{"postcode":null,"status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["Condition : 1 - Time Limit\r\nThe development hereby permitted shall be begun before the expiration of three years from 05/08/2022. \r\n\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. ","Condition : 2 - In accordance with the approved plans  \r\n\r\nThe development hereby permit-ted shall be carried out in accordance with the following approved plans and specifications: \r\nReceived on 08/01/2026:\r\nCHAH-WAB-D1-00-DR-AR-101000 Rev P04 (Proposed Ground Floor Block D); CHAH-WAB-D1-01-DR-AR-101001 Rev P04 (Proposed First Floor Block D); CHAH-WAB-D1-02-DR-AR-101002 Rev P04 (Proposed Second-Fifth Floor Block D); CHAH-WAB-D1-RF-DR-AR-101010 Rev P04 (Proposed Roof Plan Block D); CHAH-WAB-D1-XX-DR-AR-102001 Rev P05 (Proposed Elevation North East Block D); CHAH-WAB-D1-XX-DR-AR-102002 Rev P05 (Proposed Elevation North West Block D); CHAH-WAB-D1-XX-DR-AR-102003 Rev P05 (Proposed Elevation South West Block D); CHAH-WAB-D1-XX-DR-AR-103001 Rev P03 (Proposed Section AA Block D); CHAH-WAB-D1-XX-DR-AR-103002 Rev P03 (Proposed Section BB Block D); CHAH-WAB-D1-XX-DR-AR-103003 Rev P03 (Proposed Section CC Block D); CHAH-WAB-D1-ZZ-DR-AR-104012 Rev P07 (Unit Types 1B2P-D-02 Block D); CHAH-WAB-D1-ZZ-DR-AR-104013 Rev P07 (Unit Types 1B2P-D-03 Block D); CHAH-WAB-D1-ZZ-DR-AR-104024 Rev P07 (Unit Types 2B4P-D-01 Block D); CHAH-WAB-D1-ZZ-DR-AR-104025 Rev P07 (Unit Types 2B4P-D-05 Block D); CHAH-WAB-D1-ZZ-DR-AR-104034 Rev P07 (Unit Types 3B5P Block D); CHAH-WAB-D1-01-DR-AR-104026 Rev P07 (Unit Types 2B3P WCA Block D); CHAH-WAB-D1-XX-DR-AR-102101 Rev P03 (Proposed North East Elevation Block D); CHAH-WAB-D1-XX-DR-AR-102102 Rev P03 (Proposed South West Elevation Block D); CHAH-WAB-D1-ZZ-DR-AR-106102 Rev P02 (Proposed Material Palette Block D); As ap-proved (Existing Site Location Plan); CHAH-WAB-ZZ-00-DR-AR-100102 Rev P03 (Proposed Site and Block Plan); CHAH-WAB-ZZ-00-DR-AR-100110 Rev P04 (Proposed Site Ground Floor Plan); CHAH-WAB-ZZ-01-DR-AR-100111 Rev P04 (Proposed Site First Floor Plan); CHAH-WAB-ZZ-02-DR-AR-100112 Rev P04 (Proposed Site Second Floor Plan); CHAH-WAB-ZZ-03-DR-AR-100113 Rev P04 (Proposed Site Third Floor Plan); CHAH-WAB-ZZ-04-DR-AR-100114 Rev P04 (Proposed Site Fourth Floor Plan); CHA","Condition : 3 - Construction Logistics Plan \r\n\r\nThe development shall be carried out in accordance with the details approved under application ref: P/2025/1510, approved on 04/07/2025.\r\n\r\nThe approved Plan shall be adhered to throughout the construction period.\r\n\r\nReason: To ensure highway safety is maintained and preserved.\r\n","Condition : 4 - Construction Environment Management Plan \r\n\r\nThe development shall be carried out in accordance with the details approved under application ref: P/2025/1510, approved on 04/07/2025.\r\n\r\nAll construction and demolition works shall be undertaken in accordance with the approved CEMP.\r\n\r\nReason: In order to safeguard the amenities of adjoining residents and the amenities of the locality.\r\n","Condition : 5 - Hours of work \r\n\r\nNo demolition or construction work shall take place on the site except between the hours of 8 am to 6 pm on Mondays to Fridays and 9 am to 1 pm on Saturdays and not at all on Sundays and Public Holidays without the prior written agreement of the Local Planning Authority.\r\n\r\nReason: In order to safeguard the amenities of adjoining residents and the amenities of the locality.\r\n","Condition : 6 - Construction noise limits \r\nBased upon guidance contained within BS 5228:2009 + A1:2014: Noise, Noise levels from construction works at nearby existing and proposed residential receptors shall not exceed the following construction noise criteria:\r\nDaytime works will not exceed 75 dB LAeq,T at the worst-affected residential property during the following time periods:\r\n�\tMonday to Friday (08:00 to 18:00 hours)\r\n�\tSaturday (08:00 to 13:00 hours)\r\nWorks outside of the standard hours will be subject to prior agreement, and prior notice will be provided to the London Borough of Hounslow.\r\nReason: In order to safeguard the amenities of adjoining residents and the amenities of the locality.\r\n","Condition : 7 - Samples of materials \r\nNo above ground works shall commence until details and samples of all facing materials are submitted to and approved in writing by the Local Planning Authority.\r\ni.\tThe samples and details shall include: brick/stonework (including brick/stone and mortar onsite sample panel min. 2m x 2m);\r\nii.\tcladding materials (including system specifications/details and on-site samples (where relevant);\r\niii.\twindow treatment (including sections/reveals and onsite sample); and privacy measures, (including obscure glazing details - including where separation distances between habitable room windows are less than 18m - privacy screens - etc.);\r\niv.