{"last_updated_by":"Northgate M3","development_type":"Minor dwellings","decision_target_date":"04/09/2026","site_number":"125","centroid_easting":513195.0,"postcode":null,"lpa_name":"Hounslow","centroid_northing":175475.0,"date_building_work_started_under_previous_permission":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - In accordance with approved drawings\r\n\r\nThe development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [Daylight and sunlight report, energy statement, fire statement, planning, design and access statement, 00-EX-IFQH, noise impact report, 05-AP/PR-IFQH, 06-AB/AB-IFQH, 01-AP/PR-IFQH, 02-AP/PR-IFQH, 03-AP/PR-IFQH, 04-AP/PR-IFQH, 07-PR-IFQH, 08-AP-IFQH, 09-PR-IFQH\r\nReceived: 16/06/2026]. \r\n\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.\r\n","Condition : 3 - No development above ground level shall take place until full details and samples of\r\nall materials to be used in the construction of the external surfaces of the\r\ndevelopment hereby permitted have been submitted to and approved in writing by\r\nthe local planning authority. Details must include a detailed schedule of materials, a\r\nphotographic sample board and rendered drawings, elevations and sections at a\r\nsufficient scale (1:20 or 1:50) to illustrate how all external materials will appear\r\ntogether.\r\nThe details shall include:\r\n(a) Brick/stonework (including brick, stone, masonry, brick panels, feature brick\r\npanel, brick framing feature and mortar on-site sample panel, minimum one metre\r\nby one metre) including all mortar colours, joint type, brick bond;\r\n(b) Cladding materials / render (including specifications where relevant);\r\n(c) Tiles / roof covering; including parapet coping / capping materials, dormers\r\nand canopies;\r\n(d) Window types; and sectional drawings of reveals / sills / head details\r\n(e) Balcony details (including soffits, panels and frame);\r\n(f) Any privacy measures (including obscure glazing details, privacy screens\r\netc.);\r\n(g) Balustrading treatment to balconies and roof areas (including details /\r\nsections / materials / handrail treatments); and\r\n(h) Any other materials/details / fittings to be used (including solar panels,\r\nextract vents, rainwater goods, boiler flues etc.), with sections and on-site samples\r\nwhere appropriate\r\nThe development shall then be carried out in accordance with the approved details\r\nand maintained as such thereafter.\r\nReason: In order to protect the appearance of the area.","Condition : 4 - No external utility boxes (for gas and electricity) shall be affixed to the building and any cables, wires, aerials, pipework, meter boxes or flues shall be discreetly integrated into the building and shall not be fixed to any elevation or roof slope facing a highway. \r\nNo fans, louvres, ducts, water tanks or other external plant shall be installed on the building hereby permitted without the prior written approval of the local planning authority. \r\nNo advertisements shall be displayed on the development without details of the advertisements having first been submitted to and approved in writing by the Council through securing of Advertisement Consent and/or Planning Permission. \r\nReason: In order to safeguard the visual amenity of the area and neighbours living conditions.\r\n","Condition : 5 - Construction Logistics Plan\r\n\r\nNo development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: \r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tprovisions to ensure harm does not occur to nearby sensitive receptors as a result of dust, emissions etc. \r\n(f)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(g)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(h)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(i)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(j)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(k)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(l)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(m)\tno deliveries before 9.30am and after 3pm to avoid peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway\r\n(n)\tall necessary traffic orders and other per","Condition : 6 - Notwithstanding the submitted details and prior to occupation, full details (including manufacturer's specifications) of all cycle stands for the occupants of the development shall be submitted to and approved in writing by the Local Planning Authority, conforming with the current London Plan Cycle Parking Guidance (or such other guidance as shall supersede it) in design and layout.\r\nThe approved facilities shall be fully implemented and made available for use before any part of the development is first occupied and thereafter retained for use at all times without obstruction.