{"last_updated_by":"Northgate M3","development_type":"Minor dwellings","decision_target_date":"25/02/2026","site_number":"107","centroid_easting":516149.0,"postcode":"TW7 6PN","lpa_name":"Hounslow","centroid_northing":175945.0,"date_building_work_started_under_previous_permission":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall be begun before the expiration of three years from the date of the original permission P/2021/3635 dated 19/04/2022.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004\r\n","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications:\r\n[Unnumbered Planning Statement, 252028/PS/RS/KL/01]\r\n\r\nand shall conform in all other respects to the drawings and documentations approved under planning permission P/2021/3635:\r\n([Planning Statement], [Design and Access Statement], [Travel Plan], [Transport Statement], [Health and Safety Construction Phase and Construction Logistics Plan], [Letter of Support from Cllr Sampson], [Fire Safety Plan], [Fire Safety Statement], [Environmental Noise Assessment], [Drainage Strategy], [WRD-089-01], [WRD-089-05], [WRD-089-06], [WRD-089-07], Received: 17/09/2021, [Statement of Community Involvement - Revision 2], Received: 16/11/2021, [Market Demand Report], [Letter from Richard Conroy (agent) in respect of Market Demand], Received: 29/11/2021, [WRD-089-20-C], [WRD-089-21-C], [WRD-089-22-B], [WRD-089-23-B], [WRD-089-24-A], [WRD-089-30-B], Received: 01/12/2021, [WRD-089-25-C], [WRD-089-26-C], [WRD-089-27-B], [WRD-089-28-B], Received: 04/01/2022, [Parking Survey], Received: 31/01/2022, [Energy Statement], Received: 24/03/2022])\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development shall take place above ground level until samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. - brick (including brick, feature brick panel, brick framing feature); - Tiles/ Roof covering; - Coping - window treatment (including sections/reveals, quoin detail, screens); - all privacy measures; and - any other materials/details to be used. The development shall be carried out in accordance with the approved details and maintained as such thereafter. \r\nReason: In order that the Council may be satisfied as to the details of the development in the interests of the visual amenity of the area.\r\n","Condition : 4 - Notwithstanding the details shown on the approved plans, prior to first occupation of the hereby approved development, details of secure cycle storage arrangements in accordance with both the London Plan and adopted Local Plan shall be submitted to and approved in writing by the local planning authority. The cycle stores shall be made available to occupants upon first occupation of the hereby approved development and maintained as such thereafter without obstruction. \r\nReason: To ensure that secure cycle spaces are provided and retained for the occupiers of the residential units.\r\n","Condition : 5 - Prior to commencement of development, a Construction Logistics Plan shall be submitted to an approved by the Local Planning Authority. The development shall take place in accordance with the details approved. The CLP must contain the following details: \r\no A site plan; \r\no A pre-start record of site condition on the adjoining public highway to be agreed with the Council; \r\no Provision for the parking of vehicles of site operatives and visitors; \r\no Provision for loading and unloading of plant and materials used in constructing the development; \r\no Provision for the storage of plan and materials used in constructing the development; \r\no The erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; \r\no Wheel washing facilities at the site exit; \r\no Measures to control the emission of dust and dirt during construction; \r\no A scheme for recycling/ disposing of waste resulting from demolition and construction works; \r\no Appropriate vehicle routes to and from the site; \r\no Measures to ensure the safety of all users of the public highway especially in the vicinity of the site; \r\no Use of operators committed to best practice, demonstrated by membership of TFL's Freight Operator Recognition Scheme, or similar; \r\no Measures to promote sustainable travel to work; \r\no Swept path analysis for HGV's including dustcarts; and \r\no Measures to ensure that all existing neighbouring residents and are informed of the schedule of works throughout the process of construction. \r\nReason: To ensure that the construction takes place in an acceptable manner and would not cause harm to neighbouring buildings or the wider area.\r\n","Condition : 6 - The hereby approved development must be carried out in accordance with the approved Energy Statement received 18/02/2021. \r\nUpon final commencement of operation of any low- and zero-carbon technologies, performance data for energy consumption must be submitted to and approved in writing by the Local Planning Authority. The performance data shall be submitted every 18 months to a monitoring web-platform for a period of three years from the point of full operation. \r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions in accordance with London Plan Policy SI2 and the London Borough of Hounslow Local Plan Policy EQ1.