{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":"Office, workshop and two existing sheds","appeal_start_date":null,"cil_liability":true,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: 03/24-1.0.2 Rev F, 03-24/1.1.1 Rev D, 03-24/1.2.1 Rev E, 03-24/1.2.2 Rev D, 553402mh14Aug25_FV01_PEA, Flood Risk Assessment Received 30 January 2026\r\n03-24/1.0.4 Rev B, 03-24/1.1.2 Rev N, 03-24/2.1.4 Rev B, 03-24/2.1.5 Rev B, 03-24/2.1.6 Rev B Received 10 March 2026\r\n03-24/2.1.7 Rev C, 03-24/2.1.2 Rev L Received 13 March 2026\r\n03-24/1.0.1 Rev H Received 01 June 2026\r\nUnnumbered Location Plan Received 05 June 2026\r\n\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - Notwithstanding any information given in the documents hereby approved, the materials to be used in the construction of the external surfaces of the development hereby permitted shall be be grey galvanised corrugated metal for the external walls and galvanised steel sheeting and powder coated steel for the roof. \r\nReason: In order to safeguard the appearance of the area.\r\n","Condition : 4 - The extensions hereby permitted shall be built in line with flood management measures as shown in the submitted and hereby approved Flood Risk Assessment.\r\nReason: In order to protect the occupiers from flooding.","Condition : 5 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 6 - All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases of the development hereby approved shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance (SPG) 'Control of Dust and Emissions During Construction and Demolition' dated July 2014, or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/.\r\nReason: In the interests of air quality and to protect neighbours' living conditions and the wider local environment.","Condition : 7 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 8 - No development shall take place until an Ecological Management Plan has been submitted to and approved in writing by the local planning authority.\r\nThe Ecological Management Plan shall incorporate:\r\n(i)\tdetails of measures to protect breeding birds, nests and eggs from mortality/damage, injury and disturbance, including avoidance by timing and/or appropriate supervision;\r\n(ii)\tdetails of the ecological clerk of works supervision to be put in place to monitor the clearance of vegetation to ensure no impact on undiscovered or other unexpected faunal encounters;\r\n(iii)\tan ecological lighting plan;\r\n(iv)\tdetails of how the enhancement measures will be monitored, managed and maintained, including the long- term design objectives, management responsibilities and maintenance schedules;\r\n(v)\tadditional detail on location and type of bird/bat boxes, maintenance and a commitment that any data collected is to be shared with the Council;\r\n(vi)\tspecies surveys within and around the site to demonstrate ecological enhancements\r\nThe development shall then be carried out in accordance with the approved details.\r\nReason: In the interests of nature conservation.","Condition : 9 - No development shall take place, including any works of demolition, until an Ecological Management Plan has been submitted to, and approved in writing by, the local planning authority. The Plan shall include:\r\n\r\n(i)\tMeasures to prevent any runoff and pollution (from dust and debris) from harming nearby water way(s) during construction; nationally recognised best practice construction methods for the purpose shall be specified to achieve this.\r\n(ii)\tAction that will be taken to ensure no operational phase impacts occur as a result of increased surface run off and or pollutants entering any nearby waterways.\r\n(iii)\tA commitment to undertake a precautionary check by suitably qualified ecologist for water voles and other rare aquatic life and suitable mitigation measures shall be specified as necessary to be put into effect if any physical works take place within five metres of the river corridor.\r\n(iv)\tDetails of lighting during construction \r\n(v)\tDetails of materials storage and waste management \r\n\r\nThe approved Plan shall be adhered to throughout the construction period.\r\nReason: In order to ensure the protection of wildlife and supporting habitat and secure opportunities for the enhancement of the nature conservation value of the site.","Condition : 10 - Prior to the commencement of the work, a watching brief for bats should be submitted to and approved in writing by the local planning authority, and the development shall subsequently be carried in accordance with the approved details.