{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hounslow","subdivision_of_building":"N/A","appeal_decision":null,"lapsed_date":"04/08/2027","appeal_decision_date":null,"last_updated_by":"Northgate M3","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-07-06T15:10:08.877Z","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0294","street_name":"Jersey Road","parking_details":null,"ward":"Osterley & Spring Grove","bo_system":"Northgate M3","site_name":"Brentford Fc Training Ground","site_number":"100","application_details":{"total_gia_existing":0,"ownership_status":"Private","phasing_details":[{"phase_detail":"1","intended_completion_date":"05/2026","intended_commencement_date":"03/2026"}],"garden_land_lost":false,"total_gia_gained":77.9,"existing_proposed_floorspace_details":[{"gia_existing":0,"use_class":"F2","gia_gained":77.9,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"total_annual_pm_emissions":0,"no_new_water_connections_required":0,"waste_provision":false,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":0,"percentage_demolition_construction_material_recycling":0,"green_roof_area":0,"urban_greening_factor_score":0.43,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":false,"fire_suppression_system_proposed":false,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"1","external_residual_waste":false,"reason_for_no_provision":"It is a storage unit for kit in relation to the existing training ground and therefore will not generate waste. There are adequate waste disposal facilities on site as existing. ","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"total_annual_nox_emissions":0},"rain_water_harvesting":false,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":1,"max_height":3.1,"building_ref":"Storage Unit"}],"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"total_gia_lost":0,"surface_water_discharge_percentage_reduction":0,"site_area":0.022,"grey_water_reuse":false,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":77.9,"total_non_resi_gross_internal_floor_area_to_be_gained":0}},"uprn":"100022832331","locality":"Hounslow","date_building_work_started_under_previous_permission":null,"postcode":"TW5 0TP","valid_date":"23/02/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":51.481958,"lon":-0.360134},"centroid_easting":513969.0,"application_type_full":"Full planning permission","pp_id":"14639846","lpa_app_no":"P/2026/0294","polygon":{"geometries":[{"coordinates":[[[514170.9375000005,177385.58756287635],[514183.1874999988,177395.6573593848],[514195.4375000004,177380.33375600295],[514181.00000000093,177370.70177673158],[514170.9375000005,177385.58756287635]]],"type":"Polygon"}],"type":"geometrycollection"},"id":"Hounslow-P_2026_0294","appeal_status":null,"appeal_start_date":null,"description":"Erection of a single storey temporary storage unit. ","development_type":"Minor all other minor developments","decision_conditions":["Condition : 1 - The permission hereby granted shall be for a limited period expiring on 04th August 2027 when the use shall cease and any approved structures shall be removed and the land restored to its former condition.\r\nReason: The proposal is not considered suitable as a permanent form of development to safeguard neighbours' living conditions and the character and appearance of the area.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: 25093 010 P2, 25093 100 P2, 25093 200 P2, 25093 201 P2 and L030-P-1105 Rev C. Received: 30.01.2026.\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, unless otherwise shown on the approved plans.\r\nReason: In order to safeguard the appearance of the area.","Condition : 4 - Prior to the first commencement of the hereby approved development, a Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority, the Plan shall include;\r\n(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat,\r\n(b) the pre-development biodiversity value of the onsite habitat,\r\n(c) the post-development biodiversity value of the onsite habitat,\r\n(d) any registered offsite biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development,\r\n(e) any biodiversity credits purchased for the development, and\r\n(f) such other matters as the Secretary of State may by regulations specify.\r\nThe development shall thereafter be carried out in accordance with the approved Plan prior to the first occupation of the development. Any habitats created or enhanced on-site and off-site in accordance with the Biodiversity Gain Plan must be maintained thereafter for a minimum of 30 years.\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.","Condition : 5 - A) Prior to the first commencement of the hereby approved development a Habitat Management and Monitoring Plan (HMMP) prepared in accordance with the approved Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include:\r\n(i) a non-technical summary;\r\n(ii) the roles and responsibilities of the people or organisation(s) delivering the HMMP\r\n(iii) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;\r\n(iv) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and \r\n(v) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. \r\n\r\nB) No occupation or use of the hereby approved development shall take place until:\r\n(i) the habitat creation and enhancement works set out in the approved HMMP have been completed; and \r\n(ii) a completion report, evidencing the completed habitat enhancements, has been submitted to, and approved in writing by the Local Planning Authority. \r\nThe created and/or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP.\r\n\r\nC) Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved HMMP.\r\n\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.\r\n"],"last_synced":"2026-07-07T01:58:45.661Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"26/03/2026","decision_process":null,"centroid_northing":177164.0,"borough":"Hounslow","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.357156,51.483909],[-0.356976,51.483997],[-0.356805,51.483857],[-0.357016,51.483773],[-0.357156,51.483909]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"21/04/2026","status":"Approved","decision_date":"21/04/2026"}