{"postcode":"TW3 1HL","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["Condition : 1 - Three-year time limit\r\nThe development hereby permitted shall begin not later than three years from the date of planning permission P/2024/1842 dated 01/04/2025.\r\nReason: To prevent the accumulation of unimplemented planning permissions and to comply with Section 91 of the Town and Country Planning Act 1990 (as amended) and to meet the requirements of Section 51 of the Planning and Compulsory Purchase Act 2004 and to meet the requirements of The Town and Country Planning (Development Management Procedure) (England) Order 2015.\r\n","Condition : 2 - In accordance with approved drawings\r\nThe development hereby permitted, comprising 18 residential units shall be carried out in accordance with the following approved plans and specifications: \r\nDocuments received 18/02/2026:\r\nHCL-HSH-DR-RF-0220 Rev P13 (Roof Plan Proposed); Energy Strategy Rev F.\r\nDocuments received 03/12/2025:\r\nHCL-HSH-DR-ZZ-0170 Rev P03 (Window of Rear Building Proposed); HCL-HSH-DR-00-0210 Rev P11 (Ground Floor Plan Proposed); HCL-HSH-DR-04-0215 Rev P01 (Fifth Floor Plan Proposed); HCL-HSH-DR-ZZ-0232 Rev P03 (M4(3) and M4(2) Units Second to Fifth Floor); HCL-HSH-DR-ZZ-0234 Rev P03 (M4(2) Adaptable Units First to Fifth Floor - Proposed); HCL-HSH-DR-ZZ-0250 Rev P04 (Ground Floor Cycle Store Proposed); HCL-HSH-DR-ZZ-0310 Rev P12 (Front Elevation Proposed); HCL-HSH-DR-ZZ-0311 Rev P05 (Rear Elevation Proposed); HCL-HSH-DR-ZZ-0312-P03 (South Elevation - Courtyard Proposed); HCL-HSH-DR-ZZ-0314 Rev P02 (West Elevation Proposed); HCL-HSH-DR-ZZ-0320 Rev P12 (Front Elevation Proposed); HCL-HSH-DR-ZZ-0322 Rev P02 (West Elevation Context Proposed); HCL-HSH-DR-ZZ-0340 Rev P05 (Section A-A Proposed); HCL-HSH-DR-ZZ-0341 Rev P05 (Section B-B Proposed); HCL-HSH-DR-ZZ-0405 Rev P06 (Overall Areas Proposed); HCL-HSH-DR-ZZ-0410 Rev P05 (Residential Unit Summary Proposed); HCL-HSH-DR-ZZ-0411 Rev P06 (Space Standards Proposed); HCL-HSH-DR-ZZ-0425 Rev P02 (Access Routes Proposed); HCL-HSH-DR-ZZ-0426 Rev P02 (Dual Aspect Ventilation Proposed); HCL-HSH-ZZ-DR-0495 Rev P02 (View from Smithy Lane).\r\nDocument Received 10/10/2024:\r\nHCL-HSH-DR-ZZ-0420 Rev P01 (UGF Plans).\r\nDocument Received 04/10/2024:\r\nHCL-HSH-DR-ZZ-0313_P03 (Proposed North Elevation � Courtyard).\r\nDocuments received 29/07/2024: \r\nFlood Risk Assessment & Surface Water Drainage Strategy.\r\nDocuments received 04/06/2024:\r\nHCL-HSH-DR-00-0106 Rev P02 (Existing Ground Floor Plan Topographical); HCL-HSH-DR-SW-0100 Rev P04 (Existing Site Location Plan); HCL-HSH-DR03-0213 Rev P10 (Proposed Third Floor Plan); HSH- HCL-H","Condition : 3 - Advert consent � protect\r\nAny structure or hoarding erected and used principally for the purpose of displaying advertisements shall be maintained in a condition that does not endanger the public.\r\nReason: In order to comply with Regulation 2 of the Town and Country Planning (Control of Advertisement) (England) Regulations 2007.\r\n","Condition : 4 - Air Quality � NRMM\r\nAll Non-road Mobile Machinery (NRMM) used during the course of the development that is within the scope of the GLA 'Control of Dust and Emissions during Construction and Demolition' Supplementary Planning Guidance (SPG) dated July 2014, or any successor document, shall comply with the emissions requirements therein.\r\nReason: In the interests of Air Quality and to satisfy the requirements of policy EQ4 of the adopted Local Plan (2015) and London Plan policy SI1 (2021).\r\n","Condition : 5 - Hours of Construction and HGV deliveries during construction\r\nNo demolition or construction work shall take place on the site except between the hours of 8:00 am to 6:00 pm on Mondays to Fridays and 8:00 am to 1:00 pm on Saturdays and none shall take place on Sundays and Public Holidays without the prior agreement of the Local Planning Authority. Additionally, HGV deliveries to the site during the course of construction will be restricted to 9.30 am and 3.00 pm on Mondays to Fridays, and 9.30 am to 1.00 pm on Saturdays, and none shall take place on Sundays and Public Holidays without the prior agreement of the Local Planning Authority.\r\nReason: To ensure that the proposed development does not prejudice the amenities of the locality and to prevent obstruction and inconvenience to users of the public highway.\r\n","Condition : 6 - PD restriction (commercial)\r\nThe ground floor premises shall be used for Use Class (E) and no other purpose (including any other purpose in Class E) of the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), nor in any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification.