{"postcode":"TW4 7HT","status":"Approved","decision_agency":"Borough","subdivision_of_building":"Development proposals sited on existing service yard area between rear of existing single storey retail unit extensions and rear lane","appeal_start_date":null,"cil_liability":true,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.\r\n","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications:\r\nDrawings DP 110 (X) and DP 114 (L), received 03/07/2026. Drawings DP 310 (W), DP 320 (K) and DP 321 (J), received 15/06/2026. Drawings DP 100 (D), DP 111 (J), DP 300 (X), DP 301 (V), SP06 and SP07 and lift information sheet, received 18/05/2026. Drawings SP02, SP03, SP04 and SP05, received 02/04/2026. Drawings 16056_500(Rev.07) and 16056_501(Rev.07), untitled drainage calculations and revised completed Drainage Assessment Form, received 26/03/2026. Drawing DP 101 (B), Air Quality Assessment (dated 9th July 2025), Daylight and Sunlight Report (dated 14th November 2025), Management and Maintenance Plan for Sustainable Drainage (SuDS) (dated October 2022), Noise Assessment (dated 25th March 2025), Planning Statement (dated December 2025), Policy D12A Statement (dated 6th November 2025), Transport Statement (November 2025) and Travel Plan (November 2025), received 03/02/2026. Energy Statement (REV03, dated November 2025), received 13/01/2026.\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.\r\n","Condition : 3 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no further enlargement or alteration of the premises or erection of any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the buildings hereby permitted by means of internal horizontal division (e.g. new mezzanine levels) without prior written approval of the local planning authority. \r\nNo cables, wires, aerials, pipework (except any rainwater downpipes as may be shown on the approved drawings), meter boxes or flues shall be fixed to any elevation facing a highway.\r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site.\r\n","Condition : 4 - (a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\n(b) Prior to first occupation of any unit within the development hereby approved, evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a 100% reduction in emissions or greater.\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 5 - Prior to first occupation of the buildings hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.\r\n","Condition : 6 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe details shall include (as applicable): \r\n�\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond to show how the proposed materials would match those used in the existing building;\r\n�\tCladding materials / render (including specifications where relevant);\r\n�\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies;\r\n�\tWindow types; and sectional drawings of reveals / sills / head details;\r\n�\tBalcony details (including soffits, panels and frame);\r\n�\tAll privacy measures (including obscure glazing details, privacy screens etc.);\r\n�\tBalustrading treatment to balconies and roof areas (including details / sections / materials) and handrails;\r\n�\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate;\r\n�\tBalustrading treatment (including details / sections / materials); and\r\n�\tAny other materials / details / fittings to be used (including solar panels, extract vents, boiler flues etc.), with sections and on-site samples where appropriate.\r\nThe development shall then be carried out in accordance with the approved details and maintained as such thereafter.\r\nReason: In order to protect the appearance of the area.\r\n","Condition : 7 - (A) No development shall take place until details have been submitted to and approved by the local planning authority which demonstrate that:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n(B) The development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the local planning authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition. The development shall be maintained in accordance with the approved details at all times thereafter.\r\nReason: In the interests of sustainable development. \r\n","Condition : 8 - Prior to the occupation of the development, full details of the proposed heat pumps shall be submitted to and approved in writing by the Local Planning Authority. These shall include:\r\n(i)\tAn estimate of the heating and/or cooling energy (MWh/annum) the heat pumps would provide to the development and the percentage of contribution to the site's heat loads to demonstrate how the heat fraction from heat pump technologies has been maximised. \r\n(ii)\tDetails of the Seasonal Coefficient of Performance (SCOP) and/or Seasonal Energy Efficiency ratio (SEER) and how these have been calculated including the expected heat source and heat distribution temperatures (for space heat and hot water) and the distribution loss factor, which shall be calculated based on the above information.\r\nThe development shall be carried out in accordance with the approved details.\r\nReason: To achieve appropriate sustainability standards.\r\n","Condition : 9 - Prior to commencement of the development, details of the specifications (regarding power), number, appearance, location, orientation, total area and predicted carbon savings from the photovoltaic panels shall have been submitted to and approved by the Local Planning Authority to show how the renewable energy carbon savings are to be achieved and maximised. \r\nA glint and glare assessment shall also have been submitted to and approved in writing by the Local Planning Authority (in consultation with Heathrow Airport), demonstrating that any solar panels would not cause a distraction or danger to the Air Traffic Control Tower and pilots approaching Heathrow Airport.