\r\nThe watching brief shall include:\r\n�\tDetails of pre-development check (no more than a week prior to works beginning).\r\n�\tDetails of the toolbox talk with anyone involved in the construction of the development in order to make them aware of the potential presence of bats and what to do in the event of finding any.\r\n�\tCareful working procedures- to be defined in the statement.\r\n�\tDetails of who will be watching the construction and what qualifications they hold.\r\n�\tA contingency plan of what to do in case of finding a bat roost.\r\nReason: To ensure the protection of the protected species that may be found on the site and in accordance with NPPF.\r\n","Condition : 11 - Land quality � Preliminary Risk Assessment (Phase 1 desk study)\r\nPrior to commencement of the development hereby approved:\r\nNo development shall take place until a preliminary non-intrusive risk assessment (Phase I desk study report) to identify possible areas and sources of land contamination which may exist on the site has been submitted to and approved in writing by the local planning authority.  It will establish what intrusive investigation or site remediation measures may be necessary before the development commences. This report will be prepared by a suitably qualified, experienced or supervised person.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes: \r\n(i)\tThe Phase I desk study report will include the aims and objectives, data collection, site reconnaissance (walk over survey) and development of the initial Conceptual Site Model (CSM) with preliminary risk assessment whereby risk of all potential pollutant linkages are evaluated with a risk category. \r\n(ii)\tThe report must adhere to current UK guidance and best practice.\r\n(iii)\tThe report shall also make recommendations for the further gathering of information and/or intrusive investigation, to ensure that it will be possible to render the site safe for its proposed use.\r\n(iv)\tThe Council requests that the risk assessment reports or site plans are sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 12 - Land quality - intrusive site investigation\r\nPrior to commencement of the development hereby approved:\r\nFollowing the completion of the Phase I desk study report, if intrusive investigations or gas monitoring is recommended, a Phase II site investigation must be undertaken.\r\nNo development other than necessary works to enable intrusive investigations shall take place until a Phase II site investigation report, prepared by a suitably qualified, experienced or supervised person, has been submitted to and approved in writing by the local planning authority.\r\nThis report shall identify the areas and sources of land contamination that exist on the site and identify the scope of site remediation measures necessary before the development commences.\r\nThe investigation shall be carried out by a competent person(s), based on the initial Conceptual Site Model (CSM) and on-site observations, to identify the extent and nature of contaminants. The initial CSM shall be updated accordingly following a tiered risk assessment based on the findings of the investigation, and where applicable, the report shall include proposals to deal with the identified contamination on site.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe report shall include details of such sampling of soil, soil vapour, ground gas, leachate, surface water and/or groundwater at such locations and depths as are considered to characterise the site conditions based on the initial Conceptual Site Model (CSM) and on-site observations during investigation work. \r\n(ii)\tThe investigation and the report must adhere to current UK guidance and best practice.\r\n(iii)\tFurther investigation shall be carried out at such locations and at such depths as the local planning authority may stipulate if this report  is found to be i","Condition : 13 - Land quality � Remediation Method Statement/ Remediation Strategy\r\nPrior to commencement of the development hereby approved:\r\nIf a scheme for remediation is recommended in the Phase II site investigation for the site, no development shall take place until a remediation method statement prepared by a suitably qualified, experienced or supervised person to specify the works necessary to render the site suitable for its proposed end use, has been submitted to and approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe remediation method statement shall provide suitable details of how the risks of each pollutant linkages, as identified in the updated Conceptual Site Model, will be mitigated.