\r\nReason: The Council is satisfied that the use hereby permitted would not result in detriment to adjoining properties but would wish to control future changes of use within the same Use Class to protect nearby land uses and the character of the area.\r\n","Condition : 7 - PD restriction general other\r\nNo cables, wires, aerials, pipework (except any rainwater downpipes as may be shown on the approved drawings), meter boxes or flues shall be fixed to any elevation facing a highway.\r\nReason: In order to protect the appearance of the area and neighbours' living conditions.\r\n","Condition : 8 - Lifts\r\nThe lifts as shown on floor plans shall be made available for use before the first occupation of the building hereby permitted and shall be retained thereafter for use at all times without obstruction.\r\nThey shall be constructed, installed and maintained in accordance with the principles set out in the Greater London Authority London Plan Guidance Sheet Policy D5(B5) or any document that supersedes this specification.\r\nReason: In order to ensure that the development complies with inclusive design principles.\r\n","Condition : 9 - Noise and pollution � mechanical services noise control\r\na)\tThe cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved.\r\nb)\tThe plant shall be isolated on adequate proprietary anti- vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.\r\nc)\tFollowing installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again. This shall be repeated until the assessment has reached the required standard. Once achieved","Condition : 10 - Construction Logistics Plan\r\nNo development shall take place, including any works of demolition, until a Construction Logistics Plan that conforms to current TfL and CLOCS guidance has been submitted to, and approved in writing by, the local planning authority. The approved Plan shall be adhered to throughout the construction period. The Plan shall include:\r\ni.\ta site plan (showing the areas set out below);\r\nii.\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\niii.\tprovision for the parking of vehicles of site operatives and visitors;\r\niv.\tprovisions for loading, unloading and storage of plant and materials within the site;\r\nv.\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\nvi.\tdetails of vehicle routeing from the site to the wider strategic road network;\r\nvii.\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate ;\r\nviii.\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\nix.\ta scheme for recycling/disposing of waste resulting from demolition and construction works;\r\nx.\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\nxi.\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\nxii.\tcommitment for all deliveries to take place between 09:30- 15:00 (outside peak hours) and details of a booking system to avoid vehicles waiting on the public highway;\r\nxiii.\tall necessary traffic orders and other permissions required to allow safe access","Condition : 11 - Demolition Management Plan\r\nPrior to the commencement of the development, including any demolition works and site preparation, a Demolition Management Plan shall be submitted to, and approved in writing by, the local planning authority. The approved Plan shall be adhered to throughout the demolition period. The Plan shall include:\r\n�\tSite plan showing the position of the various elements required to support the demolition (welfare facilities, site hut/office);\r\n�\tConfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n�\tDetails of the parking for site operatives and visitors (to be indicated on the site plan);\r\n�\tLoading and storage areas for the excavated materials;\r\n�\tProposed washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the council;\r\n�\tMeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access; Commitment to avoid attendance to the site by large vehicles (HGV) associated with the proposed works.\r\nReason. To ensure highway safety is maintained and preserved and in the interests of air quality and neighbour amenity in accordance with policies EQ2, EQ4 and EC2 of the Local Plan (2015), coupled with the requirements of the NPPF (2023).\r\n","Condition : 12 - Land quality � Preliminary Risk Assessment (Phase 1 desk study)\r\nPrior to commencement of the development hereby approved:\r\nNo development shall take place until a preliminary non- intrusive risk assessment (Phase I desk study report) to identify possible areas and sources of land contamination which may exist on the site has been submitted to and approved in writing by the local planning authority. It will establish what intrusive investigation or site remediation measures may be necessary before the development commences. This report will be prepared by a suitably qualified, experienced or supervised person.