\r\nThe photovoltaic panels shall be installed in accordance with the approved details prior to the occupation of the relevant part of the development and retained and maintained as such unless otherwise agreed by the Local Planning Authority. \r\nReason: To achieve appropriate sustainability standards and to ensure the development does not endanger the safe movement of aircraft or the operation of Heathrow Airport.\t\t\r\n","Condition : 10 - Development shall not commence until a Bird Hazard Management Plan has been submitted to and approved in writing by the Local Planning Authority. The submitted plan shall include details of management of any flat/shallow pitched/green roofs on buildings within the site which may be attractive to nesting, roosting and \"loafing\" birds.\r\nThe Bird Hazard Management Plan shall be implemented as approved and shall remain in force for the life of the buildings. No subsequent alterations to the plan are to take place unless first submitted to and approved in writing by the Local Planning Authority.\r\nReason: It is necessary to manage the flat roofs and not to encourage the feeding of birds which could endanger the safe movement of aircraft and the operation of Heathrow Airport.\r\nSupporting Information \r\nThe Bird Hazard Management Plan must ensure that flat/shallow pitched roofs be constructed to allow access to all areas by foot using permanent fixed access stairs ladders or similar. The owner/occupier must not allow gulls, to nest, roost or loaf on the building. Checks must be made weekly or sooner if bird activity dictates, during the breeding season. Outside of the breeding season gull activity must be monitored and the roof checked regularly to ensure that gulls do not utilise the roof. Any gulls found nesting, roosting or loafing must be dispersed by the owner/occupier when detected or when requested by Heathrow Airside Operations staff. In some instances, it may be necessary to contact Heathrow Airside Operations staff before bird dispersal takes place. The owner/occupier must remove any nests or eggs found on the roof. The breeding season for gulls typically runs from March to June. The owner/occupier must obtain the appropriate licences where applicable from Natural England before the removal of nests and eggs.\r\n","Condition : 11 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted and had approved in writing by the local planning authority a final detailed drainage design including drawings and detailed supporting calculations and updated Drainage Assessment Form to the Lead Local Flood Authority for review and approval, aligned with the 'Management and Maintenance Plan for Sustainable Drainage' (Issue 5, dated 19/11/2025), Drainage Assessment Form and Cellular Storage (16056_r04) and associated drawings. A detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted to demonstrate how the drainage system is to be maintained for the lifetime of the development, and a maintenance owner shall be provided.\r\nReason: To prevent the risk of flooding to and from the site.\r\n","Condition : 12 - The development hereby permitted shall not be occupied until evidence (photographs and installation contracts) has been submitted and approved in writing to demonstrate that the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: To prevent the risk of flooding to and from the site.\r\n","Condition : 13 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:\r\n(i)\ta statement setting out the design objectives and how these will be delivered; \r\n(ii)\texisting and proposed finished levels or contours; \r\n(iii)\tmeans of enclosure/boundary treatment(s) and retaining structures;\r\n(iv)\tvehicle parking layouts and markings; \r\n(v)\tother vehicle and pedestrian access and circulation areas;\r\n(vi)\thard surfacing materials, in particular for the rear service road fronting the site which will need to be surfaced in permeable materials with suitable drainage properties to prevent runoff from discharging onto the public highway; \r\n(vii)\tminor artefacts and structures (e.g. furniture, refuse or other storage units, signs, lighting, CCTV etc.); \r\n(viii)\tany children's play equipment and surfacing within the shared landscaped area;\r\n(ix)\tproposed and existing functional services above and below ground (e.g. drainage, power, communications cables, pipelines etc. indicating alignments, levels, access points, supports as relevant); \r\n(x)\tany renewable energy installations (including air source heat pump screening where required);\r\n(xi)\tdetails of all external lighting, including measures to switch off when not required and details of mitigation measures to avoid lightspill onto sensitive receptors (habitable rooms and any ecologically sensitive parts of the site);\r\n(xii)\tdetails of tree planting, including quantity, size, species, and positions or density of all trees to be planted, alongside details of how they will be planted and protected and the proposed times of planting; \r\n(xiii)\tplanting plans, written specifications (including cultivation and other operations associated with plant and g","Condition : 14 - Prior to commencement of the development hereby approved:\r\nNo development shall take place until a preliminary non-intrusive risk assessment (Phase I desk study report) to identify possible areas and sources of land contamination which may exist on the site has been submitted to and approved in writing by the local planning authority.  