{"borough":"Hounslow","application_type":"All Other","decision":"Approved","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: \r\n0206 P01, 0209 P06, 0210 P07, 0231 P01, 0300 P03, 0301 P03, 0302 P03, 0320 P05, 0321 P05, 0322 P05, 0340 P03, 0341 P03, 0342 P03. Received: 02/04/2026.\r\nEnergy Strategy. Received: 08/01/2026\r\n0100 P04, P0105 P03, 0110 P02, 0111 P03, 0120 P02, 0130 P02, 0131 P02, 0132 P02, 0133 P1, 0134 P1, 0200 P03, 0205 P03, 0211 P05, 0212 P06, 0213 P07, 0220 P06, 0405 P02, 0410 P02, 0411 P01, 0420 P02, 0430 P03, HCLA Planning Fire Statement, 9003 P03, 9004 P03. Received: 15/10/2025\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe samples/details shall include: \r\n(a)\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond;\r\n(b)\tCladding materials / render (including specifications where relevant);\r\n(c)\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies;\r\n(d)\tWindow types; and sectional drawings of reveals / sills / head details \r\n(e)\tBalcony details (including soffits, panels and frame);\r\n(f)\tAll privacy measures (including obscure glazing details, privacy screens etc.);\r\n(g)\tBalustrading treatment to balconies and roof areas (including details / sections / materials); and handrails\r\n(h)\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate\r\n(i)\tBalustrading treatment (including details / sections / materials); and\r\n(j)\tAny other materials / details / fittings to be used (including solar panels, extract vents, boiler flues etc.), with sections and on-site samples where appropriate\r\nThe development shall then be carried out in accordance with the approved details and maintained as such.\r\nReason.  In order to protect the appearance of the area thereafter.\r\n","Condition : 4 - No cables, wires, aerials, pipework (except any rainwater downpipes as may be shown on the approved drawings), meter boxes or flues shall be fixed to any elevation facing a highway. \r\nReason: In order to protect the appearance of the area and neighbours' living conditions.\r\n\r\n","Condition : 5 - The basement and ground floor commercial premises shall be used for Use Class E(a), (b), (c), (e) and (g)(i) and for no other purpose (including any other purpose in Class E of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), nor in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification.\r\nReason: The Council is satisfied that the use hereby permitted would not result in detriment to adjoining properties but would wish to control future changes of use within the same Use Class to protect nearby land uses and the character of the area.\r\n\r\n\r\n","Condition : 6 - Land quality - intrusive site investigation\r\nPrior to commencement of the development hereby approved:\r\nFollowing the completion of the Phase I desk study report, if intrusive investigations or gas monitoring is recommended, a Phase II site investigation must be undertaken.\r\nNo development other than necessary works to enable intrusive investigations shall take place until a Phase II site investigation report, prepared by a suitably qualified, experienced or supervised person, has been submitted to and approved in writing by the local planning authority.\r\nThis report shall identify the areas and sources of land contamination that exist on the site and identify the scope of site remediation measures necessary before the development commences.\r\nThe investigation shall be carried out by a competent person(s), based on the initial Conceptual Site Model (CSM) and on-site observations, to identify the extent and nature of contaminants. The initial CSM shall be updated accordingly following a tiered risk assessment based on the findings of the investigation, and where applicable, the report shall include proposals to deal with the identified contamination on site.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe report shall include details of such sampling of soil, soil vapour, ground gas, leachate, surface water and/or groundwater at such locations and depths as are considered to characterise the site conditions based on the initial Conceptual Site Model (CSM) and on-site observations during investigation work. \r\n(ii)\tThe investigation and the report must adhere to current UK guidance and best practice.\r\n(iii)\tFurther investigation shall be carried out at such locations and at such depths as the local planning authority may stipulate if this report  is found to be i","Condition : 7 - Land quality � Remediation Method Statement/ Remediation Strategy\r\nPrior to commencement of the development hereby approved:\r\nIf a scheme for remediation is recommended in the Phase II site investigation for the site, no development shall take place until a remediation method statement prepared by a suitably qualified, experienced or supervised person to specify the works necessary to render the site suitable for its proposed end use, has been submitted to and approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe remediation method statement shall provide suitable details of how the risks of each pollutant linkages, as identified in the updated Conceptual Site Model, will be mitigated.\r\n(ii)\tThe report shall account for any comments made by the local planning authority. \r\n(iii)\tRemediation work shall be carried out in accordance with the approved remediation method statement for verification and validation before the development is first brought into use.\r\n(iv)\tThe Council requests that remediation method statement or site plans be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 8 - Land quality � additional/unexpected contamination found during development\r\nDuring the development:\r\nThe Local Planning Authority shall be notified immediately if any land contamination not previously identified is encountered during development. A competent person shall assess the contamination, where necessary, including soil and groundwater sampling and testing before any further part of the development that may be affected by the additional contamination that has been discovered continues.\r\nA revised remediation method statement, prepared by a suitably qualified, experienced or supervised person, shall be submitted in writing to the local planning authority for approval within one month of the discovery of such contamination.