{"postcode":"TW3 4BT","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":false,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: Site Layout Plan (06) Rev A (received 26.03.2026) and 01, 02, 03, 04, 05, 07 and Proposed Rear Elevation (06) (received 22.12.2025). \r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe [samples/details] shall include: \r\n(a)\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond;\r\n(b)\tCladding materials / render (including specifications where relevant);\r\n(c)\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies;\r\n(d)\tWindow types; and sectional drawings of reveals / sills / head details \r\n(e)\tBalcony details (including soffits, panels and frame);\r\n(f)\tAll privacy measures (including obscure glazing details, privacy screens etc.);\r\n(g)\tBalustrading treatment to balconies and roof areas (including details / sections / materials); and handrails\r\n(h)\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate\r\n(i)\tBalustrading treatment (including details / sections / materials); and\r\n(j)\tAny other materials / details / fittings to be used (including solar panels, extract vents, boiler flues etc.), with sections and on-site samples where appropriate\r\nThe development shall then be carried out in accordance with the approved details and maintained as such.\r\nReason.  In order to protect the appearance of the area thereafter.\r\n","Condition : 4 - No additional windows or openings shall be formed in the side elevations of the development hereby permitted.\r\nReason: In order to protect neighbours' privacy.\r\n","Condition : 5 - No cables, wires, aerials, pipework (except any rainwater downpipes as may be shown on the approved drawings), meter boxes or flues shall be fixed to any elevation facing a highway. \r\nReason: In order to protect the appearance of the area and neighbours' living conditions.\r\n\r\n","Condition : 6 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:  \r\na)\ta statement setting out the design objectives and how these will be delivered;  \r\nb)\texisting and proposed finished levels or contours;  \r\nc)\tmeans of enclosure/boundary treatment(s) and retaining structures; \r\nd)\tvehicle parking layouts;  \r\ne)\tother vehicle and pedestrian access and circulation areas; \r\nf)\thard surfacing materials;  \r\ng)\tminor artefacts and structures (e.g. furniture, play equipment, refuse or other storage units, signs, lighting, CCTV etc.);  \r\nh)\tproposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc. indicating alignments, levels, access points, supports as relevant);  \r\ni)\trenewable energy installations, including the Air Source Heat Pumps referenced in the submitted Energy Statement; and\r\nj)\tplanting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate.\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\n\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 7 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 8 - No dwellinghouse shall be occupied until space has been laid out within the site in accordance with approved plan no. 06 Rev A (received 26.03.2026) for 2 bicycles to be parked and that space shall thereafter be kept available for the parking of bicycles; prior to commencement of the use.\r\nReason: In order to support sustainable transport objectives.","Condition : 9 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 10 - No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development shall not be carried out otherwise than in accordance with the approved details.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 11 - Before the dwelling(s) hereby approved are first occupied, the developer shall provide to each dwelling a set of containers required at the time of development for household use for the storage and collection of recyclable materials for the purposes of the Council's kerbside recycling service, to the specification then in use by the local authority's recycling collection service and shall notify the Council's refuse and recycling services when the development is first occupied.  The waste and recyclable materials containers shall be stored in a proprietary refuse bin enclosure designed for the purpose to be supplied by the developer and located adjacent to each dwelling. Each dwelling with a private garden shall also be supplied with a garden waste composting bin of at least 220 litres capacity at the same time.\r\nReason: In order to protect the quality of the local environment and neighbours' living conditions and to endure appropriate means of refuse storage are provided.","Condition : 12 - (a) No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until a finalised Energy Strategy (demonstrating how the targets for carbon dioxide emissions reduction are to be met in line with the Mayor's energy hierarchy) has been submitted to and approved in writing by the local planning authority.