It will establish what intrusive investigation or site remediation measures may be necessary before the development commences. This report will be prepared by a suitably qualified, experienced or supervised person.\r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes: \r\n(i)\tThe Phase I desk study report will include the aims and objectives, data collection, site reconnaissance (walk over survey) and development of the initial Conceptual Site Model (CSM) with preliminary risk assessment whereby risk of all potential pollutant linkages are evaluated with a risk category. \r\n(ii)\tThe report must adhere to current UK guidance and best practice.\r\n(iii)\tThe report shall also make recommendations for the further gathering of information and/or intrusive investigation, to ensure that it will be possible to render the site safe for its proposed use.\r\n(iv)\tThe Council requests that the risk assessment reports or site plans are sent electronically to landquality@hounslow.gov.uk as well as being submitted to the local planning authority for approval.  \r\n","Condition : 15 - Prior to commencement of the development hereby approved:\r\nFollowing the completion of the Phase I desk study report, if intrusive investigations or gas monitoring is recommended, a Phase II site investigation must be undertaken. \r\nNo development other than necessary works to enable intrusive investigations shall take place until a Phase II site investigation report, prepared by a suitably qualified, experienced or supervised person, has been submitted to and approved in writing by the local planning authority. \r\nThis report shall identify the areas and sources of land contamination that exist on the site and identify the scope of site remediation measures necessary before the development commences.\r\nThe investigation shall be carried out by a competent person(s), based on the initial Conceptual Site Model (CSM) and on-site observations, to identify the extent and nature of contaminants. The initial CSM shall be updated accordingly following a tiered risk assessment based on the findings of the investigation, and where applicable, the report shall include proposals to deal with the identified contamination on site. \r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe report shall include details of such sampling of soil, soil vapour, ground gas, leachate, surface water and/or groundwater at such locations and depths as are considered to characterise the site conditions based on the initial Conceptual Site Model (CSM) and on-site observations during investigation work. \r\n(ii)\tThe investigation and the report must adhere to current UK guidance and best practice.\r\n(iii)\tFurther investigation shall be carried out at such locations and at such depths as the local planning authority may stipulate if this report is found to be insufficient or where it is deemed necessary","Condition : 16 - Prior to commencement of the development hereby approved:\r\nIf a scheme for remediation is recommended in the Phase II site investigation for the site, no development shall take place until a remediation method statement prepared by a suitably qualified, experienced or supervised person to specify the works necessary to render the site suitable for its proposed end use, has been submitted to and approved in writing by the Local Planning Authority. \r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting Notes:\r\n(i)\tThe remediation method statement shall provide suitable details of how the risks of each pollutant linkages, as identified in the updated Conceptual Site Model, will be mitigated.\r\n(ii)\tThe report shall account for any comments made by the Local Planning Authority. \r\n(iii)\tRemediation work shall be carried out in accordance with the approved remediation method statement for verification and validation before the development is first brought into use.\r\n(iv)\tThe Council requests that remediation method statement or site plans be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the Local Planning Authority for approval.\r\n","Condition : 17 - During the development:\r\nThe Local Planning Authority shall be notified immediately if any land contamination not previously identified is encountered during development. A competent person shall assess the contamination, where necessary, including soil and groundwater sampling and testing before any further part of the development that may be affected by the additional contamination that has been discovered continues. \r\nA revised remediation method statement, prepared by a suitably qualified, experienced or supervised person, shall be submitted in writing to the Local Planning Authority for approval within one month of the discovery of such contamination. \r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tFurther remediation work to remove or manage additional contamination shall be carried out in accordance with the approved revised remediation method statement for verification and validation before the development is first brought into use. \r\n(ii)\tIn some instances, the Local Planning Authority may require work on site to be ceased whilst the nature of additional contamination is investigated fully.\r\n(iii)\tThe Council requests that the revised remediation method statement or any site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the Local Planning Authority for approval.