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tFurther remediation work to remove or manage additional contamination shall be carried out in accordance with the approved revised remediation method statement for verification and validation before the development is first brought into use. \r\n(ii)\tIn some instances, the local planning authority may require work on site to be ceased whilst the nature of additional contamination is investigated fully.\r\n(iii)\tThe Council requests that the revised remediation method statement or any site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 9 - Land quality - verification and validation of remedial work\r\nPrior to the development is first brought into use:\r\nThe agreed scheme for remediation, including any amendments, shall be fully implemented. A verification report produced upon completion of the remediation by a suitably qualified, experienced or supervised person shall be submitted in writing to the local planning authority for approval, before the development is first brought into use or in accordance with a programme approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tThe verification (closure) report shall revisit the conceptual site model and provide evidence that each aspect of the remediation plan has been implemented correctly and successfully in accordance with current UK guidance and best practice. Where applicable, the report shall describe how any additional/unexpected contamination encountered during development has been managed in line with the revised remediation method statement. \r\n(ii)\tThis report shall demonstrate that the development is suitable for its proposed use in terms of land quality.\r\n(iii)\tThe Council requests that the verification report or site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 10 - No demolition or development shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works.\r\n\r\nIf heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/development shall take place other than in accordance with the agreed stage 2 WSI which shall include:\r\n\r\nA. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works\r\nB. Where appropriate, details of a programme for delivering related positive public benefits\r\nC. The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI.\r\n\r\nReason: to safeguard the archaeological interest on this site\r\n","Condition : 11 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:\r\na.\ta statement setting out the design objectives and how these will be delivered;  \r\nb.\texisting and proposed finished levels or contours;  \r\nc.\tmeans of enclosure/boundary treatment(s) and retaining structures; \r\nd.\tpedestrian access and circulation areas; \r\ne.\thard surfacing materials;  \r\nf.\tminor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting, CCTV etc.); \r\ng.\tproposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc. indicating alignments, levels, access points, supports as relevant);  \r\nh.\trenewable energy installations (where relevant); \r\ni.\tplanting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and \r\nj.\tan implementation programme (including phasing of work where relevant);\r\nk.\tadditional detail on location and type of bird/bat boxes, maintenance and a commitment that any data collected is to be shared with the Council.\r\n\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\nReason: In order to ensure a satisfactory appearance ","Condition : 12 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted to the local planning authority for approval in writing a final detailed drainage design, including drawings and supporting calculations and an updated Drainage Assessment Form to be reviewed and approved by the Lead Local Flood Authority. A detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted and approved which demonstrates how the drainage system is to be maintained for the lifetime of the development. The development shall be carried out in strict compliance with the approved details.\r\nReason: In order to prevent the risk of flooding to and from the site.","Condition : 13 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the local planning authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: In order to ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed.","Condition : 14 - a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\n(b) Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a 61% reduction in emissions.\r\n\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 15 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 16 - (A) No development above ground level shall take place until details have been submitted to and approved by the local planning authority which demonstrate that:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n(B) The development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the local planning authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition. The development shall be maintained in accordance with the approved details at all times thereafter.\r\nReason: In the interests of sustainable development.","Condition : 17 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 18 - (a) No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until details have been submitted to and approved by the local planning authority of a scheme providing for the insulation of the proposed dwellings against the transmission of externally generated aircraft, road and rail noise (and vibration), taking account of any ventilation requirements necessary, in order to ensure that the maximum noise levels permitted within the dwellings will not exceed those that are specified in Table 4 of British Standard 8233:2014 [Living Rooms = 35 dB LAeq, 16 hours; Dining room/area = 40 dB LAeq, 16 hours; Bedroom = 35 dB LAeq, 16 hours during day-time (07:00 - 23:00) and Bedroom = 30 dB LAeq, 8 hours during night-time (23:00 - 07:00)], or any equivalent standards if replaced.\r\n(b) Before the development hereby permitted is first occupied or brought into use, post-completion noise tests shall be carried out by accredited/approved organisations with competence in environmental noise assessments for residential accommodation and test reports shall be submitted to and approved in writing by the local planning authority. Noise tests shall be carried out taking account of worst case environmental conditions, such as easterly operations at Heathrow, peak time traffic flows, wind speed and direction and presence of temperature inversion. Continuous logged data shall be submitted.