\r\n(ii)\tThe report shall account for any comments made by the local planning authority. \r\n(iii)\tRemediation work shall be carried out in accordance with the approved remediation method statement for verification and validation before the development is first brought into use.\r\n(iv)\tThe Council requests that remediation method statement or site plans be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 14 - Land quality � additional/unexpected contamination found during development\r\nDuring the development:\r\nThe Local Planning Authority shall be notified immediately if any land contamination not previously identified is encountered during development. A competent person shall assess the contamination, where necessary, including soil and groundwater sampling and testing before any further part of the development that may be affected by the additional contamination that has been discovered continues.\r\nA revised remediation method statement, prepared by a suitably qualified, experienced or supervised person, shall be submitted in writing to the local planning authority for approval within one month of the discovery of such contamination.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tFurther remediation work to remove or manage additional contamination shall be carried out in accordance with the approved revised remediation method statement for verification and validation before the development is first brought into use. \r\n(ii)\tIn some instances, the local planning authority may require work on site to be ceased whilst the nature of additional contamination is investigated fully.\r\n(iii)\tThe Council requests that the revised remediation method statement or any site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 15 - Land quality - verification and validation of remedial work\r\nPrior to the development is first brought into use:\r\nThe agreed scheme for remediation, including any amendments, shall be fully implemented. A verification report produced upon completion of the remediation by a suitably qualified, experienced or supervised person shall be submitted in writing to the local planning authority for approval, before the development is first brought into use or in accordance with a programme approved in writing by the local planning authority.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tThe verification (closure) report shall revisit the conceptual site model and provide evidence that each aspect of the remediation plan has been implemented correctly and successfully in accordance with current UK guidance and best practice. Where applicable, the report shall describe how any additional/unexpected contamination encountered during development has been managed in line with the revised remediation method statement. \r\n(ii)\tThis report shall demonstrate that the development is suitable for its proposed use in terms of land quality.\r\n(iii)\tThe Council requests that the verification report or site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.","Condition : 16 - Prior to the commencement of development, a Risk Assessment and Method Statement shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Canal and River Trust. The Risk Assessment and Method Statement shall specify the measures to be taken to ensure the protection of the structural stability, water quality and biodiversity of the waterway, as well as protection of its users, including moorers. The demolition, remediation and construction works shall thereafter be carried out in accordance with the approved details. \r\nReason: In the interests of the structural stability, water quality and biodiversity of the Grand Union Canal, in accordance with Policies SI16 & SI17 of the London Plan, 2021 and the advice and guidance on land stability contained in paragraphs 187, 196 & 197 of the National Planning Policy Framework and in the National Planning Practice Guidance.\r\n"],"actual_commencement_date":null,"pp_id":"13405752","decision_target_date":"26/06/2026","valid_date":"10/03/2026","lpa_app_no":"P/2025/3821","locality":"Brentford","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"Dock