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tThe Phase I desk study report will include the aims and objectives, data collection, site reconnaissance (walk over survey) and development of the initial Conceptual Site Model (CSM) with preliminary risk assessment whereby risk of all potential pollutant linkages are evaluated with a risk category.\r\n(ii)\tThe report must adhere to current UK guidance and best practice.\r\n(iii)\tThe report shall also make recommendations for the further gathering of information and/or intrusive investigation, to ensure that it will be possible to render the site safe for its proposed use.\r\n(iv)\tThe Council requests that the risk assessment reports or site plans are sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.\r\n","Condition : 13 - Land quality - intrusive site investigation\r\nPrior to commencement of the development hereby approved: Following the completion of the Phase I desk study report, if intrusive investigations or gas monitoring is recommended, a Phase II site investigation must be undertaken.\r\nNo development other than necessary works to enable intrusive investigations shall take place until a Phase II site investigation report, prepared by a suitably qualified, experienced or supervised person, has been submitted to and approved in writing by the local planning authority.\r\nThis report shall identify the areas and sources of land contamination that exist on the site and identify the scope of site remediation measures necessary before the development commences.\r\nThe investigation shall be carried out by a competent person(s), based on the initial Conceptual Site Model (CSM) and on-site observations, to identify the extent and nature of contaminants. The initial CSM shall be updated accordingly following a tiered risk assessment based on the findings of the investigation, and where applicable, the report shall include proposals to deal with the identified contamination on site.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\n","Condition : 14 - Land quality � Remediation Method Statement/Remediation Strategy Prior to commencement of the development hereby approved:\r\nIf a scheme for remediation is recommended in the Phase II site investigation for the site, no development shall take place until a remediation method statement prepared by a suitably qualified, experienced or supervised person to specify the works necessary to render the site suitable for its proposed end use, has been submitted to and approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\n","Condition : 15 - Land quality � additional/unexpected contamination found during development\r\nDuring the development:\r\nThe Local Planning Authority shall be notified immediately if any land contamination not previously identified is encountered during development. A competent person shall assess the contamination, where necessary, including soil and groundwater sampling and testing before any further part of the development that may be affected by the additional contamination that has been discovered continues.\r\nA revised remediation method statement, prepared by a suitably qualified, experienced or supervised person, shall be submitted in writing to the local planning authority for approval within one month of the discovery of such contamination.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\n","Condition : 16 - Land quality - verification and validation of remedial work\r\nPrior to the development is first brought into use: The agreed scheme for remediation, including any amendments, shall be fully implemented. A verification report produced upon completion of the remediation by a suitably qualified, experienced or supervised person shall be submitted in writing to the local planning authority for approval, before the development is first brought into use or in accordance with a programme approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\n","Condition : 17 - Land quality - long term monitoring and maintenance\r\nIf long term monitoring and maintenance is required following successful completion of approved remedial measures, reports which demonstrate the effectiveness of the monitoring and maintenance shall be prepared by a suitably qualified, experienced or supervised person and submitted to the local planning authority according to an agreed timescale as shall first have been approved under other conditions set out in this planning approval decision notice.