\r\n","Condition : 18 - Before the development is first brought into use:\r\nThe agreed scheme for remediation, including any amendments, shall be fully implemented. A verification report produced upon completion of the remediation by a suitably qualified, experienced or supervised person shall be submitted in writing to the Local Planning Authority for approval, before the development is first brought into use or in accordance with a programme approved in writing by the Local Planning Authority. \r\nReason: Contamination is known or suspected on the site due to a former land use. It is therefore necessary to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\nSupporting notes:\r\n(i)\tThe verification (closure) report shall revisit the conceptual site model and provide evidence that each aspect of the remediation plan has been implemented correctly and successfully in accordance with current UK guidance and best practice. Where applicable, the report shall describe how any additional/unexpected contamination encountered during development has been managed in line with the revised remediation method statement. \r\n(ii)\tThis report shall demonstrate that the development is suitable for its proposed use in terms of land quality.\r\n(iii)\tThe Council requests that the verification report or site photos be sent electronically to landquality@hounslow.gov.uk as well as being submitted to the Local Planning Authority for approval.\r\n","Condition : 19 - If long term monitoring and maintenance is required following successful completion of approved remedial measures, reports which demonstrate the effectiveness of the monitoring and maintenance shall be prepared by a suitably qualified, experienced or supervised person and submitted to the Local Planning Authority according to an agreed timescale as shall first have been approved under other conditions set out in this planning approval decision notice. \r\nThis shall be conducted in accordance with current UK guidance and best practice. \r\nReason: In order to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, properties and ecological systems.\r\n","Condition : 20 - No development shall take place until a detailed finalised Construction Logistics Plan (CLP), drafted in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include:\r\n(i)\ta site plan (showing the elements set out below);\r\n(ii)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(iii)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(iv)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(v)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(vi)\tdetails of the proposed access road and pavements across the site, including at the junction with Staines Road; \r\n(vii)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(viii)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(ix)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(x)\ta scheme for recycling/disposing of waste resulting from demolition and construction works;\r\n(xi)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(xii)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(xiii)\tavoidance of peak hours for deliveries and details of a booking system to avoid vehicles waiting on the public highway;\r\n(xiv)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured ","Condition : 21 - No demolition or construction work shall take place on the site except between the hours of 8:00am to 6:00pm on Mondays to Friday and 8:00am to 1:00pm on Saturdays and none shall take place on Sundays and Public Holidays without the prior agreement of the Local Planning Authority. Additionally, HGV deliveries to site during the course of construction will be restricted to 9.30am and 3.00pm on Mondays to Friday, and 9.30am to 1.00pm on Saturdays, and none shall take place on Sundays and Public Holidays without the prior agreement of the Local Planning Authority.\r\nReason: To ensure that the proposed development does not prejudice the amenities of the locality and to prevent obstruction and inconvenience to users of the public highway.\r\n","Condition : 22 - Prior to the commencement of the development including any demolition works and site preparation, a detailed and finalised Construction Environment Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall provide details of how demolition and construction works are to be undertaken and include:\r\n(i)\tThe identification of stages of works;\r\n(ii)\tmeasures to mitigate against noise, dust, debris and harmful air pollution, and to avoid run-off and pollutants which could harm nearby waterways during construction;\r\n(iii)\tdetails of working hours, which unless otherwise agreed with the Local Planning Authority shall be limited to 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays);\r\n(iv)\tProcedures for maintaining good public relations including complaint management, public consultation and liaison;\r\n(v)\tMitigation measured as defined in BS 5228: Parts 1 and 2: 2009 Noise and Vibration Control on Construction and Open Sites shall be used to minimise noise disturbance from construction works;\r\n(vi)\tMeasures to control emissions during the construction phase in line with the requirements of the Mayor's Control of Dust and Emissions during Construction and Demolition SPG.\r\nThe approved CEMP shall be adhered to throughout the construction period of the development.\r\nReason: In order to safeguard the amenities of the locality.