{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["Condition : 1 - The development hereby permitted shall be completed within 3 years from 28/01/2025.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.\r\n","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [1500_001, 1500_010, 1500-013, 1500_014, 1500_020, 1500_021, 1500_040, 1500_041 and Cover letter dated 24th January 2025, Received: 31/01/2025; Internal Daylight Assessment 6155.1 February, 2025, Permitted Development Noise Impact Assessment (Ground Floor) 1701037-RP-NIA-0004 and Transport Statement January 2025, Received: 05/02/2025; 100.P.02, Received: 18/03/2025; 241153-FS02, 241153-FS03, 241153-FS04, Fire Safety Strategy Rev A March 2025 and Letter from Eoghain Ryan dated 19th March 2025, Received: 19/03/2025. 300.P.06, 312.P.02, 318.P.02, FS 02, FS 06A, FS 06B, FS 09A, FS 09B, Cover letter dated on 26 November 2025, Internal Daylight Assessment, Fire Safety Strategy and Accommodation Schedule. Received: 27/11/2025].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.\r\n","Condition : 3 - The hereby approved dwellinghouse is to remain in use as a dwellinghouse within the meaning of Class C3 of Schedule 1 to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the use as a dwellinghouse.\r\nReason: To accord with the provisions of paragraph MA.2 (6) of Class MA, Part 3, Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).\r\n","Condition : 4 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: \r\n(a) a site plan (showing the elements set out below);\r\n(b) confirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c) provision for the parking of vehicles of site operatives and visitors;\r\n(d) provisions for loading, unloading and storage of plant and materials within the site;\r\n(e) details of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f) details of vehicle routeing from the site to the wider strategic road network;\r\n(g) the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h) provision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i) a scheme for recycling/disposing of waste resulting from demolition and construction works;\r\n(j) measures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k) commitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l) avoidance of peak hours for deliveries and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m) all necessary traffic orders and other permissions required to allow safe access to the site to be secured and implemented prior to commencement of construction;(n) details of the construction programme and a schedule of traffic movements;\r\n(o) the use of operat","Condition : 5 - Prior to occupation, a Car Parking Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The plan shall include details of the approved 5 residential parking spaces, including 1 accessible bays, and 1 bay to be implemented as active electric charging points. The development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the local planning authority is obtained to secure any variation.\r\nReason: In order to control the level and usage of parking on the site and to support sustainable transport objectives.\r\n","Condition : 6 - Prior to the occupation, full details (including manufacturers' specifications) of secure covered cycle parking facilities that accord with the West London Cycle Parking Guidance for 24 long-stay, including 2 enlarged spaces, 2 short-stay cycle parking spaces and 1 cargo bike space shall be submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be fully implemented and made available for use before the development is first occupied or brought into use, The approved facilities shall be thereafter retained for use at all times without obstruction.\r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 7 - Prior to occupation, full details of the Electric Vehicle Charging Points, each capable of a minimum output of 7.2kW, are submitted to and approved in writing by the Local Planning Authority. The details shall include manufacturer's specifications and the number of spaces provided with active and passive capabilities shall comply with the London Plan standards.\r\nThe charging points shall be installed in accordance with the approved details, with photographic evidence submitted to the Local Planning Authority upon completion, and so maintained at all times thereafter.\r\nReason: In order to promote sustainable modes of transport.