\r\nReason: In order to secure acceptable living conditions for residents of the new dwellings.","Condition : 19 - No fans, louvres, ducts or other external plant shall be installed on the building(s) hereby permitted without the prior written approval of the local planning authority.\r\nReason: In order to protect the appearance of the area and neighbours' living conditions.","Condition : 20 - No deliveries or collections (including refuse and recyclable materials) shall be carried out at the approved commercial premises except between the hours of 7:00am and 10:00pm from Monday to Saturday, and 9:00am and 1:00pm on Sundays.\r\nReason: In order to protect neighbours' living conditions. ","Condition : 21 - Customers shall only be permitted on the premises between [07:00 � 23:00] Mondays � Sundays.\r\n\r\nReason: In order to protect neighbours' living conditions. \r\n\r\nNote:  If this approved use requires a trading licence from the Council (for example, because you intend to sell alcohol or offer entertainment) you should obtain this before you start to trade and note that the Licensing Panel will enquire about and wish you to disclose the terms of this permission and will likely align the terms of the licence with those set out here.  If your licence application seeks to exceed these hours, you will first need to have sought and obtained formally a variation to this condition by making a planning application.","Condition : 22 - All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases of the development hereby approved shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance (SPG) 'Control of Dust and Emissions During Construction and Demolition' dated July 2014, or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/.\r\nReason: In the interests of air quality and to protect neighbours' living conditions and the wider local environment.","Condition : 23 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 24 - No development shall commence until a scheme for the off-site highway works has been submitted to and approved in writing by the Local Planning Authority. The approved works shall be secured through a Section 278 Agreement under the Highways Act 1980 with the Local Highway Authority. No part of the development shall be brought into use until the approved off-site highway works have been completed in accordance with the approved details.\r\nReason: To ensure that the necessary off-site highway works are delivered in the interests of highway safety and the proper functioning of the local highway network.\r\n","Condition : 25 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tavoidance of peak hours for deliveries and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and implemented prior to commencement of construction;\r\n(n)\tthe use of operators that are members of TfL's Freight Opera","Condition : 26 - No development shall take place until a Construction Method Statement (CMS) relating to the basement hereby approved has been submitted to the Local Planning Authority. The CMS shall be certified by a qualified professional and give details of excavation, temporary works and construction techniques, including details of potential impacts on neighbouring land based on assessment of the geology and hydrology of the area. The approved CMS shall be adhered to throughout the construction period for the development.\r\nReason: In order to protect the living conditions of neighbouring residents, to minimise flood risk and to ensure highway safety is maintained.","Condition : 27 - Before the development hereby permitted is first occupied or brought into use, the existing vehicular access to Hanworth Road shall be permanently closed and kerbs and footway reinstated so that it cannot be used as an access across the pavement.\r\nReason: In order to enhance the pedestrian environment and to confine vehicular access to the permitted points in order to ensure that the development does not prejudice the free flow of traffic or highway safety along the adjacent highway.","Condition : 28 - No building shall be occupied until space has been laid out within the site, in accordance with approved plan nos. 0209 P06 and 0210 P07, for covered, secure and accessible cycle parking facilities that accord with the West London Cycle Parking Guidance. Provision shall be made for no fewer than fourteen bicycles for the residential use and four bicycles for the commercial use, and the space shall thereafter be retained and kept available for the parking of bicycles, prior to the commencement of the corresponding use.\r\nReason: In order to support sustainable transport objectives.","Condition : 29 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.","Condition : 30 - Before the development hereby permitted is first occupied or brought into use, a Delivery & Servicing Plan (including details of vehicle access and egress arrangements and times that servicing shall take place) shall be submitted to and approved in writing by the Local Planning Authority. The details shall accord with current guidance such as that issued by TfL and include measures required to ensure sufficient arrangements (physical as well as managerial) for the servicing, including refuse collection, of all aspects of the development, the timing of hours for deliveries by motor vehicles and a timetable for implementation. The development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the local planning authority is obtained to any variation.\r\nReason: In the interests of the safety of pedestrians and vehicles, to protect neighbours' living conditions and to support sustainable transport objectives.","Condition : 31 - The approved residential refuse and recycling store as shown on approved plan no. 0420 P02, shall be completed and made available for use before the development hereby permitted is first occupied or brought into use, and thereafter shall be retained for such use at all times without obstruction. Bins shall be stored within the store at all times and shall not be left on the public highway.