\tbalustrading treatment (details/sections/materials for each balcony type), any other materials/details to be used.\r\nThe development shall then be carried out in accordance with the approved details and maintained as such thereafter.\r\nReason: in order to safeguard the visual amenity of the area and buildings.\r\n","Condition : 8 - Landscape Plan \r\nNo above ground works shall be commenced until details of both hard and soft landscape works have been submitted to and approved in writing by the Local Planning Authority. The works shall then be carried out as approved.\r\nThe detailed landscaping scheme shall include:\r\n�\tsoft planting: including any grass and turf areas, trees, planters, shrubs and herbaceous areas, including details of species, sizes, numbers/densities and sections of landscaped areas;\r\n�\ta 'Tree Planting Statement' providing full details, locations, specifications and construction methods for all purpose-built tree pits and associated above-ground features, including specifications for tree protection and a stated volume of suitable growing medium to facilitate and promote the healthy development of the proposed trees, ensuring each tree has a soil volume equivalent of 0.6 times its canopy area at maturity;\r\n�\thard landscaping: including ground surfaces, kerbs, edges, ridge and flexible paving, furniture, steps, refuse disposal points and, if applicable, synthetic surfaces for both ground level and roof terrace level (where relevant);\r\n�\tfences and walls and any other boundary treatments;\r\n�\tvisitor cycle parking spaces;\r\n�\tquiet zones protected from excessive noise levels;\r\n�\tplay spaces and play equipment;\r\n�\tany signage and information boards;\r\n�\tgreen roofs and green walls;\r\n�\tany CCTV equipment; and\r\n�\tAll lighting should use low UV warm-white LED bulbs with direction-al, downward facing and shielded lights which point away from the river. Internal luminaires can be recessed where installed in proximity to windows to reduce glare and light spill or treated with low-transmission glazing. Lights in the public realm should be subject to curfew controls where possible with lights on movement sensors to reduce light pollution when not needed.\r\nThe submission shall include a management programme for the lifetime of the development, which shall include:\r\nLong term design objectives","Condition : 9 - Retained Trees \r\nThe development shall be carried out in accordance with the Arboricultural Impact Assessment and Method Statement (Revision C - December 2025) and Tree Protection Plan ref. J24-021416_P2_Arb_TPP_C.\r\n\r\nThe erection of fencing for the protection of any retained tree or hedge shall be carried out in complete accordance with BS5837:2012, before any equipment, machinery, or materials are brought onto the site for the purposes of development or other operations. The fencing shall be retained intact for the full duration of the development until all equipment, materials and surplus materials have been removed from the site. If the fencing is damaged, all operations shall cease until it is repaired in accordance with the approved details. Nothing shall be stored or placed in any fenced area in accordance with this condition, and the ground levels within those areas shall not be altered, nor shall any excavations be made without the written approval of the Local Planning Authority.\r\n\r\nReason: To enable the Local Planning Authority to ensure the retention of the maximum number of trees on the site and their protection from damage, in the interests of biodiversity and visual amenity area.\r\n","Condition : 10 - Wheelchair units \r\n\r\nThe Wheelchair User Dwellings shall be provided to meet Building Regulations M4(3) standard, as per drawings refs. CHAH-WAB-A1-01-DR-AR-104011; CHAH-WAB-A1-01-DR-AR-104033; CHAH-WAB-A1-05-DR-AR-104027; CHAH-WAB-A1-ZZ-DR-AR-104014; CHAH-WAB-B1-ZZ-DR-AR-104010; CHAH-WAB-D1-01-DR-AR-104026 and CHAH-WAB-ZZ-ZZ-DR-AR-104028, in addition to the Design and Access Statement Addendum, dated November 2025, unless otherwise agreed in writing with the Local Planning Authority.\r\n\r\nAll other dwellings shall be designed so that they meet building regulation M4 (2) 'accessible and adaptable dwellings'. The wheelchair units shall be completed in accordance with the agreed details and so maintained thereafter. \r\n\r\nReason: To ensure a socially inclusive and sustainable development.