\r\n","Condition : 8 - Before the development hereby permitted is first occupied or brought into use, a Delivery & Servicing Plan (including details of vehicle access and egress arrangements and times that servicing shall take place) shall be submitted to and approved in writing by the Local Planning Authority. The details shall accord with current guidance such as that issued by TfL and include measures required to ensure sufficient arrangements (physical as well as managerial) for the servicing, including refuse collection, of all aspects of the development, the timing of hours for deliveries by motor vehicles and a timetable for implementation. The development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the local planning authority is obtained to any variation.\r\n\r\nReason: In the interests of the safety of pedestrians and vehicles, to protect neighbours' living conditions and to support sustainable transport objectives.\r\n","Condition : 9 - Before the development hereby permitted is first occupied or brought into use, a finalised Travel Plan in accordance with current Council and TfL guidance comprising immediate, continuing and long-term measures to promote and encourage a reduction in car use shall be submitted to and approved in writing by the Local Planning Authority. The approved Travel Plan shall be implemented upon occupation, and thereafter monitored and reviewed in accordance with the agreed Travel Plan targets and timescales to the satisfaction of the Local Planning Authority.\r\nReason: In order to support sustainable transport objectives, including a reduction in single occupancy car journeys and the increased use of public transport, walking and cycling.\r\n","Condition : 10 - Prior to the occupation, full details of the 1 blue badge parking bays have been submitted to and approved in writing by the Local Planning Authority. The details shall include manufacturer's specifications.\r\nThe bays shall be installed in accordance with the approved details and so maintained at all times thereafter.\r\nReason: In order to promote sustainable modes of transport.\r\n","Condition : 11 - Prior to the first occupation of the hereby approved development a detailed plan shall be submitted to and approved in writing by the Local Planning Authority showing an area where future step free access over the railway line can be accommodated to the south east corner of the site. The subject area thereafter shall be kept clear of any built development unless otherwise agreed in writing.\r\nReason: In the interest of securing future safe and inclusive access.\r\n","Condition : 12 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.\r\n","Condition : 13 - Land quality � Preliminary Risk Assessment (Phase 1 desk study)\r\nPrior to commencement of the development hereby approved:\r\nNo development shall take place until a preliminary non-intrusive risk assessment (Phase I desk study report) to identify possible areas and sources of land contamination which may exist on the site has been submitted to and approved in writing by the local planning authority.  It will establish what intrusive investigation or site remediation measures may be necessary before the development commences. This report will be prepared by a suitably qualified, experienced or supervised person.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes: \r\n(i)\tThe Phase I desk study report will include the aims and objectives, data collection, site reconnaissance (walk over survey) and development of the initial Conceptual Site Model (CSM) with preliminary risk assessment whereby risk of all potential pollutant linkages are evaluated with a risk category. \r\n(ii)\tThe report must adhere to current UK guidance and best practice.\r\n(iii)\tThe report shall also make recommendations for the further gathering of information and/or intrusive investigation, to ensure that it will be possible to render the site safe for its proposed use.\r\n(iv)\tThe Council requests that the risk assessment reports or site plans are sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 14 - Land quality - intrusive site investigation\r\nPrior to commencement of the development hereby approved:\r\nFollowing the completion of the Phase I desk study report, if intrusive investigations or gas monitoring is recommended, a Phase II site investigation must be undertaken.\r\nNo development other than necessary works to enable intrusive investigations shall take place until a Phase II site investigation report, prepared by a suitably qualified, experienced or supervised person, has been submitted to and approved in writing by the local planning authority.\r\nThis report shall identify the areas and sources of land contamination that exist on the site and identify the scope of site remediation measures necessary before the development commences.\r\nThe investigation shall be carried out by a competent person(s), based on the initial Conceptual Site Model (CSM) and on-site observations, to identify the extent and nature of contaminants. The initial CSM shall be updated accordingly following a tiered risk assessment based on the findings of the investigation, and where applicable, the report shall include proposals to deal with the identified contamination on site.