finds that a bat roost is present, then an additional two surveys would need to be carried out to confirm its status. The findings of the survey(s) shall be submitted to and approved in writing by the Local Planning Authority. Should any such bat colonies or roosts be found on the site a detailed mitigation strategy shall be submitted to and approved in writing by the Local Planning Authority.\r\n \r\nReason: In the interests of nature conservation.\r\n"],"last_synced":"2026-09-05T03:11:24.600Z","centroid_northing":177426.0,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3080","lpa_app_no":"P/2025/3080","site_number":"150","ward":"Osterley & Spring Grove","locality":"Isleworth","last_date_consultation_comments":"21/11/2025","date_building_work_started_under_previous_permission":null,"description":"Erection of two storey side, part single, part two storey rear extension, and rear roof extension with two front roof windows to allow for the conversion of the house into five self contained flats with associated car parking and cycle and bin storage.","parking_details":null,"postcode":"TW7 5EQ","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"14401662","status":"Approved","last_updated_by":"Northgate M3","polygon":{"geometries":[{"coordinates":[[[515511.4704169369,177435.42645486433],[515515.069879564,177429.47564300016],[515515.71997783903,177428.22648611438],[515516.4199282447,177427.07637006606],[515513.62036436645,177425.97586758208],[515511.120429115,177424.9266728753],[515510.32004461484,177424.62590184144],[515509.46999746194,177424.12596037838],[515507.0860495904,177422.67997672182],[515505.6131854078,177421.89108470955],[515504.11981940275,177421.02607081452],[515499.97036601807,177418.67663416668],[515487.31638739613,177411.3210508568],[515484.47019922594,177409.82564577632],[515466.72003063,177399.92562462052],[515462.6696719549,177397.67637202132],[515448.51978890906,177389.9264430974],[515442.96988072555,177399.42566131966],[515441.07010437653,177402.7259345311],[515440.7700189905,177403.27654090925],[515473.9699498082,177422.07629123132],[515499.96993311204,177436.62623034316],[515506.3199367841,177440.17605225614],[515508.1203103443,177441.22605285398],[515508.9199739077,177439.87570595136],[515511.1463850027,177435.99097612646],[515511.4704169369,177435.42645486433]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.337843,51.484085],[-0.337793,51.484031],[-0.337784,51.48402],[-0.337774,51.484009],[-0.337815,51.484],[-0.337851,51.483991],[-0.337863,51.483988],[-0.337875,51.483984],[-0.33791,51.483972],[-0.337931,51.483965],[-0.337953,51.483957],[-0.338014,51.483937],[-0.338198,51.483874],[-0.33824,51.483861],[-0.338498,51.483775],[-0.338557,51.483756],[-0.338764,51.483689],[-0.33884,51.483776],[-0.338867,51.483806],[-0.338871,51.483811],[-0.338387,51.483973],[-0.338008,51.484098],[-0.337915,51.484129],[-0.337889,51.484138],[-0.337878,51.484126],[-0.337847,51.48409],[-0.337843,51.484085]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"03/09/2029","bo_system":"Northgate M3","decision_date":"04/09/2026","centroid_easting":515494.0,"actual_commencement_date":null,"id":"Hounslow-P_2025_3080","lpa_name":"Hounslow","decision_target_date":"04/09/2026","valid_date":"02/02/2026","development_type":"Minor dwellings","last_updated":"2026-09-04T13:10:10.264Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.484004,"lon":-0.338097},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"Wood Lane","appeal_decision":null,"title_number":null,"site_name":null,"appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":148.83,"non_residential_details":{"total_gia_existing":193.13,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":148.83},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":193.13,"gia_gained":148.83,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":193.13,"surface_water_discharge_percentage_reduction":1,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":1.21,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"05/2026","intended_commencement_date":"12/2025"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_active_fast_ev_charging_points":1,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"no_passive_fast_ev_charging_points":0}},"epc_number":null,"uprn":"100021577082","actual_completion_date":null}