\r\nThis shall be conducted in accordance with current UK guidance and best practice.\r\nReason: In order to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, properties and ecological systems.\r\n","Condition : 18 - Details/samples of materials\r\nPrior to the commencement of the development (excluding demolition and site preparation) samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority.\r\n�\tdetails of material used all elevations, \r\n�\twindow and door treatment (including sections/reveals, quoin detail, screens); \r\n�\tentrance doors and external door frames\r\n�\tBalcony details (including soffits, panels and frame)\r\n�\tAll privacy measures (including obscure glazing details privacy screens etc.)\r\n�\tany other materials/details to be used, (extract vents, rainwater goods and etc.) with sections and on-site samples where appropriate\r\nThe development shall be carried out in accordance with the approved details and maintained as such thereafter.\r\nReason: In order that the Council may be satisfied as to the details of the development in the interests of the visual amenity of the area and protect living conditions, to satisfy the requirements of policies CC1 and CC2 of the adopted Local Plan.\r\n","Condition : 19 - Drainage (Suds)\r\nPrior to commencement of groundworks (excluding site investigations and demolition), the applicant must submit a final detailed drainage design including drawings and supporting calculations and updated Drainage Assessment Form to the Lead Local Flood Authority for review and approval, aligned with the Flood Risk Assessment & Surface Water Drainage Strategy (29/07/2024) and associated drawings. A detailed management plan confirming routine maintenance tasks for all drainage components must also be submitted to demonstrate how the drainage system is to be maintained for the lifetime of the development.\r\nReason: To prevent the risk of flooding to and from the site in accordance with relevant policy requirements including but not limited to London Plan Policy SI 13, its associated Sustainable Design and Construction SPG, the non- Statutory Technical Standards for Sustainable Drainage Systems and Hounslow Council's Local Plan Policy EQ3.\r\n","Condition : 20 - Evidence of sustainable drainage scheme \r\nNo building hereby permitted shall be occupied until evidence (photographs and installation contracts) is submitted to demonstrate that the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: To comply with the Non-Statutory Technical Standards for Sustainable Drainage Systems, the National Planning Policy Framework (Paragraph 103), the London Plan (Policies SI 12 and SI 13) along with associated guidance to these policies and Hounslow Council's Local Plan Policy EQ3.\r\n","Condition : 21 - Waste and recycling\r\nNo development (except any demolition, site clearance, ground investigation and remediation work) shall take place until full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development shall not be carried out otherwise than in accordance with the approved details.\r\nReason: In order to ensure adequate provision for waste and recycling in accordance with Local Plan policies Policy EQ7.\r\n","Condition : 22 - Air Quality\r\nPrior to the commencement of any construction or demolition works at the proposed site, a detailed air quality assessment shall be submitted to and approved in writing by the Local Planning Authority detailing the maximum HGV movements associated with the construction phase of the development. Surrounding sensitive receptors along the expected route are to be included within the assessment.\r\nReason: In order to ensure that the future users of the development will not be exposed to a significant increase in poor air quality, in accordance with Local Plan policies EC2 and EQ4 and London Plan policy SI1.\r\n","Condition : 23 - Details of Air Source Heat Pumps (ASHP)\r\nBefore commencement of any development (excluding demolition and site investigations), full details of the proposed heat pumps shall be submitted to and approved in writing by the Local Planning Authority. These shall include:\r\n�\tAn estimate of the heating and/or cooling energy (MWh/annum) of the Heat Pumps would provide to the development and the percentage of contribution to the site's heat loads to demonstrate how the heat fraction from heat pump technologies has been maximised.