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe report shall include details of such sampling of soil, soil vapour, ground gas, leachate, surface water and/or groundwater at such locations and depths as are considered to characterise the site conditions based on the initial Conceptual Site Model (CSM) and on-site observations during investigation work. \r\n(ii)\tThe investigation and the report must adhere to current UK guidance and best practice.\r\n(iii)\tFurther investigation shall be carried out at such locations and at such depths as the local planning authority may stipulate if this report  is found to be i","Condition : 15 - Land quality � Remediation Method Statement/ Remediation Strategy\r\nPrior to commencement of the development hereby approved:\r\nIf a scheme for remediation is recommended in the Phase II site investigation for the site, no development shall take place until a remediation method statement prepared by a suitably qualified, experienced or supervised person to specify the works necessary to render the site suitable for its proposed end use, has been submitted to and approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe remediation method statement shall provide suitable details of how the risks of each pollutant linkages, as identified in the updated Conceptual Site Model, will be mitigated.\r\n(ii)\tThe report shall account for any comments made by the local planning authority. \r\n(iii)\tRemediation work shall be carried out in accordance with the approved remediation method statement for verification and validation before the development is first brought into use.\r\n(iv)\tThe Council requests that remediation method statement or site plans be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 16 - Land quality � additional/unexpected contamination found during development\r\nDuring the development:\r\nThe Local Planning Authority shall be notified immediately if any land contamination not previously identified is encountered during development. A competent person shall assess the contamination, where necessary, including soil and groundwater sampling and testing before any further part of the development that may be affected by the additional contamination that has been discovered continues.\r\nA revised remediation method statement, prepared by a suitably qualified, experienced or supervised person, shall be submitted in writing to the local planning authority for approval within one month of the discovery of such contamination.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tFurther remediation work to remove or manage additional contamination shall be carried out in accordance with the approved revised remediation method statement for verification and validation before the development is first brought into use. \r\n(ii)\tIn some instances, the local planning authority may require work on site to be ceased whilst the nature of additional contamination is investigated fully.\r\n(iii)\tThe Council requests that the revised remediation method statement or any site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 17 - Land quality - verification and validation of remedial work\r\nPrior to the development is first brought into use:\r\nThe agreed scheme for remediation, including any amendments, shall be fully implemented. A verification report produced upon completion of the remediation by a suitably qualified, experienced or supervised person shall be submitted in writing to the local planning authority for approval, before the development is first brought into use or in accordance with a programme approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tThe verification (closure) report shall revisit the conceptual site model and provide evidence that each aspect of the remediation plan has been implemented correctly and successfully in accordance with current UK guidance and best practice. Where applicable, the report shall describe how any additional/unexpected contamination encountered during development has been managed in line with the revised remediation method statement. \r\n(ii)\tThis report shall demonstrate that the development is suitable for its proposed use in terms of land quality.\r\n(iii)\tThe Council requests that the verification report or site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 18 - Separation of commercial premises at first-floor level and noise sensitive premises at ground-floor level.