\r\n","Condition : 11 - Cycle parking \r\n\r\nNotwithstanding the details shown on the approved plans, no above ground works shall be commenced until full details (including manufacturers' specifications), residential and commercial cycle parking facilities, including storage, access and lifts, shall be submitted to and approved in writing by the Local Planning Authority. The approved facilities shall conform to current guidance from Chapter 8 of the London Cycling Design Standards in design and layout as at the date of permission and be fully implemented and made available for use before the first occupation of the development and thereafter retained for use at all times without obstruction.\r\n\r\nReason: To support sustainable transport objectives.\r\n","Condition : 12 - Electric Vehicle Charging spaces \r\n\r\nAny passive blue badge parking bays brought forward during operation of the development will be Electric Vehicle Charging spaces, unless otherwise agreed in writing with the Local Planning Authority.\r\n\r\nReason: In order to prevent obstruction and inconvenience to users of the adjacent highway and the premises, in the interests of road safety and in order to promote sustainable transport modes.\r\n","Condition : 13 - Vehicle access \r\n\r\nPrior to first occupation of any dwelling hereby approved, the existing vehicle accesses to Wilkes Road and Albany Road should be removed, and footway reinstated with full height kerbs.\r\n\r\nReason: In the interests of parking and pedestrian safety.\r\n","Condition : 14 - Revised Air Quality Assessment \r\n\r\nThe development shall be carried out in accordance with the details approved under application ref. P/2024/4208, approved on 27/06/2025. \r\n\r\nReason: In order to ensure that the future residents of the development will not be exposed to a significant increase in poor air quality.\r\n","Condition : 15 - Air quality - Construction machineryAll Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA's Supplementary Planning Guidance 'Control of Dust and Emissions During Construction and Demolition'dated July 2014 (SPG), or subsequent guidance. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at:\r\nhttps://nrmm.london/\r\nThe developer shall also demonstrate that proposed development is compliant with\r\nBuilding Emissions Benchmarks (BEBs), specified in GLA's Sustainable Design and\r\nConstruction SPG (Apr. 2014).\r\n\r\nReason: To minimise air pollution in accordance with Local Plan policy EQ4 and London Plan policy SI1.\r\n","Condition : 16 - Heat network safeguarding \r\n\r\nProvisions to enable the connection to a feasible district heating network in the future will be made as per drawings refs. CHAH-THD-XX-XX-DR-ME-002100 Rev P03 and CHAH-THD-ZZ-00-DR-CS-006000 Rev P01, unless otherwise agreed in writing by the Local Planning Authority.\r\n\r\nThe development shall be constructed and completed in accordance with the agreed details. \r\n\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 17 - Water use \r\n\r\nPrior to first occupation of each residential block, evidence (schedule of fittings and manufacturer's literature) should be submitted to the Local Planning Authority and approved in writing to show that the development has been constructed in accordance with the approved internal water use calculations and an internal water use of 105L/person/day or less is achieved.\r\n\r\nReason: in order to protect and conserve water supplies and resources.\r\n","Condition : 18 - Fixed plant noise criteria  \r\n\r\nThe cumulative noise from any fixed external plant associated with the scheme should not exceed levels more than 10 dB below representative background (LA90) levels at free field locations representing facades of nearby existing and proposed dwellings.\r\nNoise levels should be assessed by measurement or calculation based on the guidance presented within BS4142: 2014+A1:2019 or subsequent versions of this guidance.\r\n\r\nReason: In order to ensure that existing and proposed residential units are not exposed to unreasonable levels of fixed plant noise.\r\n","Condition : 19 - Internal and external noise criteria \r\n\r\nMaximum noise levels permitted within the dwellings will not exceed those that are specified in Table 4 of British Standard 8233:2014 [Living Rooms = 35 dB LAeq, 16 hours; Dining room/area = 40 dB LAeq, 16 hours; Bedroom = 35 dB LAeq, 16 hours during day-time (07:00 - 23:00) and Bedroom = 30 dB LAeq, 8 hours during night-time (23:00 - 07:00), night-time (23:00 - 07:00) LAmax noise levels within bedrooms do not exceed 45 dB LAmax more than 10 to 15 times per night.\r\n\r\nPrior to the development being occupied, Internal Ambient Noise Level (IANL) tests shall be submitted to and approved in writing by the Local Planning Authority. Noise tests shall be carried out taking account of worst-case environmental conditions, such as easterly operations at Heathrow, peak time traffic flows, and wind speed, with continuous logged data shall be submitted. IANL test will demonstrate compliance with the criteria stated within the paragraph above.