\r\n","Condition : 7 - Prior to commencement of development (excluding site investigations and demolition) the applicant shall have entered into a formal agreement with the Council to provide a payment of � 4,397.55 towards its Carbon Offset Fund. \r\nReason: To ensure the development meets sustainability standards\r\n","Condition : 8 - Notwithstanding the approved plans, prior to commencement of development (excluding site investigations and demolition), a finalised drainage design and strategy shall be submitted to and approved in writing by the Local Planning Authority. \r\nThis shall include: \r\n- Drawings and supporting calculations, and an updated Drainage Assessment Form to reflect the submitted details; \r\n- Details of how the drainage for the development accords to the drainage hierarchy and makes use of green infrastructure technology to comply with the hierarchy set out in London Plan Policy SI3 and achieving a runoff rate which shall not exceed 2 litres/second. \r\n- A detailed management plan confirming routine maintenance tasks for all drainage components which demonstrates how the drainage system is to be maintained for the lifetime of the development. \r\nThe development shall thereafter be carried out in accordance with the approved details prior to the first occupation of the buildings approved. \r\nReason: To prevent the risk of flooding at and from the site\r\n","Condition : 9 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the Local Planning Authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components. \r\nReason: To ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed.\r\n","Condition : 10 - Prior to first occupation of the building(s) evidence (schedule of fittings and manufacturers literature) shall be submitted to the Local Planning Authority and approved in writing to show that the development has achieved an internal water use of 105 Litres per person per day or less. \r\nReason: In order to protect and conserve water supplies and resources.\r\n","Condition : 11 - The developments shall not be occupied until evidence (e.g. photographs and copies of delivery notes, invoices or installation contracts) have been submitted to the Local Planning Authority to demonstrate that the development meets the following: \r\n- At least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification. \r\n- At least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme. \r\n- No construction or insulation materials are to be used which will release toxins into the internal and external environment, including those that deplete stratospheric ozone. \r\nReason: In order to ensure the sustainable sourcing of materials.\r\n","Condition : 12 - Notwithstanding the details on the approved plans, prior to the occupation of the hereby approved development, details of hard and soft landscaping, including planting, hard and soft surfaces and boundary treatment shall be submitted to and approved in writing by the Local Planning Authority and retained as such thereafter. Including details of the long term management of each element. Any trees or plants that, within 5 years of planting, die, are cut down, uprooted, destroyed or become (in the opinion of the Local Planning Authority) seriously damaged or defective, shall be replaced with another tree or plant of the same size and species within the first planting season following its death, removal, uprooting or destruction, unless the Local Planning Authority gives its prior written approval to any variation. \r\nReason: To ensure a satisfactory appearance of the site and the adjacent the area, to provide satisfactory levels of play equipment and to enhance green infrastructure and biodiversity in accordance with policies SC5, CC1, CC2, GB4, GB7 and GB9 of the Local Plan (adopted 2015) and policies D4, D5, D8, S4, G1, G5, G6 and G7 of the London Plan (adopted 2021) and the Mayor of London's The Shaping Neighbourhoods: Play and Informal Recreation SPG coupled with the requirements of the National Planning Policy Framework.\r\n","Condition : 13 - No demolition or construction work shall take place on the site, except between the hours of 8:00am to 6:00pm on Mondays to Friday and 9:00am to 1:00pm on Saturdays and none shall take place on Sundays and Public Holidays without the prior written approval of the Local Planning Authority. \r\nReason: To safeguard the amenities of adjoining residential properties and the area.\r\n","Condition : 14 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), residents of the development shall be eligible to obtain up to one resident's parking permit per dwelling within the Controlled Parking Zone within the Linkfield Road Area. Any occupiers of the approved development shall surrender any additional permits wrongly issued or held.\r\nReason: To protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.