\r\n�\tDetails of the Seasonal Coefficient of Performance (SCOP) and/or Seasonal Energy Efficiency ratio (SEER) and how these have been calculated including the expected heat source and heat distribution temperatures (for space heat and hot water) and the distribution loss factor, which shall be calculated based on the above information.\r\nThe development shall be carried out in accordance with the approved details.\r\nReason: To achieve appropriate sustainability standards in accordance with Local Plan (2015) policies EQ1, EQ2 and EC3 and London Plan (2021) policies SI2 and T8, coupled with the requirements of the NPPF (2023).\r\n","Condition : 24 - Details of photovoltaic panels (PVs)\r\nPrior to the commencement of above ground works, details of the specifications (regarding power), number, appearance, location, orientation, total area and predicted carbon savings from the photovoltaic panels shall be submitted to and approved by the Local Planning Authority to show how the renewable energy carbon savings are to be achieved and maximized. The photovoltaic panels shall be installed in accordance with the approved details prior to the occupation of the relevant part of the development and retained and maintained as such unless otherwise agreed by the local planning authority.\r\nReason: To achieve appropriate sustainability standards in accordance with Local Plan (2015) policies EQ1, EQ2 and EC3 and London Plan (2021) policies SI2 and T8, coupled with the requirements of the NPPF (2023). The details are required prior to commencement of the above ground works to ensure the necessary mitigation is incorporated into the construction.\r\n","Condition : 25 - Landscaping\r\nNotwithstanding the details on the approved plans, prior to above ground works of the hereby approved development, details of hard and soft landscaping, including planting, hard and soft surfaces, raised border, landscape furniture, lighting and details of play space provision, including a choice of equipment to engage children of various ages and abilities, proposed green wall and long term management details shall be submitted to and approved in writing by the Local Planning Authority and retained as such thereafter.\r\nAny trees or plants or landscape features that, within 5 years of planting, die, are cut down, uprooted, destroyed or become (in the opinion of the Local Planning Authority) seriously damaged or defective, shall be replaced with another tree or plant of the same size and species within the first planting season following its death, removal, uprooting or destruction, unless the Local Planning Authority gives its prior written approval to any variation.\r\nReason: To ensure a satisfactory appearance of the site and the adjacent the area and to enhance green infrastructure and biodiversity in accordance with policies CC1, CC2, GB4 and GB7 of the Local Plan (2015) and policies D4, D5, G1, G5, G6 and G7 of the London Plan (2021) coupled with the requirements of the NPPF (2023).\r\n","Condition : 26 - Heat Network Safeguarding\r\nPrior to the commencement of development, evidence should be submitted to the Local Planning Authority and approved in writing to show that the development has made sufficient provisions to enable the connection to a feasible district heating network in the future including a safeguarded pipe route for future connection at the site boundary. The approved building shall be constructed and completed in accordance with the agreed details\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions in accordance with the London Borough of Hounslow Local Plan Policy EQ1 and London Plan policy SI2.\r\n","Condition : 27 - Cycle parking\r\nPrior to occupation and notwithstanding the submitted details, full details (including the number, location, design of structure and manufacturer's specifications) of all cycle stands for the occupants of, and visitors to, the development shall be submitted to and approved in writing by the Local Planning Authority.\r\nThe approved facilities, including associated facilities such as showers and changing rooms, shall be fully implemented and made available for use before any part of the development is first occupied and thereafter retained for use at all times without obstruction.\r\nReason: To support sustainable transport objectives; in accordance with policy EC2 of the Local Plan (adopted 2015) and policy T5 of the London Plan (adopted 2021) coupled with the requirements of the NPPF (2023).\r\n","Condition : 28 - Energy Strategy\r\na)\tThe hereby approved development must be carried out in accordance with the approved Energy Statement.