\r\nPrior to commencement of the development, details shall be submitted to and approved in writing by the Council, of the sound insulation of the floor/ceiling/walls separating the commercial part(s) of the premises at first-floor level from dwellings at ground-floor level. Details shall demonstrate that the sound insulation value DnT,w is enhanced by at least 5dB above the Building Regulations value and, where necessary, additional mitigation measures are implemented to contain commercial noise within the commercial premises and to achieve the criteria of BS8233:2014 within the dwellings/noise sensitive premises. Approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.\r\nReason: To ensure that the amenity of occupiers of the dwellings/noise sensitive premises at ground-floor level are not adversely affected by noise.\r\n","Condition : 19 - Separation of commercial premises at thirteenth and eleventh-floor level and noise sensitive premises at twelfth-floor level.\r\nPrior to commencement of the development, details shall be submitted to and approved in writing by the Council, of the sound insulation of the floor/ceiling/walls separating the commercial part(s) of the premises at eleventh and thirteenth-floor levels from dwellings/amenity space at twelfth-floor level. Details shall demonstrate that the sound insulation value DnT,w is enhanced by at least 5dB above the Building Regulations value and, where necessary, additional mitigation measures are implemented to contain commercial noise within the commercial premises and to achieve the criteria of BS8233:2014 within the dwellings/amenity space. Approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.\r\nReason: To ensure that the amenity of occupiers of the dwellings/amenity space/noise sensitive premises at twelfth-floor level are not adversely affected by noise.\r\n","Condition : 20 - Separation of commercial premises at seventeenth-floor level and noise sensitive premises at eighteenth-floor level.\r\nPrior to commencement of the development, details shall be submitted to and approved in writing by the Council, of the sound insulation of the floor/ceiling/walls separating the commercial part(s) of the premises at seventeenth-floor level from amenity space/noise sensitive premises at eighteenth-floor level. Details shall demonstrate that the sound insulation value DnT,w is enhanced by at least 5dB above the Building Regulations value and, where necessary, additional mitigation measures are implemented to contain commercial noise within the commercial premises and to achieve the criteria of BS8233:2014 within the amenity space/noise sensitive premises. Approved details shall be implemented prior to occupation of the development and thereafter be permanently retained.\r\nReason: To ensure that the amenity of occupiers of the amenity space/noise sensitive premises at eighteenth-floor level are not adversely affected by noise.\r\n","Condition : 21 - The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved.\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again. This shall be repeated until the assessment has reached the required standard. Once achieved, the plant shall be maintained permanently thereafter to con"],"actual_commencement_date":null,"pp_id":"14476623","decision_target_date":"23/06/2026","valid_date":"27/11/2025","lpa_app_no":"P/2025/3563","locality":"Brentford","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"Great West Road","last_synced":"2026-06-13T01:52:03.452Z","site_number":"993","centroid_easting":517214.0,"polygon":{"geometries":[{"coordinates":[[[517238.3692779015,177912.12716720667],[517238.86891396006,177911.87721328426],[517239.9691279299,177911.27727083932],[517240.61925859575,177910.97737853596],[517241.269154164,177910.6274135441],[517243.76900810853,177909.72704324807],[517244.8687751921,177909.32736097852],[517246.0188150289,177908.97667916855],[517247.21930034773,177908.5770923422],[517248.4188565014,177908.12741703505],[517249.36904799065,177907.67756049565],[517250.26922781806,177907.22766462533],[517251.1689376412,177906.67762337168],[517252.0691068376,177906.07752550306],[517252.91902933014,177905.42731548968],[517253.6689283225,177904.77702653065],[517254.1687791014,177904.27674225654],[517254.61928673007,177903.777546491],[517255.1191268081,177903.12705999473],[517255.5191526618,177902.52767921187],[517255.8189562958,177902.02723686164],[517256.0692073109,177901.4766981882],[517257.818881878,177898.6776321213],[517258.3689524871,177897.8369346012],[517260.2189096828,177895.0268284048],[517262.86895371927,177891.0769314207],[517287.5192801768,177855.42730367137],[517306.9695086103,177827.77775166574],[517308.92311867117,177825.02345688845],[517310.2692784746,177823.12744664683],[517312.8189545398,177819.5268458182],[517321.41947631276,177807.37736282544],[517299.96913406946,177795.32741890848],[517283.71902551636,177