\r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 7 - Water efficiency\r\n\r\nThe development shall achieve an internal water usage of 105 Litres per person per day or less. \r\n\r\nReason: In order to protect and conserve water supplies and resources \r\n","Condition : 8 - Sustainable Materials\r\n\r\nThe development hereby approved shall make best efforts to achieve or attempt to achieve:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n\r\nReason: In the interests of sustainable development.\r\n","Condition : 9 - Energy Strategy\r\n\r\nA. The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\nB. Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure) shall be submitted to the Local Planning Authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy and any subsequent approved revisions.\r\n\r\nReason: In order to ensure the development meets sustainability standards.\r\n","Condition : 10 - Prior to occupation a car parking management plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include details about: \r\nI.\tHow spaces will be managed;\r\nII.\tHow the parking spaces will be restricted from use by the new residents of the development including details of any restrictions and the enforcement of such restrictions. \r\nThe measures as approved shall be implemented before the first occupation of the development hereby permitted and shall be maintained for the duration of the use unless the prior written approval of the local planning authority is obtained to any variation. \r\nReason: To control the level and usage of parking on the site and to support sustainable transport objectives.\r\n","Condition : 11 - Prior to occupation details of both hard and soft landscape works shall be submitted to and approved in writing by the Local Planning Authority.\r\n\r\nThese details shall include:\r\n\r\n(a)\ta statement setting out the design objectives and how these will be delivered; \r\n(b)\tmeans of enclosure/boundary treatment(s) and retaining structures;\r\n(c)\tpedestrian access and circulation areas;\r\n(d)\thard surfacing materials; \r\n(e)\tminor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting, CCTV etc.); \r\n(f)\tplanting plans and written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and\r\n(g)\tan implementation & maintenance programme (including phasing of work where relevant).\r\n\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\n\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.\r\n","Condition : 12 - Mechanical services noise control \r\nA)\tThe cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved and shall demonstrate a rate of 4 air changes per hour in all habitable rooms that is unrestricted. \r\nB)\tThe plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nReason: In order to protect neighbours' living conditions.\r\n","Condition : 13 - Noise\r\n\r\nA)\t No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until details have been submitted to and approved by the local planning authority of a scheme providing for the insulation of the proposed dwellings against the transmission of externally generated aircraft, road and rail noise (and vibration), taking account of any ventilation requirements necessary, in order to ensure that the maximum noise levels permitted within the dwellings will not exceed those that are specified in Table 4 of British Standard 8233:2014 [Living Rooms = 35 dB LAeq, 16 hours; Dining room/area = 40 dB LAeq, 16 hours; Bedroom = 35 dB LAeq, 16 hours during day-time (07:00 - 23:00) and Bedroom = 30 dB LAeq, 8 hours during night-time (23:00 - 07:00)], or any equivalent standards if replaced. \r\n\r\nB)\tPrior to the first occupation of the development hereby permitted post completion noise tests shall be carried out by accredited/approved organisations in order to demonstrate that this has been achieved. The test reports shall be submitted to and approved in writing by the local planning authority. The measures shall be retained thereafter.\r\n\r\nReason: In the interests of residential amenity\r\n","Condition : 14 - Reinstate footway\r\n\r\nBefore the development hereby permitted is first occupied or brought into use, the existing vehicular access to 125-135 STAINES ROAD TW3 3JB from Staines Road shall be permanently closed and kerbs and footway reinstated so that it cannot be used as an access across the pavement. \r\n\r\nReason: To enhance the pedestrian environment and to confine vehicular access to the permitted points to mitigate the additional on street parking demand in order to ensure that the development does not prejudice the free flow of traffic or highway safety along the adjacent highway\r\n","Condition : 15 - Restriction on car permits\r\n\r\nBefore the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\n\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.\r\n","Condition : 16 - Submission of a Glint & Glare Assessment\r\n\r\nNo solar panels shall be installed until a glint and glare assessment has been submitted to and approved in writing by the Local Planning Authority. No subsequent alterations to the approved scheme are to take place unless submitted to and approved in writing by the Local Planning Authority.