\r\n","Condition : 15 - No development shall take place until the following details have been submitted to and approved in writing by the Local Planning Authority \r\n(a) A plan showing the position of each tree on the site and on land adjacent to the site (including street trees) that could influence or be affected by the development, indicating which trees are to be removed; \r\n(b) A schedule in relation to each tree identified listing species, diameter and approximate height, and an assessment on the general state of health and stability of each tree, in accordance with British Standard 5837:2012 (or in an equivalent British Standard if replaced); and any proposed pruning, felling or other works; \r\n(c) Details of any proposed alterations to existing ground levels, and of the position of any proposed excavation, that may affect the root protection area of retained trees; \r\n(d) Details of the fencing to be installed for the protection of retained trees. \r\nThe development shall not be carried out otherwise than in accordance with the approved details which shall be put into effect at the commencement of work on site and permanently retained for the duration of the development works. \r\nReason: To ensure a satisfactory appearance of the site and the area and to promote biodiversity.\r\n","Condition : 16 - Before the development hereby permitted is first occupied or brought into use, the Travel Plan hereby permitted shall be implemented in accordance with the timescales specified therein, to include those parts identified as being implemented before and following occupation, unless alternative timescales are agreed in writing with the Local Planning Authority. The approved Travel Plan shall be monitored and reviewed in accordance with the agreed Travel Plan targets and timescales to the satisfaction of the Local Planning Authority. \r\nReason: To promote sustainable modes of transport.\r\n","Condition : 17 - No additional windows or other glazed openings shall be formed in the walls of any dwelling hereby approved and no additional doors inserted in the building without the prior written consent of the Local Planning Authority. \r\nReason: To protect neighbours' living conditions and to ensure that the accommodation provided is appropriate and respects the character and appearance of the area in accordance with Policies CC1 and CC2 of the adopted Local Plan.\r\n","Condition : 18 - Prior to occupation, a Parking Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include the following:\r\ni.\tdetails of parking allocations and how this will be operated and enforced; \r\nii.\tdetails of measures proposed to restrict parking to designated bays only and prohibit parking; \r\niii.\ta commitment to convert passive EV bays to active when demand requires;\r\niv.\ta commitment to remove parking spaces when residents that have a right to park move out or their circumstances change so that they no longer need a space;\r\nv.\tmeasures to ensure that all existing residents and prospective residents are informed of the Parking Management Plan and that all future residents will not be assigned a parking space or a right to park within the development other than blue badge holders. \r\nThe car parking areas shall thereafter be managed in compliance with the approved Parking Management Plan.\r\nReason: In order to promote sustainable modes of transport and safeguard the amenities of surrounding residential properties and ensure minimal disruption of traffic in the locality, in accordance with policies CC1, CC2 and EC2 of the Local Plan (adopted 2015) and policies T4 and T6 of the London Plan (adopted 2021) coupled with the requirements of the National Planning Policy Framework 2019.","Condition : 19 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the buildings hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the Local Planning Authority. \r\nReason: To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site\r\n","Condition : 20 - The nursery premises shall be used for Class F1(a) and for no other purpose (including any other purpose in Class F of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), nor in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification. \r\nReason: The Council is satisfied that the use hereby permitted would not result in detriment to adjoining properties but would wish to control future changes of use within the same Use Class to protect nearby land uses and the character of the area.\r\n","Condition : 21 - The approved refuse and recycling store for the nursery use as shown on approved plan no. WRD-089-21-C shall be completed and made available for use before the development hereby permitted is first occupied or brought into use, and thereafter shall be retained for such use at all times without obstruction. Bins shall be stored within the store at all times and shall not be left on the public highway. \r\nReason: In order to ensure adequate provision for waste and recycling.\r\n","Condition : 22 - The approved refuse and recycling stores for the residential use as shown on approved plan no. WRD-089-21-C shall be completed and made available for use before the development hereby permitted is first occupied or brought into use, and thereafter shall be retained for such use at all times without obstruction. Bins shall be stored within the store at all times and shall not be left on the public highway. \r\nReason: In order to ensure adequate provision for waste and recycling.