785.9775317278],[517281.51921200735,177784.6773830357],[517280.3695395031,177784.07678598346],[517279.26938436343,177783.37719548366],[517273.56929748284,177779.87687949702],[517259.5695132042,177770.6267637295],[517231.96932902036,177797.57697032817],[517215.15295797505,177814.21478891754],[517208.41917359555,177820.8777757434],[517179.5472835407,177849.0806998085],[517176.10719264334,177852.44057043362],[517165.31936700153,177862.97672804928],[517147.72914063843,177880.1176512345],[517147.7191905691,177880.12743568508],[517176.9688344067,177899.10759465754],[517193.8693319523,177910.1276804855],[517208.3192122365,177919.57712946046],[517209.11923830636,177920.12737959647],[517209.9187932594,177920.57748430944],[517210.8690773767,177921.02772249654],[517211.768878744,177921.37777618255],[517213.5189041358,177921.72738343338],[517215.3191523878,177921.82669855386],[517215.6192224531,177921.82693354774],[517216.6690344673,177921.87670093775],[517217.71904430236,177921.8274510047],[517219.0689144825,177921.7272516947],[517220.31874949863,177921.47677198367],[517221.4689945404,177921.17726936442],[517222.56875733315,177920.77758222417],[517223.5192050977,177920.37668155966],[517224.46939205495,177919.92682031664],[517225.4193555775,177919.5770888084],[517226.319295834,177919.07711588027],[517227.269247981,177918.57718239198],[517228.16895329807,177918.0271370196],[517229.01911766536,177917.57719805586],[517229.86904690054,177917.0771864646],[517230.61895283667,177916.57709638216],[517231.4188706583,177916.07704573538],[517232.36928286013,177915.52705643012],[517233.41902451677,177914.97713000048],[517235.21937887446,177914.0773327152],[517235.9690619739,177913.6773729864],[517236.61919209466,177913.377480164],[517237.8191824431,177912.5773409015],[517238.3692779015,177912.12716720667]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Brentford West","centroid_northing":177860.0,"application_type":"All Other","uprn":"100023408266","lapsed_date":"12/06/2029","actual_completion_date":null,"decision":"Approved","site_name":"Great West House","borough":"Hounslow","last_date_consultation_comments":"24/12/2025","application_type_full":"Removal/Variation of a condition","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3563","decision_date":"12/06/2026","bo_system":"Northgate M3","development_type":"Major dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Variation of condition 2 (approved plans) to allow changes to the internal layout of ground, 12th and 18th floors, and changes to the unit mix of PAC/2025/0304 approved 16/04/2025 for the prior approval for change of use of the ground, 12th and 18th floors of Great West House from offices (Class E) to residential accommodation (Class C3).","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-06-12T13:30:11.711Z","centroid":{"lon":-0.313194,"lat":51.487551},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{},"wgs84_polygon":{"coordinates":[[[-0.312826,51.488015],[-0.312819,51.488012],[-0.312803,51.488007],[-0.312794,51.488004],[-0.312785,51.488001],[-0.312749,51.487992],[-0.312733,51.487988],[-0.312717,51.487985],[-0.3127,51.487981],[-0.312683,51.487977],[-0.312669,51.487972],[-0.312656,51.487968],[-0.312643,51.487963],[-0.312631,51.487958],[-0.312619,51.487951],[-0.312608,51.487945],[-0.312601,51.487941],[-0.312595,51.487936],[-0.312588,51.48793],[-0.312582,51.487925],[-0.312578,51.48792],[-0.312575,51.487915],[-0.31255,51.48789],[-0.312543,51.487882],[-0.312517,51.487857],[-0.31248,51.48782],[-0.312137,51.487495],[-0.311866,51.487242],[-0.311839,51.487217],[-0.31182,51.4872],[-0.311785,51.487167],[-0.311665,51.487056],[-0.311978,51.486952],[-0.312215,51.486872],[-0.312247,51.48686],[-0.312264,51.486855],[-0.31228,51.486849],[-0.312363,51.486819],[-0.312568,51.486739],[-0.312956,51.486987],[-0.313193,51.48714],[-0.313287,51.487201],[-0.313694,51.48746],[-0.313742,51.487491],[-0.313894,51.487588],[-0.314141,51.487746],[-0.314142,51.487746],[-0.313714,51.48791],[-0.313467,51.488006],[-0.313256,51.488088],[-0.313244,51.488093],[-0.313233,51.488097],[-0.313219,51.4881],[-0.313206,51.488103],[-0.31318,51.488106],[-0.313155,51.488107],[-0.31315,51.488107],[-0.313135,51.488107],[-0.31312,51.488106],[-0.313101,51.488105],[-0.313083,51.488102],[-0.313066,51.4881],[-0.313051,51.488096],[-0.313037,51.488092],[-0.313023,51.488088],[-0.31301,51.488084],[-0.312997,51.48808],[-0.312984,51.488075],[-0.312971,51.48807],[-0.312959,51.488066],[-0.312947,51.488061],[-0.312936,51.488056],[-0.312925,51.488052],[-0.312911,51.488047],[-0.312896,51.488041],[-0.312871,51.488033],[-0.31286,51.488029],[-0.312851,51.488026],[-0.312834,51.488019],[-0.312826,51.488015]]],"type":"Polygon"},"id":"Hounslow-P_2025_3563","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}