\r\n(b) The development shall be implemented in accordance with the approved Energy Strategy and shall not commence above ground until full Design Stage calculations under the [Standard Assessment Procedure/National Calculation Method] have been submitted to and approved in writing by the local planning authority to show that the development will be constructed in accordance with the approved Energy Strategy, or any subsequent approved revisions.\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 13 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 14 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 15 - (i) The dwelling hereby permitted shall be constructed as a self-build dwelling within the definition of a self-build and custom build housing in the Self-build and Custom Housebuilding Act 2015\r\n(ii) The first occupation of the dwelling hereby permitted shall be by a person or persons who had a primary input into the design and layout of the [unit/dwelling] and who will live in the dwelling for at least 3 years\r\n(iii)Prior to the first occupation of the dwelling the Council shall be notified of the person(s) who will take up first occupation of the dwelling.\r\n\r\nReason: To comply with The Biodiversity Gain Requirements (Exemptions) Regulations 2024. \r\n","Condition : 16 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted to the local planning authority for approval in writing a final detailed drainage design; including drawings, supporting calculations and demonstration that the design is compliant with the national Non-Statutory Technical Standards for SuDS, NPPF, London Plan and Hounslow Local Plan Policy.\r\nA detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted and approved which demonstrates how the drainage system is to be maintained for the lifetime of the development. The development shall be carried out in strict compliance with the approved details.\r\n\r\nReason: In order to prevent the risk of flooding to and from the site.","Condition : 17 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the local planning authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: In order to ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed."],"actual_commencement_date":null,"pp_id":"14585096","decision_target_date":"27/04/2026","valid_date":"12/01/2026","lpa_app_no":"P/2025/3801","locality":"Hounslow","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"Gresham Road","last_synced":"2026-06-28T02:31:18.932Z","site_number":5,"centroid_easting":514368,"polygon":{"geometries":[{"coordinates":[[[514380.76,176624.61],[514378.1,176630.05],[514376.95,176632.35],[514376.65,176633],[514362,176628.15],[514346.7,176623.3],[514349.7,176617.5],[514351.1,176614.65],[514355.8,176605.2],[514358.7,176599.55],[514365.85,176602.2],[514370.8,176604.05],[514373.6,176605.1],[514387.65,176610.45],[514384.699,176616.53],[514383.5,176619],[514380.76,176624.61]]],"type":"Polygon"}],"type":"GeometryCollection"},"ward":"Heston East","centroid_northing":176614,"application_type":"All Other","uprn":100021548971,"lapsed_date":"26/04/2029","actual_completion_date":null,"decision":"Approved","site_name":null,"borough":"Hounslow","last_date_consultation_comments":"05/02/2026","application_type_full":"Full planning permission","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3801","decision_date":"27/04/2026","bo_system":"Northgate M3","development_type":"Minor dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"demolition of existing bungalow and proposed development to construct a new build detached 5 bedroom property ","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-06-27T21:52:33.443Z","centroid":{"lon":-0.354569,"lat":51.476935},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"demolition of bungalow","intended_completion_date":"03/2026","intended_commencement_date":"02/2026"}],"total_gia_gained":200,"site_area":0.03,"total_gia_existing":150,"total_gia_lost":150,"existing_proposed_floorspace_details":[{"gia_existing":150,"gia_gained":200,"use_class":"C3","gia_lost":150}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":10,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":200,"total_gia_existing":150,"total_gia_lost":150},"garden_land_lost":false,"internal_resi_water_usage":110,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":20,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"urban_greening_factor_score":0},"ownership_status":"Private","occupation_status":"Occupied"},"wgs84_polygon":{"coordinates":[[[-0.354382,51.477027],[-0.354418,51.477077],[-0.354434,51.477098],[-0.354438,51.477104],[-0.354651,51.477063],[-0.354872,51.477023],[-0.354831,51.47697],[-0.354812,51.476944],[-0.354747,51.476858],[-0.354707,51.476807],[-0.354604,51.476829],[-0.354532,51.476845],[-0.354491,51.476854],[-0.354287,51.476899],[-0.354328,51.476954],[-0.354344,51.476976],[-0.354382,51.477027]]],"type":"Polygon"},"id":"Hounslow-P_2025_3801","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Planning Portal ingest"}