\r\n","Condition : 23 - Before the development hereby permitted is first occupied or brought into use, a detailed finalised Delivery and Servicing Plan (including details of vehicle access and egress arrangements and times that servicing shall take place) shall have been submitted to and approved in writing by the Local Planning Authority. The details shall accord with current guidance such as that issued by TfL and include measures required to ensure sufficient arrangements (physical as well as managerial) for the servicing, including refuse collection, of all aspects of the development, the timing of hours for deliveries by motor vehicles and a timetable for implementation. \r\nThe development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the Local Planning Authority is obtained to any variation.\r\nReason: In the interests of the safety of pedestrians and vehicles, to protect neighbours' living conditions and to support sustainable transport objectives.\r\n","Condition : 24 - No deliveries, refuse storage or collection, or vehicle parking shall take place in any location that would obstruct the public highway or footway, or interfere with the free flow of traffic. The rear servicing road shall not be used for the parking of cars or any other vehicles at any time.\r\nReason: To ensure the safe and efficient operation of the public highway and to safeguard highway and pedestrian safety.\r\n","Condition : 25 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives. \r\n","Condition : 26 - Prior to first use or occupation of the development, finalised details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed and demonstrating compliance with the Council's Recycling and Refuse Guidelines SPD) shall have been submitted to and approved in writing by the local planning authority. These details shall include further information about the design and management strategy for the proposed waste chute to show how it would be designed to prevent blockages/pile-ups and allow easy usage and servicing. The development shall not be carried out otherwise than in accordance with the approved details.\r\nAll refuse and recycling bins and delivery carts in association with the approved development are to be stored within the approved facilities at all times and only brought out when deliveries are being made or refuse collected.\r\nReason: In order to ensure adequate provision for waste and recycling and to prevent obstruction to access outside collection times.\r\n","Condition : 27 - Notwithstanding the details submitted and prior to first use or occupation of the development, full details (including manufacturers' specifications) of secure covered cycle parking facilities that accord with the West London Cycle Parking Guidance for the occupants of, and visitors to, the development shall be submitted to and approved in writing by the Local Planning Authority. These shall include details of a maintenance programme for the approved cycle lift and a strategy for providing alternative arrangements in the event that the lift breaks down or is out of operation. The approved facilities, including the cycle lift, shall be fully implemented and made available for use before the development is first occupied or brought into use, The approved facilities shall be thereafter retained for use at all times without obstruction.\r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 28 - Prior to commencement of the development hereby approved, the applicant shall have entered into a section 278 agreement with the Council on the basis of the following highway works:\r\n�\tResurfacing of the existing public footway along the eastern site frontage on Manor Avenue, \r\n�\tReplacement of grass verge with footway to the front of the main entrance doors of the proposed development (with the grass verge otherwise retained elsewhere).\r\n�\tResurfacing of the existing public carriageway and refreshing of road markings along the eastern site frontage on Manor Avenue.\r\n�\tResurfacing of the existing public footway to the north of the site access, together with any associated highway works, including possible stopping up, where necessary.\r\n�\tConstruction of an industrial crossover.\r\nThese works shall have been completed and made fully accessible before first occupation of any part of the development. \r\nReason: To improve the quality of the public highway immediately adjacent to the site, ensure safe access and enhance the character of the area.\r\n","Condition : 29 - (a)\tThe development shall achieve 'Secured by Design' accreditation awarded by the Design-Out Crime Officer from the Metropolitan Police Service on behalf of the Association of Chief Police Officers (ACPO).\r\n(b)\tPrior to first use, accreditation will be evidenced as achieved and evidence of such accreditation will need to be submitted and approved in writing by the Local Planning Authority.\r\nReason: To tackle crime and disorder and to ensure that the development provides a safe and secure environment.\r\n","Condition : 30 - The use of all ground floor service yards hereby approved shall remain strictly incidental to the Class E commercial businesses fronting Bath Road and shall not be used for any other purpose within the Schedule to the Town and Country Planning (Use Classes) Order 1987 (as amended), including any provision equivalent to that Class in any statutory instrument revoking and re-enacting that Order with or without modification.\r\nReason: The Council is satisfied that the use hereby permitted would not result in detriment to adjoining properties but would wish to control future changes of use within the same Use Class to safeguard the viability of the commercial parade and protect nearby land uses and the character of the area.