\r\n\r\nAll occupiers should have access to amenity spaces where noise levels do not exceed 55dB LAeq, 16hours.\r\n\r\nReason: To protect the amenities of residents.\r\n","Condition : 20 - Internal transmission of noise from commercial to residential dwellings \r\n\r\nDetails shall be submitted to the Local Planning Authority for approval prior to the commencement of construction works of the sound insulation of the floor/ ceiling/ walls separating the commercial and communal part(s) of the premises from dwellings.\r\n\r\nDetails shall demonstrate that the sound insulation value DnT,w [and L'nT,w where appropriate] is enhanced by at least 10-15dB above the Building Regulations value and, where necessary, additional mitigation measures are implemented to contain commercial/ communal noise in the commercial/communal areas and to achieve the criteria of BS8233:2014 within the dwellings/ noise sensitive premises. Approved details shall be implemented prior to occupation of the development and thereafter be permanently retained. Upon completion, the on-site performance of these elements will be demonstrated during pre-completion acoustic testing.\r\n\r\nReason: To protect the amenities of existing and future residents.\r\n","Condition : 21 - Sound insulation from external noise sources\r\n\r\nPrior to the development being occupied, facade sound insulation tests shall be submitted to and approved in writing by the Local Planning Authority. Noise tests shall be carried out taking account of worst-case environmental conditions, such as easterly operations at Heathrow, peak time traffic flows, and wind speed. Continuous logged data shall be submitted.\r\n\r\nReason: To protect the amenities of residents.\r\n","Condition : 22 - Contamination \r\n\r\nThe details subject to Parts a and b of this condition have been approved under planning application ref: P/2025/0642, approved dated 01/07/2025, and the development shall be carried out in accordance with approved details of P/2025/0642.\r\nDuring the course of the development:\r\nc)\tThe Local Planning Authority shall be notified immediately if additional contamination is discovered during the course of the development. A competent person shall assess the additional contamination, and shall submit appropriate amendments to the scheme for decontamination in writing to the Local Planning Authority for approval before any work on that aspect of development continues. \r\nBefore the development is first brought into use:\r\nd)\tThe agreed scheme for decontamination referred to ref: P/2025/0642, approved dated 01/07/2025, and in (c) above, including amendments, shall be fully implemented, and a written validation (closure) report shall be submitted to the Local Planning Authority for approval.\r\nReason: Contamination is known or suspected on the site due to a former land use. In addition, areas cleared due to war damage are also suspected on the site. The LPA therefore wishes to ensure that the development can be implemented and occupied with adequate regard for public and environmental safety.\r\n\r\nSupporting notes:\r\na.\tAn initial phase 1 desk study has been submitted with the original application and is considered satisfactory. A phase 2 intrusive investigation will need to be submitted and will include an investigation into outstanding potential contamination issues to be communicated by the local planning authority and allow the development of a site Conceptual Model (CM), which identifies all potential pollutant linkages on the site. It should be noted that any intrusive work carried out on site should follow necessary precautions measures for working on a potential UXO site to ensure the safety of all parties involved. Risk assessments must adhere to current","Condition : 23 - Sustainable materials \r\n\r\na)\tNo development (except demolition, archaeological investigations, ground condition investigations, intrusive site surveys and other enabling works: site clearance; soil storage; remedial works in respect of any contamination or any other adverse ground conditions; erection of any temporary means of enclosure and land raising) shall take place until details have been submitted to and approved by the Local Planning Authority that:\r\n�\tAt least three of the key elements of the building envelope (external walls, windows, roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n�\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) schemes.\r\n�\tDetailed measures taken to avoid construction or insulation materials which will release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\nb)\tThe development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the Local Planning Authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition.\r\n\r\nReason: In order to ensure the sustainable sourcing of materials.\r\n","Condition : 24 - Energy Strategy \r\n\r\nA)\tThe development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\nB)\tPrior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) should be submitted to the Local Planning Authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a minimum 62% reduction in emissions. Both the domestic and non-domestic elements of the development must separately meet the minimum on-site London plan carbon emission savings target of 35%.\r\nC)\tUpon final commencement of operation of any low and zero carbon technologies, suitable devices for the monitoring of the low and zero carbon technologies shall have been installed, and the monitored data shall be submitted automatically to a monitoring web-platform at daily intervals for a period of three years from the point of full operation.\r\n\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 25 - BREEAM - Design Stage Certificate \r\n\r\nPrior to the commencement of above ground works on each block, a Design and Build stage BREEAM Retail New Construction Shell only Design Stage certificate and summary score sheet (or such equivalent standard that replaces this) must be submitted to and approved in writing by the Local Planning Authority to show that an 'Excellent' (minimum score 70%) rating will be achieved.\r\n\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 26 - BREEAM - Post Construction Review Certificate \r\n\r\nWithin six months of occupation of the commercial units, a post-construction stage BREEAM Retail New Construction Shell only Design Stage certificate and summary score sheet (or such equivalent standard that replaces this) must be submitted to and approved in writing by the Local Planning Authority to show that an 'Excellent' (minimum score 70%) rating has been achieved.\r\n\r\nReason: To ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 27 - Whole Life Carbon \r\n\r\nPrior to the occupation of each building, the post-construction tab of the GLA's whole life carbon assessment template should be completed accurately and in its entirety in line with the GLA's Whole Life Carbon Assessment Guidance. The post-construction assessment should provide an update of the information submitted at planning submission stage, including the whole life carbon emission figures for all life-cycle modules based on the actual materials, products and systems used. This should be submitted to the GLA at: ZeroCarbonPlanning@london.gov.uk, along with any supporting evidence as per the guidance.\r\nConfirmation of submission to the GLA shall be submitted to, and approved in writing by, the local planning authority, prior to occupation of the relevant building.\r\n\r\nReason: In the interests of sustainable development and to maximise on-site carbon dioxide savings.\r\n","Condition : 28 - Circular Economy Statement \r\n\r\nPrior to the occupation of any building, a Post Completion Report setting out the predicted and actual performance against all numerical targets in the relevant Circular Economy Statement shall be submitted to the GLA at: \r\nCircularEconomyLPG@london.gov.uk, along with any supporting evidence as per the GLA's Circular Economy Statement Guidance. The Post Completion Report shall provide updated versions of Tables 1 and 2 of the Circular Economy Statement, the Recycling and Waste Reporting form and Bill of Materials. Confirmation of submission to the GLA shall be submitted to, and approved in writing by, the local planning authority, prior to occupation.\r\n\r\nReason: In the interests of sustainable waste management and in order to maximise the re-use of materials.\r\n","Condition : 29 - Secure by Design \r\n\r\nThe development shall achieve 'Secured by Design' accreditation awarded by the Design Out Crime Officer from the Metropolitan Police Service on behalf of the Association of Chief Police Officers (ACPO). No dwelling shall be occupied until accreditation has been achieved and evidence of such accreditation has been submitted to and approved in writing by the Local Planning Authority.\r\n\r\nThe development shall be so maintained thereafter.\r\n\r\nReason: In pursuance of the Council's duty under section 17 of the Crime and Disorder Act 1998 to consider crime and disorder implications in exercising its planning functions; to promote the well-being of the area in pursuance of the Council's powers under section 2 of the Local Government Act 2000, and to ensure the development provides a safe and secure environment.