\r\nb)\tPrior to first occupation of any building within the development hereby approved evidence (e.g. photographs, installation contracts and to include As- Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequently approved revisions, and achieved a 100% reduction in emissions.\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions in accordance with London Plan Policy SI2 and the LP Policy EQ1.\r\n","Condition : 29 - Energy and sustainability �� internal water consumption\r\nPrior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.\r\n","Condition : 30 - Sustainable sourcing of materials\r\nThe development shall not be occupied until evidence (e.g. photographs and copies of delivery notes, invoices or installation contracts) has been submitted to the Local Planning Authority to demonstrate that the development meets the following:\r\n�\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n�\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n�\tNo construction or insulation materials are to be used which will release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\nReason: In order to ensure the sustainable sourcing of materials in accordance with the London Plan policy SI2 and adopted Local Plan policy EQ2.\r\n","Condition : 31 - Servicing And Delivery\r\nBefore the development hereby permitted is first occupied or brought into use, a Delivery & Servicing Plan (including details of vehicle access and egress arrangements and times that servicing shall take place) shall be submitted to and approved in writing by the Local Planning Authority. The details shall accord with current guidance such as that issued by TfL and include measures required to ensure sufficient arrangements (physical as well as managerial) for the servicing, including refuse collection, of all aspects of the development, the timing of hours for deliveries by motor vehicles and a timetable for implementation. The development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the local planning authority is obtained to any variation.\r\nReason: In the interests of the safety of pedestrians and vehicles, to protect neighbours' living conditions and to support sustainable transport objectives, in accordance with Local Plan (2015) policies CC1 and EC2 coupled with the requirements of the NPPF (2023).\r\n","Condition : 32 - Thames Water � Pilling\r\nNo piling shall take place until a PILING METHOD STATEMENT (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works) and piling layout plan including all Thames Water wastewater assets, the local topography and clearance between the face of the pile to the face of a pipe has been submitted to and approved in writing by the local planning authority in consultation with Thames Water.\r\nAny piling must be undertaken in accordance with the terms of the approved piling method statement and piling layout plan.\r\nReason: The proposed works will be in close proximity to underground sewerage utility infrastructure. Piling has the potential to significantly impact / cause failure of local underground sewerage utility infrastructure.\r\nPlease read our guide 'working near our assets' to ensure your workings will be in line with the necessary processes you need to follow if you're considering working above or near our pipes or other structures. Should you require further information please contact Thames Water. Email: developer.services@thameswater.co.uk Phone: 0800 009 3921 (Monday to Friday, 8am to 5pm) Write to: Thames Water Developer Services, Clearwater Court, Vastern Road, Reading, Berkshire RG1 8DB\r\n","Condition : 33 - Green roof\r\nPrior to occupation of any above ground works, full details of the proposed green roofs shall have been submitted to the Local Planning Authority for approval in writing, including planting schedules and maintenance and management arrangements. Details shall include:\r\n(i)\tConstruction drawings to include a plan, and cross sections;\r\n(ii)\tNative wildflower seed mix (turf or sedum blanket will not be accepted);\r\n(iii)\tSubstrate between 80mm-150mm in depth; undulating and contain different materials/sizes (sand, gravel, crushed ceramic, brick, recycled, inert materials);\r\n(iv)\tSmall piles of untreated logs;\r\n(v)\tNo irrigation;\r\n(vi)\tConfirmation that the green roof construction will be supervised by a suitable qualified landscape/ecology contractor\r\nThe approved details shall be implemented and retained permanently thereafter.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.\r\n","Condition : 34 - Secured by Design\r\nThe development shall achieve 'Secured by Design' accreditation awarded by the Design-Out Crime Officer from the Metropolitan Police Service on behalf of the Association of Chief Police Officers (ACPO).