\r\n","Condition : 31 - The development hereby approved shall be carried out in accordance with the mitigation measures proposed in the submitted 'Air Quality Assessment' (dated 9th July 2025) during construction and operational phases. All works which form part of the finished scheme, including any remedial measures, shall be completed before the development is first occupied and shall be retained in operation thereafter. \r\nReason: In order to ensure that the future users of the development or existing surrounding occupiers will not be exposed to harmful air quality.\r\n","Condition : 32 - The development hereby approved shall be carried out in accordance with the mitigation measures proposed in the submitted 'Noise Assessment' (dated 25th March 2025) during construction and operational phases. All works which form part of the finished scheme, including any remedial measures, shall be completed before the development is first occupied and shall be retained in operation thereafter. \r\nReason: To ensure that the amenity of occupiers of the development site is not adversely affected by noise from transport and other noise sources.\r\n","Condition : 33 - (a) No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until details have been submitted to and approved by the local planning authority of a scheme providing for the insulation of the proposed dwellings against the transmission of externally generated aircraft, road and rail noise (and vibration), taking account of any ventilation requirements necessary, in order to ensure that the maximum noise levels permitted within the dwellings will not exceed those that are specified in Table 4 of British Standard 8233:2014 [Living Rooms = 35 dB LAeq, 16 hours; Dining room/area = 40 dB LAeq, 16 hours; Bedroom = 35 dB LAeq, 16 hours during day-time (07:00 - 23:00) and Bedroom = 30 dB LAeq, 8 hours during night-time (23:00 - 07:00)], or any equivalent standards if replaced.\r\n(b) Before the development hereby permitted is first occupied or brought into use, post-completion noise tests shall be carried out by accredited/approved organisations with competence in environmental noise assessments for residential accommodation and test reports shall have been submitted to and approved in writing by the local planning authority. Noise tests shall be carried out taking account of worst-case environmental conditions, such as easterly operations at Heathrow, peak time traffic flows, wind speed and direction and presence of temperature inversion. Continuous logged data shall be submitted. \r\nReason: In order to secure acceptable living conditions for residents of the new dwellings. \r\n","Condition : 34 - All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases of the development hereby approved shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance (SPG) 'Control of Dust and Emissions During Construction and Demolition' dated July 2014, or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/. \r\nReason: In the interests of air quality and to protect neighbours' living conditions and the wider local environment. \r\n","Condition : 35 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation, and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operates. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance with the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved.\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter. \r\nc) Following installation of any mechanical services plant including heating, ventilation, and air conditioning (HVAC) to which the application refers, and prior to occupation of the development, a post-completion noise assessment shall be submitted to and approved in writing by the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again. This shall be repeated until the assessment has reached the required standard. Once ac","Condition : 36 - Prior to commencement of the development, details shall have been submitted to and approved in writing by the Council, of the sound insulation of the floor/ceiling/walls separating the ground floor commercial part(s) of the premises from dwellings above. Details shall demonstrate that the sound insulation value DnT,w is enhanced by at least 5dB above the Building Regulations value and, where necessary, additional mitigation measures are implemented to contain commercial noise within the commercial premises and to achieve the criteria of BS8233:2014 within the dwellings/noise sensitive premises. The approved details shall be implemented prior to occupation of the development and thereafter be permanently retained. \r\nReason: To ensure that the amenity of occupiers of the development site/ adjacent dwellings/ noise sensitive premises is not adversely affected by noise.   \r\n","Condition : 37 - Prior to first use, full details of any emergency generator(s) shall have been submitted to and approved in writing by the local authority to confirm that the sound emitted by standby or emergency generators during power outages or testing does not exceed the lowest daytime ambient noise level LAeq(15min) as measured or calculated according to BS4142:2014. For the purposes of testing, testing is permitted for up to 1 hour per month between 09.00 and 17.00 Monday to Friday only and not on public holidays.\r\nReason: To ensure that the proposed development does not prejudice the amenities of occupiers of neighbouring properties.\r\n","Condition : 38 - The ground floor secure delivery and servicing yards hereby approved shall not be used outside the hours of 08:00 � 19:00 Monday to Saturdays, or at any time on Sundays and Public Holidays.