\r\n","Condition : 23 - Before the development hereby permitted is first occupied or brought into use, the applicant shall have entered into a formal agreement with the Council to provide a payment towards the changes to the Councils Traffic Management Order. \r\nReason: To protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.\r\n"],"application_type":"All Other","date_building_work_completed_under_previous_permission":null,"application_details":{},"status":"Approved","epc_number":null,"appeal_decision":null,"appeal_start_date":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.329677,51.470486],[-0.329679,51.470558],[-0.329681,51.470663],[-0.329678,51.470671],[-0.329672,51.470679],[-0.329665,51.470686],[-0.329659,51.470692],[-0.329651,51.470698],[-0.329643,51.470702],[-0.329632,51.470706],[-0.329622,51.470709],[-0.329611,51.47071],[-0.3296,51.470711],[-0.329588,51.47071],[-0.329585,51.47071],[-0.329445,51.470702],[-0.329429,51.470701],[-0.329368,51.470697],[-0.329242,51.470691],[-0.329179,51.470687],[-0.329067,51.47068],[-0.32904,51.470678],[-0.329044,51.470656],[-0.329038,51.470644],[-0.329066,51.470527],[-0.329066,51.470524],[-0.32907,51.470504],[-0.329074,51.470483],[-0.329078,51.470458],[-0.329081,51.470452],[-0.329187,51.470452],[-0.329213,51.470452],[-0.329233,51.470452],[-0.329267,51.470453],[-0.329312,51.470457],[-0.329354,51.470462],[-0.329373,51.470463],[-0.329389,51.470464],[-0.329424,51.470465],[-0.329631,51.470464],[-0.329637,51.470462],[-0.32964,51.470461],[-0.329643,51.47046],[-0.329649,51.470461],[-0.329653,51.470461],[-0.329656,51.470462],[-0.329659,51.470463],[-0.329661,51.470464],[-0.329676,51.470465],[-0.329677,51.470486]]]},"application_type_full":"Removal/Variation of a condition","last_date_consultation_comments":"16/12/2025","borough":"Hounslow","pp_id":"14499364","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3477","last_updated":"2026-02-23T11:50:07.614Z","site_name":null,"valid_date":"18/11/2025","decision_process":null,"actual_completion_date":null,"decision_agency":"Borough","centroid":{"lon":-0.329155,"lat":51.470559},"reference_no_of_permission_being_relied_on":null,"cil_liability":false,"decision_date":"23/02/2026","bo_system":"Northgate M3","ward":"Isleworth","locality":"Isleworth","lpa_app_no":"P/2025/3477","appeal_status":null,"street_name":"St Johns Road","uprn":"10096682202","polygon":{"geometries":[{"coordinates":[[[516112.919165726,175936.0266141275],[516112.614183223,175944.01043178182],[516112.1689909416,175955.67602002126],[516112.4190249423,175956.62632935468],[516112.76887117256,175957.52662237248],[516113.21872744063,175958.2767686036],[516113.61902478535,175958.975717086],[516114.16889096587,175959.5757165964],[516114.7692081735,175960.12679931556],[516115.4691145925,175960.57668063184],[516116.1689704982,175960.87635838139],[516116.9690848513,175961.07596265158],[516117.71909315337,175961.12644694973],[516118.5693853526,175961.0757457845],[516118.769258287,175961.02578652732],[516128.4773557263,175960.3549035979],[516129.61874073354,175960.2763531202],[516133.8768345503,175960.0063207273],[516142.6428360272,175959.45082588476],[516146.96912073635,175959.17679696158],[516154.819372369,175958.52588664042],[516156.66905675095,175958.37671843584],[516156.468965176,175955.8765656668],[516156.91901823506,175954.5761774585],[516155.2688550689,175941.52653730538],[516155.2687565239,175941.2261299637],[516155.0191776958,175938.97629850957],[516154.8191332698,175936.62634955934],[516154.61918861966,175933.8758627893],[516154.41929026024,175933.2259875039],[516147.0692565336,175933.02603751962],[516145.2690229808,175932.92600006814],[516143.8688356701,175932.92632351536],[516141.4692272855,175933.02623544913],[516138.36879422714,175933.3260080967],[516135.41875133815,175933.82614538138],[516134.0690912382,175933.9266465013],[516132.96936127124,175933.9761058499],[516130.519276874,175934.12605165463],[516116.1691782142,175933.6763573688],[516115.7688073971,175933.37683449994],[516115.5691312959,175933.32666339364],[516115.36920686293,175933.226419128],[516114.9189316906,175933.22616316733],[516114.6690271509,175933.27609414776],[516114.4691531918,175933.32605357486],[516114.2688330554,175933.42607033567],[516114.06876126764,175933.57616027072],[516113.0190368023,175933.62676439527],[516112.919165726,175936.0266141275]]],"type":"Polygon"}],"type":"geometrycollection"},"lapsed_date":"23/02/2029","title_number":null,"secondary_street_name":null,"decision":"Approved","actual_commencement_date":null,"subdivision_of_building":null,"description":"Variation of Condition 14 (Residential parking permits) to be re-worded to residents of the development shall be eligible to apply for up to one residents' parking permit per dwelling within Controlled Parking Zone LR of planning permission 00981/N/P13 (P/2021/3635) approved 19/04/2022 for the demolition of existing buildings and erection of three storey commercial building with basement car parking and six town houses with associated access arrangements, landscaping, refuse and cycle storage.","parking_details":null,"id":"Hounslow-P_2025_3477","appeal_decision_date":null,"last_synced":"2026-02-24T03:05:19.673Z"}