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 32 - All refuse and recycling bins, delivery cages, trolleys or any other items linked to deliveries and collection in association with the approved development are to be stored within the building(s) at all times and only brought out onto the public highway when deliveries are being made or refuse collected.\r\nReason: To protect the quality of the local environment and to prevent obstruction and inconvenience to users of the public highway.","Condition : 33 - The access doorway to the commercial unit(s) shall have: a minimum clear width of 900mm; a level surface or ramp between the pavement and the floor not exceeding a gradient of 1:12; a door handle set no more than one metre above ground level and a 400 mm high steel 'kick plate' suitable for the needs of wheelchair users or shall be automatic opening.  In cases where the door has no frame and is part of a fully glazed frontage, the door and glazed frontage hereby approved shall be clearly defined with visual manifestations on the glass at two levels: between 850mm to 1000mm and 1400mm to 1600mm above ground level. The manifestations shall be fixed to, painted on or etched into the glass in the form of a continuous or broken (by no more than 20 mm) horizontal band 50 mm high, or a series of signs or logos at least 150mm high spaced no further than 300 mm apart.  The manifestations shall visually contrast with their surroundings when viewed from both inside and outside the building in all lighting conditions.  \r\nReason: In order to ensure that the development complies with inclusive design principles."],"last_synced":"2026-07-17T01:58:00.868Z","centroid_northing":175785,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3100","lpa_app_no":"P/2025/3100","site_number":"115","ward":"Hounslow Central","locality":"Hounslow","last_date_consultation_comments":"13/11/2025","date_building_work_started_under_previous_permission":null,"description":"Demolition of existing building and erection of a four-storey building with commercial space on the ground and basement, with seven flats above with associated amenity space, refuse and cycle storage.","parking_details":{"no_proposed_cycle":18,"net_cycle":18,"no_proposed_car":0,"net_car":0,"no_existing_cycle":0,"no_existing_car":0},"postcode":"TW3 1QT","appeal_status":null,"cil_liability":true,"date_building_work_completed_under_previous_permission":null,"pp_id":"14258698","status":"Approved","last_updated_by":"PP overwrite repair","polygon":{"geometries":[{"coordinates":[[[514114.820189,175793.07543],[514108.119844,175790.575413],[514110.51983,175789.775858],[514120.869795,175773.57599699998],[514122.87010900007,175770.425475],[514130.12033600005,175759.926046],[514130.620358,175759.22631],[514133.66576,175761.688902],[514135.320213,175763.025511],[514145.770366,175771.346194],[514144.980353,175772.675829],[514144.533368,175773.334475],[514144.370223,175773.575587],[514142.670112,175775.826068],[514141.619877,175777.32565899997],[514140.469821,175778.876415],[514134.270199,175787.425645],[514128.969842,175798.57626500004],[514126.570169,175797.625707],[514120.270354,175795.175819],[514114.820189,175793.07543]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.35824,51.469545],[-0.358241,51.469518],[-0.358284,51.469519],[-0.358283,51.469546],[-0.35824,51.469545]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"30/04/2029","bo_system":"Northgate M3","decision_date":"01/05/2026","centroid_easting":514130,"actual_commencement_date":null,"id":"Hounslow-P_2025_3100","lpa_name":"Hounslow","decision_target_date":"01/05/2026","valid_date":"21/10/2025","development_type":"Minor dwellings","last_updated":"2026-07-16T18:52:50.751Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.469532,"lon":-0.358262},"decision_process":null,"application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"High Street","appeal_decision":null,"title_number":null,"site_name":"115-119 Unit 1","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":1396,"non_residential_details":{"total_gia_existing":478,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":478,"total_gia_gained":1396},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":478,"use_class":"EA","gia_gained":535,"gia_lost":478},{"gia_existing":0,"use_class":"C3","gia_gained":861,"gia_lost":0}],"building_details":[{"no_storeys":4,"max_height":14.91,"building_ref":"New Development"}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":478,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.06,"total_gia_lost":478,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"08/2027","intended_commencement_date":"02/2026"}],"residential_details":{"total_no_existing_residential_affordable_units":0,"total_no_proposed_bedrooms":11,"total_no_existing_residential_units_intermediate":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_proposed_residential_units_starter_homes":0,"residential_units":[{"change_type":"Gain","unit_type":"Communal Space","gia":142},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":89},{"no_habitable_rooms":2,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":1,"tenure":"Market for rent","gia":53},{"no_habitable_rooms":2,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":1,"tenure":"Market for rent","gia":51},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":93},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":77},{"no_habitable_rooms":2,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":1,"tenure":"Market for rent","gia":53},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":79}],"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_existing_residential_units":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_gia_gained":637,"total_no_proposed_residential_units":8,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_shared_equity":0,"dwelling_density":0,"total_no_proposed_residential_units_intermediate":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_proposed_residential_units_market_for_rent":7,"total_no_existing_residential_units_social_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"urban_greening_factor_score":0},"occupation_status":"Occupied"},"epc_number":null,"uprn":10094945680,"actual_completion_date":null}