{"postcode":"TW3 2NJ","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: PRI24837 11B, 130_S_Bldg Rev P3, 130_GA00_Bldg Rev P3, 130_GA01_Bldg Rev P3, 130_GA02_Bldg Rev P3, 130_GARF_Bldg Rev P3, 130_GE01_Bldg Rev P3, 130_GE02_Bldg Rev P3, 130_GE03_Bldg Rev P3 and 130_GS01_Bldg Rev P3, 100 Rev P1 (received: 15.05.2026). \r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe samples/details shall include:  \r\na)\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond; \r\nb)\tCladding materials / render (including specifications where relevant); \r\nc)\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies; \r\nd)\tWindow types; and sectional drawings of reveals / sills / head details  \r\ne)\tAll privacy measures (including obscure glazing details, privacy screens etc.); \r\nf)\tBalustrading treatment to balconies and roof areas (including details / sections / materials); and handrails \r\ng)\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate \r\nh)\tBalustrading treatment (including details / sections / materials); and \r\ni)\tAny other materials / details / fittings to be used (including solar panels, extract vents, boiler flues etc.), with sections and on-site samples where appropriate \r\nThe development shall then be carried out in accordance with the approved details and maintained as such thereafter.\r\nReason.  In order to protect the appearance of the area thereafter.\r\n","Condition : 4 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the building(s) hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the local planning authority. \r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site. \r\n","Condition : 5 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:  \r\n�\ta statement setting out the design objectives and how these will be delivered;  \r\n�\tmeans of enclosure/boundary treatment(s) and retaining structures; \r\n�\tvehicle parking layouts;  \r\n�\tother vehicle and pedestrian access and circulation areas; \r\n�\thard surfacing materials;  \r\n�\tminor artefacts and structures (e.g. refuse or other storage units, etc.);  \r\n�\trenewable energy installations (where relevant); \r\n�\tplanting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and \r\n�\tan implementation programme.\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 6 - (a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy. \r\n(b) Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a 75% reduction in emissions. \r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 7 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target. \r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 8 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 9 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 10 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: \r\na.\ta site plan (showing the elements set out below); \r\nb.\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused; \r\nc.\tprovision for the parking of vehicles of site operatives and visitors; \r\nd.\tprovisions for loading, unloading and storage of plant and materials within the site; \r\ne.\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements; \r\nf.\tdetails of vehicle routeing from the site to the wider strategic road network; \r\ng.\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate; \r\nh.\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council; \r\ni.\ta scheme for recycling/disposing of waste resulting from demolition and construction works;  \r\nj.\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access; \r\nk.\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts; \r\nl.\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway; \r\nm.\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and implemented prior to commencement of c","Condition : 11 - No dwellinghouse shall be occupied until space has been laid out within the site in accordance with approved plan no. 130_GA00_Bldg for 4 bicycles to be parked and that space shall thereafter be kept available for the parking of bicycles; prior to commencement of the use.\r\nReason: In order to support sustainable transport objectives.","Condition : 12 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.","Condition : 13 - No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development shall not be carried out otherwise than in accordance with the approved details.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 14 - Before the dwelling hereby approved are first occupied, the developer shall provide to each dwelling a set of containers required at the time of development for household use for the storage and collection of recyclable materials for the purposes of the Council's kerbside recycling service, to the specification then in use by the local authority's recycling collection service and shall notify the Council's refuse and recycling services when the development is first occupied. The waste and recyclable materials containers shall be stored in a proprietary refuse bin enclosure designed for the purpose to be supplied by the developer and located adjacent to each dwelling. Each dwelling with a private garden shall also be supplied with a garden waste composting bin of at least 220 litres capacity at the same time. \r\nReason: In order to protect the quality of the local environment and neighbours' living conditions and to endure appropriate means of refuse storage are provided.","Condition : 15 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted to the local planning authority for approval in writing a final detailed drainage design, including drawings and supporting