\r\n","Condition : 30 - Drainage \r\n\r\nThe detailed drainage design must be carried out in accordance with the Flood Risk Assessment Addendum V5 ref. 2944 (dated March 2026), in addition to the Drainage Assessment Form (contained within), prepared by Civic Engineers.\r\n\r\nManagement of drainage components will be carried out in accordance with the Drainage Management Plan contained within the Flood Risk Assessment Addendum Rev V5, and to be maintained for the lifetime of the development.\r\n\r\nReason: To prevent the risk of flooding to and from the site.\r\n","Condition : 31 - Drainage implementation \r\n\r\nNo building hereby permitted shall be occupied until evidence (photographs and installation contracts) is submitted to demonstrate that the sustainable drainage scheme for the site has been completed in accordance with the submitted details. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\n\r\nReason: To prevent the risk of flooding to and from the site.\r\n","Condition : 32 - Thames Water - Surface water \r\n\r\nNo development shall be occupied until confirmation has been provided that either:\r\n1.\tSurface water capacity exists off site to serve the development or,\r\n2.\tA development and infrastructure phasing plan has been agreed with the Local Authority in consultation with Thames Water. Where a development and infrastructure phasing plan is agreed, no occupation shall take place other than in accordance with the agreed development and infrastructure phasing plan; or,\r\n3.\tAll Surface water network upgrades required to accommodate the additional flows from the development have been completed.\r\n\r\nReason: Network reinforcement works may be required to accommodate the proposed development. Any reinforcement works identified will be necessary in order to avoid flooding and/or potential pollution incidents. The developer can request information to support the discharge of this condition by visiting the Thames Water website at thameswater.co.uk/preplanning.\r\n","Condition : 33 - Thames Water - Strategic water main \r\n\r\nNo construction shall take place within 5m of the water main. Should construction be required within 5m of the water main, information detailing how the developer intends to divert the asset / align the development, so as to prevent the potential for damage to subsurface potable water infrastructure, must be submitted to and approved in writing by the local planning authority in consultation with Thames Water. Any construction must be undertaken in accordance with the terms of the approved information. Unrestricted access must be available at all times for the maintenance and repair of the asset during and after the construction works. \r\n\r\nReason: The proposed works will be in close proximity to underground strategic water main and utility infrastructure. The works has the potential to impact the local underground water utility.\r\nPlease read our guide \"working near our assets\" to ensure your work will be in line with the necessary processes you need to follow if you? re considering working above or near our pipes or other structures.\r\nhttps://developers.thameswater.co.uk/Developing-alarge-site/Planning-your- development/Working-near-ordiverting-our-pipes\r\nShould you require further information, please contact Thames Water. Email: developer.services@thameswater.co.uk\r\n\r\n","Condition : 34 - Thames Water - network infrastructure\r\n\r\nNo development shall be occupied until confirmation has been provided that either:\r\n-\tall water network upgrades required to accommodate the additional demand to serve the development have been completed; or\r\n-\ta development and infrastructure phasing plan has been agreed with Thames Water to allow development to be occupied. Where a development and infrastructure phasing plan is agreed, no occupation shall take place other than in accordance with the agreed development and infrastructure phasing plan.\r\n\r\nReason: The development may lead to no / low water pressure, and network reinforcement works are anticipated to be necessary to ensure that sufficient capacity is made available to accommodate additional demand anticipated from the new development.\r\nThe developer can request information to support the discharge of this condition by visiting the Thames Water website at thameswater.co.uk/preplanning.\r\n","Condition : 35 - Restriction of permitted development rights (residential conversion) \r\n\r\nNotwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking or re-enacting that order), no change of use under Part 3 Class M or Class MA, enlargement of the premises or any additional structures/buildings within the curtilage of the site shall be carried out.