{"decision":"Approved","last_date_consultation_comments":"02/03/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.364408,51.47569],[-0.364396,51.47569],[-0.364193,51.475694],[-0.364142,51.475695],[-0.363906,51.475697],[-0.363906,51.475704],[-0.363904,51.475748],[-0.363902,51.475779],[-0.36401,51.475778],[-0.36401,51.475778],[-0.364042,51.475778],[-0.364093,51.475778],[-0.364203,51.475776],[-0.364204,51.475776],[-0.364366,51.475773],[-0.364477,51.475771],[-0.364486,51.475756],[-0.364518,51.475698],[-0.364523,51.475688],[-0.364408,51.47569]]]},"date_building_work_started_under_previous_permission":null,"ward":"Hounslow Central","site_number":"143","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[513687.79667883116,176460.2769437916],[513688.6696468042,176460.3253746879],[513702.71940256987,176461.02535908401],[513706.26514350815,176461.20249613933],[513722.6694692176,176461.8750433395],[513722.6690955005,176462.57596620588],[513722.70757345774,176467.5400867262],[513722.7194739577,176470.92596176203],[513715.228271785,176470.7374106926],[513715.21021621185,176470.73700720293],[513713.0381667997,176470.64952813578],[513709.48055130243,176470.50661107953],[513701.8192656683,176470.12513896695],[513701.8095185943,176470.12603376032],[513690.5296300438,176469.56359138485],[513682.81916117424,176469.1754861569],[513682.2722370539,176467.46990707447],[513680.1851228195,176460.96581377793],[513679.81943088165,176459.82502861926],[513687.79667883116,176460.2769437916]]],"type":"Polygon"}]},"appeal_status":null,"application_type_full":"Full planning permission","borough":"Hounslow","lpa_name":"Hounslow","postcode":"TW3 4EA","appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"24/03/2026","site_name":null,"decision_date":"17/06/2026","pp_id":"14666174","actual_completion_date":null,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0304","application_details":{"surface_water_discharge_percentage_reduction":0,"site_area":0.037200000000000004,"projected_cost_of_works":"Up to £2m","garden_land_lost":false,"scheme_phasing":true,"infrastructure_details":{"no_passive_slow_ev_charging_points":0,"fire_suppression_system_proposed":false,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":2,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_active_slow_ev_charging_points":1,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_new_gas_connections_required":1,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false},"internal_resi_water_usage":110,"ownership_status":"Private","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0,"total_gia_existing":242},"existing_proposed_floorspace_details":[{"gia_existing":242,"use_class":"C3","gia_gained":0,"gia_lost":0}],"green_suds":false,"phasing_details":[{"phase_detail":"construction phase","intended_commencement_date":"03/2026","intended_completion_date":"04/2026"}],"total_gia_gained":0,"total_gia_existing":242,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"residential_details":{"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units":2,"affordable_percentage":0.0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_social_rent":0,"residential_units":[{"no_habitable_rooms":6,"change_type":"Loss","sheltered_accommodation":false,"no_bedrooms":4,"unit_type":"House or Bungalow","provision_for_older_persons":false,"gia":242},{"provider":"Private","no_habitable_rooms":5,"change_type":"Gain","no_bedrooms":4,"unit_type":"Flat Apartment Maisonette","gia":130.6,"tenure":"Market for rent"},{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","no_bedrooms":3,"unit_type":"Flat Apartment Maisonette","gia":112,"tenure":"Market for rent"}],"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_market_for_rent":2,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_bedrooms":7,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_london_living_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units":1,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_gia_gained":242.6,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_affordable_units":0,"total_gia_lost":242,"total_no_existing_residential_units_discount_market_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_starter_homes":0},"rain_water_harvesting":false},"development_type":"Other change of use","centroid_easting":513694.0,"decision_target_date":"17/06/2026","decision_agency":"Borough","actual_commencement_date":null,"lpa_app_no":"P/2026/0304","decision_process":null,"lapsed_date":"16/06/2029","uprn":"100021553048","bo_system":"Northgate M3","cil_liability":false,"street_name":"Lampton Road","locality":"Hounslow","application_type":"All Other","epc_number":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: PL-015, PL-016, PL-019 (received: 21.05.2026) and PL-004, PL-017, PL-018 (received: 30.03.2026).\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - Prior to occupation full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development shall not be carried out otherwise than in accordance with the approved details. \r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 4 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 5 - (a) No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until a finalised Energy Strategy (demonstrating how the targets for carbon dioxide emissions reduction are to be met in line with the Mayor's energy hierarchy) has been submitted to and approved in writing by the local planning authority. \r\n(b) Should part a require a Carbon Offset Payment, no development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\n(c) The development shall be implemented in accordance with the approved Energy Strategy and shall not commence above ground until full Design Stage calculations under the Standard Assessment Procedure/National Calculation Method have been submitted to and approved in writing by the local planning authority to show that the development will be constructed in accordance with the approved Energy Strategy, or any subsequent approved revisions.\r\n\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions and to ensure the development meets sustainability standards.","Condition : 6 - Notwithstanding any details included in the submitted plans, the scheme shall not be occupied until details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include:  \r\n�\tA statement setting out the design objectives and how these will be delivered;  \r\n�\tmeans of enclosure/boundary treatment(s), including the proposed soft landscaping preventing vehicular access to the rear of the site; \r\n�\tvehicle parking layouts;  \r\n�\tother vehicle and pedestrian access and circulation areas; \r\n�\thard surfacing materials;  \r\n�\tminor artefacts and structures (e.g. refuse or other storage units);  \r\n�\trenewable energy installations (where relevant); \r\n�\tplanting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; and \r\n�\tan implementation programme. \r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\n\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 7 - No dwelling shall be occupied until space has been laid out within the site in accordance with approved plan no. PL-004 for four bicycles to be parked and that space shall thereafter be kept available for the parking of bicycles; prior to commencement of the use.\r\nReason: In order to support sustainable transport objectives."],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":176463.0,"last_updated":"2026-10-20T13:00:17.510Z","centroid":{"lon":-0.364318,"lat":51.475713},"subdivision_of_building":null,"last_synced":"2026-10-21T16:25:19.917Z","last_updated_by":"Northgate M3","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Hounslow-P_2026_0304","parking_details":{"no_proposed_car":0,"no_existing_car":4,"net_car":-4},"description":"Conversion of the existing family house to two self contained flats with associated car parking and refuse storage."}