calculations [and an updated Drainage Assessment Form to be reviewed and approved by the Lead Local Flood Authority, aligned with the Sustainable Drainage Strategy (October 2025) and associated material hereby approved. A detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted and approved which demonstrates how the drainage system is to be maintained for the lifetime of the development. The development shall be carried out in strict compliance with the approved details. \r\nReason: In order to prevent the risk of flooding to and from the site.","Condition : 16 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the local planning authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: In order to ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed.","Condition : 17 - Prior to the commencement of development, (excluding demolition and site clearance), details of the final design of a surface water drainage scheme have been submitted to and approved in writing by the planning authority. The drainage details shall include. \r\na.\tInfiltration testing shall be carried out in accordance with BRE Digest 365 and confirmation of groundwater levels. Where infiltration is proposed confirmation is required of a 1m unsaturated zone from the base of any proposed soakaway to the seasonal high groundwater level and confirmation of half-drain times. \r\nb.\tDetailed design drawings for all sustainable drainage elements including cross sections and detailed drainage layout plan with proposed levels of drainage elements.\r\n","Condition : 18 - Before the development hereby permitted is first occupied or brought into use, the existing vehicular access to the site shall be permanently closed and kerbs and footway reinstated so that it cannot be used as an access across the pavement.\r\nReason: In order to enhance the pedestrian environment and to confine vehicular access to the permitted points in order to ensure that the development does not prejudice the free flow of traffic or highway safety along the adjacent highway."],"actual_commencement_date":null,"pp_id":"14214646","decision_target_date":"23/07/2026","valid_date":"09/12/2025","lpa_app_no":"P/2025/3481","locality":"Hounslow","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"Heath Road","last_synced":"2026-07-27T01:47:52.342Z","site_number":"1","centroid_easting":513863.0,"polygon":{"geometries":[{"coordinates":[[[513867.75651331275,175095.01363526436],[513868.5199469855,175088.6265227003],[513863.0218815585,175087.63570737198],[513859.3699082092,175086.97657953645],[513859.1594439701,175088.27696492674],[513858.95371947513,175089.5518662818],[513856.712620151,175103.40604147757],[513856.3850710162,175105.5293656657],[513855.5218650232,175111.1265198766],[513855.49342572363,175111.31057724304],[513855.119412131,175113.92686161556],[513861.8199410402,175115.12703231338],[513864.6697072806,175115.5768496883],[513865.0699275411,175112.876593685],[513866.31960105605,175104.9771921856],[513867.5319675504,175096.570718523],[513867.75651331275,175095.01363526436]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Hounslow Central","centroid_northing":175107.0,"application_type":"All Other","uprn":"100021550172","lapsed_date":"21/07/2029","actual_completion_date":null,"decision":"Approved","site_name":null,"borough":"Hounslow","last_date_consultation_comments":"05/01/2026","application_type_full":"Full planning permission","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3481","decision_date":"22/07/2026","bo_system":"Northgate M3","development_type":"Minor dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of a two storey house with private amenity space and landscaping following demolition of existing garage, rear bay window and kitchen/bathroom of adjacent existing two storey house","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-22T14:50:18.525Z","centroid":{"lon":-0.362322,"lat":51.463492},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"06/2027","intended_commencement_date":"07/2026"}],"total_gia_gained":99,"site_area":0.026000000000000002,"total_gia_existing":142.6,"total_gia_lost":38.6,"existing_proposed_floorspace_details":[{"gia_existing":142.6,"use_class":"C3","gia_gained":99,"gia_lost":38.6}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"building_details":[{"no_storeys":3,"max_height":9.6,"building_ref":"Dwelling 2"},{"no_storeys":2,"max_height":9.6,"building_ref":"Existing Dwelling"}],"green_suds":true,"surface_water_discharge_percentage_reduction":87,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":99,"total_gia_existing":142.6,"total_gia_lost":38.6},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":3,"total_no_proposed_residential_units":1,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":99,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Terraced Home","no_bedrooms":3,"tenure":"Market for rent","gia":99}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":125,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":6.3,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":1,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"wgs84_polygon":{"coordinates":[[[-0.362258,51.463383],[-0.362249,51.463326],[-0.362328,51.463318],[-0.362381,51.463313],[-0.362384,51.463324],[-0.362386,51.463336],[-0.362414,51.463461],[-0.362418,51.46348],[-0.362429,51.46353],[-0.362429,51.463532],[-0.362433,51.463556],[-0.362337,51.463565],[-0.362296,51.463569],[-0.362291,51.463544],[-0.362275,51.463473],[-0.36226,51.463397],[-0.362258,51.463383]]],"type":"Polygon"},"id":"Hounslow-P_2025_3481","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}