\r\nPrior to first occupation accreditation will be evidenced as achieved and evidence of such accreditation will need to be submitted and approved in writing to the Local Planning Authority.\r\nReason: In pursuance of the Council's duty under section 17 of the Crime and Disorder Act 1998\r\n","Condition : 35 - Historic environment �archaeological investigation\r\nNo demolition or development shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, including the agreed programme and methodology of site evaluation and the competent person(s) or organisation nominated to undertake the agreed works.\r\nIf heritage assets of archaeological interest are identified by stage 1, then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no demolition/development shall take place other than in accordance with the agreed stage 2 WSI, which shall include:\r\n(a)\tThe statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works;\r\n(b)\tWhere appropriate, details of a programme for delivering related positive public benefits\r\n(c)\tThe programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI.\r\nReason: Reason: In order to safeguard the special architectural and historic interest of the area.\r\n","Condition : 36 - Cycle Carbon\r\nBefore occupation of the development, the post-construction tab of the Greater London Authority's (GLA) Whole Life-Cycle Carbon Assessment template shall be completed in line with the GLA's Whole Life-Cycle Carbon Assessment Guidance published at the time of submission. The post-construction assessment shall be submitted to the GLA for approval at: ZeroCarbonPlanning@london.gov.uk, along with any supporting evidence as per the guidance. Confirmation of submission to the GLA shall be submitted to the local planning authority simultaneously together with a copy of the documents submitted.\r\nReason: In the interests of sustainable development and to maximise on-site carbon dioxide saving\r\n"],"actual_commencement_date":null,"pp_id":"14378942","decision_target_date":"30/10/2026","valid_date":"03/03/2026","lpa_app_no":"P/2025/3619","locality":"Hounslow","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"High Street","last_synced":"2026-11-04T02:51:23.611Z","site_number":"188","centroid_easting":513854.0,"polygon":{"geometries":[{"coordinates":[[[513843.0195643063,175730.97709050885],[513840.5691700128,175738.47678446834],[513839.2189471973,175742.4263272878],[513838.7291432932,175743.91403394152],[513843.65325796255,175745.77316070785],[513849.9733966221,175748.16084661335],[513851.7232241458,175743.52598720498],[513854.8195473581,175735.32646227072],[513863.06933659,175712.8263636002],[513857.2191569809,175710.67614432826],[513851.0689084998,175708.42687505024],[513847.5691067871,175717.8267651947],[513847.1692627699,175718.92707611737],[513847.0689151082,175719.12621080055],[513846.8193218132,175720.1264113275],[513843.0195643063,175730.97709050885]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Hounslow Central","centroid_northing":175718.0,"application_type":"All Other","uprn":"10091691450","lapsed_date":"22/10/2029","actual_completion_date":null,"decision":"Approved","site_name":"188-188a","borough":"Hounslow","last_date_consultation_comments":"10/07/2026","application_type_full":"Removal/Variation of a condition","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3619","decision_date":"22/10/2026","bo_system":"Northgate M3","development_type":"Major dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Variation of Condition 2 (approved plans) for the erection of an additional storey to the rear block, to allow the creation of two additional self-contained flats, following planning permission P/2024/1842, approved on 01/04/2025, for the Demolition of existing building and redevelopment to provide a new mixed-use development comprising a commercial unit at ground floor and residential units across the upper floors, with associated amenity spaces, refuse and cycle storage.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-11-03T16:30:32.612Z","centroid":{"lon":-0.362255,"lat":51.468985},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{},"wgs84_polygon":{"coordinates":[[[-0.362409,51.469104],[-0.362442,51.469172],[-0.36246,51.469208],[-0.362467,51.469221],[-0.362395,51.469237],[-0.362303,51.469257],[-0.36228,51.469215],[-0.362238,51.469141],[-0.362126,51.468937],[-0.362211,51.468919],[-0.3623,51.4689],[-0.362348,51.468985],[-0.362353,51.468995],[-0.362355,51.468997],[-0.362358,51.469006],[-0.362409,51.469104]]],"type":"Polygon"},"id":"Hounslow-P_2025_3619","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}