\r\n\r\nReason: To ensure the development does not endanger the safe movement of aircraft or the operation of Heathrow Airport. The airport requires a glint and glare assessment to be completed to determine the full impact on Air Traffic Control Tower and pilots approaching the airport.\r\n"],"application_type":"All Other","date_building_work_completed_under_previous_permission":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"07/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":355,"site_area":0.23720000000000002,"total_gia_existing":3533,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":3533,"gia_gained":355,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":355,"total_gia_existing":3533,"total_gia_lost":0},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":3,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":78,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for rent","gia":78}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":1,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":1,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true,"urban_greening_factor_score":0},"ownership_status":"Private","occupation_status":"Occupied"},"status":"Approved","epc_number":null,"appeal_decision":null,"appeal_start_date":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.372149,51.466936],[-0.372241,51.467095],[-0.372244,51.467094],[-0.372284,51.467164],[-0.372319,51.467222],[-0.372322,51.467226],[-0.372165,51.467245],[-0.372133,51.467249],[-0.372102,51.467253],[-0.372066,51.467259],[-0.37203,51.467264],[-0.372003,51.467269],[-0.371977,51.467273],[-0.371971,51.467274],[-0.371966,51.467274],[-0.371961,51.467274],[-0.371957,51.467273],[-0.371865,51.46729],[-0.371777,51.4673],[-0.371771,51.467289],[-0.371738,51.467231],[-0.371726,51.46721],[-0.371691,51.46717],[-0.371683,51.467162],[-0.371652,51.467112],[-0.371646,51.467113],[-0.371593,51.467018],[-0.371521,51.466896],[-0.371511,51.466877],[-0.371506,51.466867],[-0.371506,51.466866],[-0.371497,51.46685],[-0.371496,51.466849],[-0.371476,51.466812],[-0.371946,51.466707],[-0.372012,51.466692],[-0.372149,51.466936]]]},"application_type_full":"Full planning permission","last_date_consultation_comments":"08/07/2026","borough":"Hounslow","pp_id":"14424234","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3409","last_updated":"2026-09-07T08:00:11.891Z","site_name":"Quest House","valid_date":"16/06/2026","decision_process":null,"actual_completion_date":null,"decision_agency":"Borough","centroid":{"lon":-0.371816,"lat":51.466933},"reference_no_of_permission_being_relied_on":null,"cil_liability":true,"decision_date":"03/09/2026","bo_system":"Northgate M3","ward":"Hounslow West","locality":"Hounslow","lpa_app_no":"P/2025/3409","appeal_status":null,"street_name":"Staines Road","uprn":"100023403169","polygon":{"geometries":[{"coordinates":[[[513171.8700935941,175474.77673380397],[513165.07033086265,175492.37716714753],[513164.92009079474,175492.22696248046],[513161.91992624814,175499.92735722038],[513159.3704894193,175506.32702668107],[513159.17034399125,175506.82768976502],[513170.02005905466,175509.17728600634],[513172.21992069104,175509.62673430005],[513174.370276681,175510.17744044831],[513176.8203045231,175510.87722242024],[513179.3205069643,175511.47687623213],[513181.17023768486,175512.07764171925],[513183.0205514428,175512.5271093782],[513183.41999060014,175512.62722453132],[513183.77050776186,175512.6772980029],[513184.12005354563,175512.6772835948],[513184.41998277925,175512.62721204484],[513190.7699049993,175514.5774975137],[513196.8051053867,175515.8559637296],[513197.28994898644,175514.62683006504],[513199.7099702379,175508.26771855186],[513200.5803982497,175505.9373001434],[513203.1090540516,175501.56877987325],[513203.66042826744,175500.61752661626],[513205.9963802013,175495.10200128116],[513206.41306594736,175495.2703726265],[513210.3200219689,175484.82645444252],[513215.57011643506,175471.3271573115],[513216.32048547885,175469.2399096067],[513216.72050885274,175468.1261877855],[513216.75029498263,175468.03672922082],[513217.40024483483,175466.2465390477],[513217.4300309878,175466.15708048583],[513218.9200592518,175462.02685155888],[513186.5702556019,175449.68614033383],[513181.9700242432,175447.9260541933],[513171.8700935941,175474.77673380397]]],"type":"Polygon"}],"type":"geometrycollection"},"lapsed_date":"02/09/2029","title_number":null,"secondary_street_name":null,"decision":"Approved","actual_commencement_date":null,"subdivision_of_building":null,"description":"Erection of a front infill extension to create one additional flat at fifth floor level and enlargement of eight existing flats with associated alterations","parking_details":{"no_existing_car":61,"net_car":0,"no_proposed_car":61},"id":"Hounslow-P_2025_3409","appeal_decision_date":null,"last_synced":"2026-09-08T01:58:54.005Z"}