Road","last_synced":"2026-06-18T12:50:53.854Z","site_number":null,"centroid_easting":517813.0,"polygon":{"geometries":[{"coordinates":[[[517856.1691677952,177307.12783266313],[517856.32887392683,177305.69069817598],[517856.47370066727,177304.89630883775],[517856.5530833453,177303.95798986056],[517856.5527396373,177303.28262649133],[517856.4078939903,177302.72741717697],[517856.05125740904,177301.8680113848],[517855.62669514853,177301.39199655806],[517854.3519481735,177300.1897879591],[517853.41183355637,177299.47708863975],[517853.27322588884,177299.37263166148],[517852.2722647147,177298.73751917406],[517851.4470441125,177298.25334064633],[517849.89899973315,177297.48317449418],[517848.9310021569,177297.01460505486],[517847.5969881629,177296.451890408],[517845.86715257633,177295.79211557395],[517845.58085690066,177295.67533859535],[517844.25465944747,177295.13505804708],[517844.219169109,177295.22769576847],[517842.41763377836,177299.4962451178],[517838.4189609991,177308.9776954514],[517836.9886914894,177312.30355871312],[517834.5550850453,177315.63734797295],[517831.0186260267,177320.12720152986],[517829.81887193484,177321.32775142265],[517829.2688989901,177321.82793403685],[517828.7687133616,177322.2780890944],[517827.61877321557,177323.4274998849],[517826.96922635887,177324.02773801156],[517823.7687658173,177326.72739373636],[517824.96877560223,177328.27722477476],[517824.219191647,177329.02757536873],[517822.9691930011,177330.17800885157],[517820.71861942514,177332.32777198456],[517821.1641149649,177332.79981801473],[517821.81101426284,177333.484584531],[517822.7047307013,177334.4309651435],[517831.7687049993,177344.02789145225],[517834.82209580665,177348.6124438877],[517845.32488352654,177361.26455856004],[517849.8186266787,177366.67798588908],[517861.01925372443,177363.82757952492],[517867.3689903074,177353.07769298542],[517871.0689448858,177347.37779080519],[517867.7691176632,177345.87723292893],[517867.9191524587,177345.5780767976],[517864.8186949387,177344.2278898121],[517868.618914664,177336.77794376906],[517869.0686262515,177337.12770438817],[517873.9192388137,177327.42790739413],[517863.8191430921,177322.37752276397],[517867.518633787,177315.37807650416],[517856.1691677952,177307.12783266313]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Syon & Brentford Lock","centroid_northing":177325.0,"application_type":"All Other","uprn":"10093259935","lapsed_date":"08/06/2029","actual_completion_date":null,"decision":"Approved","site_name":"Mso Marine","borough":"Hounslow","last_date_consultation_comments":"27/02/2026","application_type_full":"Full planning permission","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2025/3821","decision_date":"09/06/2026","bo_system":"Northgate M3","development_type":"Minor all other minor developments","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Demolition of the existing side extension and shed and erection of a two storey side extension, first floor front extension, and replacement shed with two air source heat pumps","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-06-18T08:30:14.734Z","centroid":{"lon":-0.304749,"lat":51.482619},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"04/2027","intended_completion_date":"12/2027"}],"total_gia_gained":167,"site_area":0.1976,"total_gia_existing":227,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":227,"use_class":"EG3","gia_gained":167,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"building_details":[{"no_storeys":3,"max_height":9,"building_ref":"Workshop"},{"no_storeys":1,"max_height":10,"building_ref":"Shed"}],"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":167,"total_gia_existing":227,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":75,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"ownership_status":"Private"},"wgs84_polygon":{"coordinates":[[[-0.304134,51.482449],[-0.304132,51.482436],[-0.30413,51.482429],[-0.304129,51.48242],[-0.30413,51.482414],[-0.304132,51.482409],[-0.304137,51.482402],[-0.304143,51.482398],[-0.304162,51.482387],[-0.304176,51.482381],[-0.304178,51.48238],[-0.304193,51.482374],[-0.304205,51.48237],[-0.304227,51.482364],[-0.304241,51.48236],[-0.304261,51.482355],[-0.304286,51.482349],[-0.30429,51.482348],[-0.304309,51.482344],[-0.30431,51.482345],[-0.304334,51.482383],[-0.304389,51.482469],[-0.304408,51.482499],[-0.304442,51.48253],[-0.304491,51.482571],[-0.304508,51.482582],[-0.304516,51.482587],[-0.304523,51.482591],[-0.304539,51.482601],[-0.304548,51.482607],[-0.304594,51.482632],[-0.304576,51.482646],[-0.304586,51.482652],[-0.304604,51.482663],[-0.304636,51.482683],[-0.304629,51.482687],[-0.30462,51.482693],[-0.304606,51.482701],[-0.304473,51.482786],[-0.304427,51.482826],[-0.304272,51.482938],[-0.304205,51.482985],[-0.304045,51.482958],[-0.303957,51.48286],[-0.303906,51.482808],[-0.303954,51.482795],[-0.303952,51.482792],[-0.303997,51.482781],[-0.303945,51.482713],[-0.303938,51.482716],[-0.303871,51.482628],[-0.304019,51.482584],[-0.303968,51.482521],[-0.304134,51.482449]]],"type":"Polygon"},"id":"Hounslow-P_2025_3821","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}