\r\nReason: In order to protect neighbours' living conditions. \r\n"],"actual_commencement_date":null,"pp_id":"14460643","decision_target_date":"20/07/2026","valid_date":"13/01/2026","lpa_app_no":"P/2026/0017","locality":"Hounslow","appeal_decision_date":null,"parking_details":{"no_existing_cycle":0,"no_proposed_cycle":16,"net_cycle":16},"decision_process":null,"street_name":"Bath Road","last_synced":"2026-07-21T02:09:19.172Z","site_number":null,"centroid_easting":511925.0,"polygon":{"geometries":[{"coordinates":[[[511965.407595,176165.196116],[511943.828321,176174.706641],[511934.942222,176178.312836],[511934.894557,176178.331814],[511922.100451,176183.851366],[511914.521622,176186.875545],[511907.721351,176189.725494],[511905.758622,176187.064451],[511905.471182,176186.675406],[511903.875243,176184.428518],[511900.481682,176181.966317],[511894.771665,176177.82549],[511894.371508,176177.47513199996],[511899.62234199996,176175.25752499996],[511905.082214,176172.949952],[511905.97147,176172.575656],[511919.671332,176166.974739],[511921.985098,176166.08884],[511922.021528,176166.075178],[511924.60571199993,176165.08842],[511927.521322,176163.975445],[511932.47125,176161.824683],[511935.221615,176160.6747],[511937.671123,176159.524776],[511938.921451,176159.034933],[511941.521435,176158.025167],[511943.37168,176157.174697],[511944.221371,176156.925258],[511950.121583,176154.37486500002],[511953.891123,176152.725516],[511955.02147999994,176152.225249],[511957.021523,176151.324676],[511959.320964,176150.431832],[511965.407595,176165.196116]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Hounslow West","centroid_northing":176176.0,"application_type":"All Other","uprn":"10095890739","lapsed_date":"13/07/2029","actual_completion_date":null,"decision":"Approved","site_name":"Land Rear Of 366 To 388","borough":"Hounslow","last_date_consultation_comments":"10/02/2026","application_type_full":"Full planning permission","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0017","decision_date":"14/07/2026","bo_system":"Northgate M3","development_type":"Minor dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Erection of a part single storey and part three storey building compromising of eight self-contained flats and secured retail delivery units with associated landscaping, communal facilities, terrace, service access, plant room, cycle and refuse storage following the demolition of the existing temporary structures.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-20T08:00:14.106Z","centroid":{"lon":-0.38987,"lat":51.473486},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development","intended_completion_date":"05/2027","intended_commencement_date":"05/2026"}],"total_gia_gained":696.05,"site_area":0.011127999999999999,"total_gia_existing":564.1,"total_gia_lost":78.23,"existing_proposed_floorspace_details":[{"gia_existing":271.63,"use_class":"EA","gia_gained":0,"gia_lost":22.6},{"gia_existing":292.47,"use_class":"EB","gia_gained":0,"gia_lost":55.63},{"gia_existing":0,"use_class":"C3","gia_gained":696.05,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"building_details":[{"no_storeys":3,"max_height":10.15,"building_ref":"8 duplex apartments above secure enclosed retail delivery areas"}],"green_suds":true,"surface_water_discharge_percentage_reduction":10,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":696.05,"total_gia_existing":564.1,"total_gia_lost":78.23},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":20,"total_no_proposed_residential_units":8,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":8,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":631.84,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":73.69},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":73.69},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":73.69},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":2,"tenure":"Market for rent","gia":73.69},{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for rent","gia":84.27},{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for rent","gia":84.27},{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for rent","gia":84.27},{"no_habitable_rooms":4,"provider":"Private","change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for rent","gia":84.27}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":120,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":532.68,"no_resi_units_to_have_full_fibre":8,"urban_greening_factor_score":0.43,"solar_pv_capacity":6.27,"no_new_water_connections_required":8,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":8,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true,"chp_heat_pumps_capacity":0.16},"ownership_status":"Private","lead_developer_company_name":"Gifto Properties Limited"},"wgs84_polygon":{"coordinates":[[[-0.389292,51.473381],[-0.389599,51.473471],[-0.389726,51.473505],[-0.389727,51.473505],[-0.389909,51.473557],[-0.390017,51.473586],[-0.390114,51.473613],[-0.390143,51.473589],[-0.390148,51.473586],[-0.390171,51.473566],[-0.390221,51.473545],[-0.390304,51.473508],[-0.39031,51.473505],[-0.390235,51.473484],[-0.390157,51.473463],[-0.390145,51.473459],[-0.389949,51.473406],[-0.389916,51.473398],[-0.389916,51.473397],[-0.389879,51.473388],[-0.389837,51.473377],[-0.389767,51.473357],[-0.389728,51.473346],[-0.389693,51.473335],[-0.389675,51.473331],[-0.389638,51.473321],[-0.389611,51.473313],[-0.389599,51.473311],[-0.389515,51.473287],[-0.389461,51.473271],[-0.389445,51.473266],[-0.389417,51.473258],[-0.389384,51.473249],[-0.389292,51.473381]]],"type":"Polygon"},"id":"Hounslow-P_2026_0017","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}