\r\n\r\nReason: In the interests of the amenity of the area and order that the Local Planning Authority is able to exercise control over future development of the site. \r\n","Condition : 36 - Timing of vegetation clearance (breeding birds) \r\n\r\nAll removal of trees, hedgerows, shrubs, scrub or tall herbaceous vegetation shall be undertaken between September and February inclusive. If this is not possible, then a suitably qualified ecologist shall check the areas concerned immediately prior to the clearance works to ensure that no nesting or nest-building birds are present. If any nesting birds are present, then the vegetation shall not be removed until the fledglings have left the nest.\r\n\r\nReason. All wild birds, their nests and young are protected during the nesting period under The Wildlife and Countryside Act 1981 (as amended). In the interests of nature conservation and biodiversity.\r\n","Condition : 37 - Ecological Management Plan \r\n\r\nThe measures set out within the Ecological Management Plan by Green-space (dated January 2025) shall be carried out as part of the approved development unless otherwise agreed in writing with the Local Planning Authority.\r\n\r\nReason: In the interests of Nature Conservation.\r\n","Condition : 38 - Fire safety \r\n\r\nThe development shall be carried out in accordance with the details outlined in the approved Fire Strategy Reports and Addendums refs. AFF_21367_02_Charlton & Albany House_FSR_03, AFF_21367_02_Charlton & Albany House Block B_FSR_03 and AFF_21367_02_Charlton & Albany House Block C&D_FSR_02 (dated De-cember 2025), prepared by Affinity Fire Engineering.\r\n\r\nA minimum of at least one lift per core for each building shall be a suitably sized fire evacuation lift (or more, subject to capacity assessments), suitable to be used to evacuate people who require level access from the building, as per the Fire Strategy Reports.\r\n\r\nReason: In the interests of fire safety.\r\n","Condition : 39 - Digital Connectivity \r\n\r\nPrior to commencement of each building, detailed plans shall be submitted to and approved in writing by the local planning authority demonstrating the provision of sufficient ducting space for full fibre connectivity infrastructure within the development.\r\nThe development shall be carried out in accordance with these plans and maintained as such in perpetuity.\r\n\r\nReason: To provide high quality digital connectivity infrastructure to contribute to London's global competitiveness. \r\n","Condition : 40 - Archaeology \r\n\r\nThe development shall be carried out in accordance with Written Scheme of Investigation (WSI) approved under application ref: P/2024/4209, approved dated 05/06/2025.\r\n\r\nFor land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works.\r\nReason: In the interests of the conservation of archaeological interest.\r\n","Condition : 41 - Land Use \r\n\r\nThe permitted floorspace (gross internal area in square meters) for the commercial uses granted by this permission shall be:\r\n�\tFlexible commercial floor space (Use Class E) � maximum 1,061 sqm\r\n�\tConvenience Store (Use Class E(a)) � minimum184 sqm;\r\n�\tHot Food Takeaway (Sui Generis) � 285 sqm\r\n\r\nReason: To ensure that the development is carried out in accordance with the approved plans and other submitted details and to ensure that the quantum of floorspace keeps within the parameters assessed in relation to the development, so that the Council may be satisfied as to the details of the development in the interests of the amenity of the area.\r\n","Condition : 42 - Highways \r\n\r\nAll works to the southeastern corner of the Site shall be constructed in accordance with the approved drawings unless otherwise agreed in writing by the Local Planning Authority.\r\n\r\nReason: To support sustainable transport objectives.\r\n","Condition : 43 - Wind \r\n\r\nPrior to the occupation of any dwelling in Block A, details of the measures to restrict access to the south western edge of the western-most north-facing balcony on Block A, in accordance with the recommendations of the approved wind microclimate assessment, shall be submitted to and improved in writing by the Local Planning Authority.\r\n\r\nThe measures shall be implemented as approved and so maintained for the lifetime of the development.\r\n\r\nReason: In order to safeguard the amenities of residents and the amenities of the locality.\r\n\r\n","Condition : 44 - Residential Units \r\n\r\nThe approved development shall comprise 182 residential units (Class C3) as shown on the plans hereby approved.\r\n\r\nReason: To provide certainty for all parties\r\n","Condition : 45 - Community Use?\r\n\r\nPrior to first occupation of the commercial units, the applicant shall engage with the Local Planning Authority Equality Team to review whether any part of the flexible commercial floorspace should incorporate community use to meet identified equality needs. Evidence of this engagement, including any agreed actions or provision, shall be submitted to and approved in writing by the Local Planning Authority and implemented as approved. \r\n\r\nReason: ensures the development meets demonstrable community needs.\r\n","Condition : 46 - Waste management  \r\n\r\nThe refuse collection arrangements shall be carried out in accordance with the approved Operational Waste Management Strategy, as agreed with the LBH Ward Improvement Delivery Manager. At no time shall waste bins be stored or placed in a manner that obstructs the public highway or footway.\r\n\r\nReason: In order to ensure adequate provision for waste and recycling. \r\n","Condition : 47 - Bird Hazard Management Plan \r\n\r\nAbove ground works shall not commence until a Bird Hazard Management Plan has been submitted to and approved in writing by the Local Planning Authority. The submitted plan shall include details of:\r\n-\tManagement of any flat/shallow pitched/green roofs on buildings within the site, which may be attractive to nesting, roosting and \"loafing\" birds.\r\nThe Bird Hazard Management Plan shall be implemented as approved and shall remain in force for the life of the buildings. No subsequent alterations to the plan are to take place unless first submitted to and approved in writing by the Local Planning Authority.\r\nReason: It is necessary to manage the flat roofs to minimise their attractiveness to birds, which could endanger the safe movement of aircraft and the operation of Heathrow Airport.\r\n"],"actual_commencement_date":null,"pp_id":"14483256","decision_target_date":"16/07/2026","valid_date":"08/01/2026","lpa_app_no":"P/2026/0045","locality":"Brentford","appeal_decision_date":null,"parking_details":null,"decision_process":null,"street_name":"Albany Road","last_synced":"2026-07-14T01:41:39.179Z","site_number":null,"centroid_easting":518105.0,"polygon":{"geometries":[{"coordinates":[[[518124.92147827847,177743.06075026907],[518117.0751499154,177759.1984035023],[518061.4052754041,177720.5923192417],[518003.76536852744,177675.64067269056],[518019.29731955286,177657.37371231813],[518027.61202521884,177651.46493464272],[518043.687260626,177644.13647579995],[518048.1723537485,177640.08945772337],[518052.546892098,177631.67135038922],[518058.5625854919,177618.2173669339],[518074.53620847454,177625.44632300618],[518121.6719604908,177656.06173692964],[518167.28172875044,177683.18740461522],[518139.9309912707,177750.24181609572],[518124.92147827847,177743.06075026907]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Brentford West","centroid_northing":177728.0,"application_type":"All Other","uprn":"10091693770","lapsed_date":"06/07/2029","actual_completion_date":null,"decision":"Approved","site_name":"Garage Block At Charlton House","borough":"Hounslow","last_date_consultation_comments":"13/03/2026","application_type_full":"Removal/Variation of a condition","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0045","decision_date":"07/07/2026","bo_system":"Northgate M3","development_type":"Major dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"Variation of conditions 2 (approved plans), 9 (retained trees), 10 (wheelchair units), 16 (heat network), 19 (noise), 30 (drainage), 33 (Thames Water strategic water main), 38 (fire safety), 41 (land use) and 44 (residential units) to allow the rewording of the conditions, reduction in number of residential units and commercial floorspace, minor footprint adjustments, minor design amendments, minor configuration of landscaping and adjustment of car parking provision, of planning permission P/2024/4109 approved 05/08/2025 and amended by P/2025/3194 for the demolition of the existing buildings and erection of buildings, to provide residential dwellings (Use Class C3) together with non-residential floorspace comprising; commercial, business and service floorspace (Use Class E); including retail floorspace (Use Class E(a)); and hot food takeaway (Sui-Generis); with associated hard and soft landscaping, parking and servicing, cycle and refuse stores, boundary treatments and other associated works.","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-13T08:00:13.066Z","centroid":{"lon":-0.300411,"lat":51.48618},"lpa_name":"Hounslow","secondary_street_name":null,"application_details":{},"wgs84_polygon":{"coordinates":[[[-0.30012,51.486311],[-0.300227,51.486458],[-0.301041,51.486122],[-0.301886,51.48573],[-0.301669,51.485563],[-0.301551,51.485508],[-0.301322,51.485439],[-0.301259,51.485401],[-0.301199,51.485325],[-0.301117,51.485203],[-0.300884,51.485264],[-0.300195,51.48553],[-0.29953,51.485764],[-0.299901,51.486372],[-0.30012,51.486311]]],"type":"Polygon"},"id":"Hounslow-P_2026_0045","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Northgate M3"}