{"decision":"Approved","last_date_consultation_comments":"06/03/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.267753,51.48966],[-0.268032,51.489706],[-0.268038,51.489707],[-0.268055,51.48971],[-0.268058,51.48971],[-0.268105,51.489718],[-0.268149,51.489725],[-0.26819,51.489732],[-0.268227,51.489738],[-0.268238,51.489739],[-0.268289,51.489748],[-0.268285,51.489758],[-0.268267,51.489812],[-0.268262,51.489811],[-0.268213,51.489804],[-0.268166,51.489797],[-0.268123,51.489791],[-0.268078,51.489784],[-0.268032,51.489777],[-0.267984,51.48977],[-0.267939,51.489764],[-0.267893,51.489757],[-0.267848,51.48975],[-0.267803,51.489743],[-0.26775,51.489736],[-0.267704,51.489729],[-0.267653,51.489721],[-0.26761,51.489714],[-0.267569,51.489709],[-0.267527,51.489702],[-0.267489,51.489697],[-0.267505,51.489664],[-0.26754,51.48967],[-0.267581,51.489677],[-0.26761,51.489682],[-0.26762,51.489684],[-0.26766,51.489691],[-0.267663,51.48969],[-0.267666,51.489689],[-0.267668,51.489688],[-0.26767,51.489687],[-0.267673,51.489685],[-0.267675,51.489684],[-0.267676,51.489682],[-0.267677,51.489681],[-0.267679,51.489679],[-0.267693,51.489649],[-0.267733,51.489656],[-0.267753,51.48966]]]},"date_building_work_started_under_previous_permission":null,"ward":"Chiswick Gunnersbury","site_number":"11","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[520363.26722453063,178168.12695106823],[520343.7673332058,178172.8273219848],[520343.36696561094,178172.9268928967],[520342.1781119239,178173.20698064863],[520341.9671677087,178173.2565117136],[520338.6870538362,178174.0267781408],[520335.59705844114,178174.74702286982],[520332.76758712827,178175.4066712898],[520330.1803268688,178176.01641634403],[520329.3673072398,178176.20636874065],[520325.8672037143,178177.02707152942],[520326.0673532001,178178.22677561897],[520327.1673987912,178184.22653152578],[520327.567275474,178184.1770168019],[520330.96706012636,178183.42737565306],[520334.2670566236,178182.72655818803],[520337.26737575844,178182.1265824512],[520340.3673068244,178181.42660133692],[520343.61726957187,178180.72683196835],[520346.9672538127,178180.02720463707],[520350.06739227497,178179.37730286625],[520353.3173841971,178178.6764276178],[520356.4675347184,178178.02659976052],[520359.617481634,178177.32670034195],[520363.26735437167,178176.57631882798],[520366.4673135835,178175.8764937598],[520370.0671519153,178175.12715891],[520373.06707181846,178174.42705708346],[520375.9175745674,178173.87696667755],[520378.8669958643,178173.22685504094],[520381.51696868474,178172.726543613],[520380.4674440123,178169.02667749033],[520378.0471032102,178169.62699534994],[520375.1474210337,178170.34726753936],[520373.15743313765,178170.84316527838],[520372.4573222521,178171.0168666881],[520369.61694014206,178171.72630554938],[520369.46737260907,178171.67714985023],[520369.2669224206,178171.5767220144],[520369.1169724121,178171.42630731798],[520368.96720047324,178171.32707813516],[520368.76703569794,178171.12651974394],[520368.6175491768,178170.92715999798],[520368.5674154553,178170.72681222524],[520368.4669859373,178170.6265248272],[520368.3675097537,178170.42723528744],[520367.46717634413,178167.02686242637],[520364.6770238554,178167.7564069531],[520363.26722453063,178168.12695106823]]],"type":"Polygon"}]},"appeal_status":null,"application_type_full":"Householder planning permission","borough":"Hounslow","lpa_name":"Hounslow","postcode":"W4 4LT","appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"03/02/2026","site_name":null,"decision_date":"19/05/2026","pp_id":"14638339","actual_completion_date":null,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0327","application_details":{"no_additional_bathrooms":0,"no_additional_bedrooms":0,"total_gia_gained":87,"intended_completion_date":"08/2026","intended_commencement_date":"05/2026"},"development_type":"Other house holder developments","centroid_easting":520351.0,"decision_target_date":"19/05/2026","decision_agency":"Borough","actual_commencement_date":null,"lpa_app_no":"P/2026/0327","decision_process":null,"lapsed_date":"18/05/2029","uprn":"100021579916","bo_system":"Northgate M3","cil_liability":false,"street_name":"Burlington Gardens","locality":"London","application_type":"Householder","epc_number":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\n\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [Design and access statement, 2518-PL-004, 2518-PL-003, 2518-PL-002, 2518-PL-001, Flood Risk Assessment, 2518-PL-L&B Rev A, 2518-PL-103 Rev A, London Plan Policy D12(A), Construction Method Statement received 09/02/2026\r\n2518-PL-101 Rev B, 2518-PL-100 Rev B received 15/04/2026\r\n2518-PL-FR Rev B, 2518-PL-102 Rev B, 2518-PL-005, 2518-PL-006 received 29/04/2026].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, unless otherwise shown on the approved plans.\r\nReason: In order to safeguard the appearance of the area.","Condition : 4 - No development shall take place until a Construction Method Statement (CMS) relating to the basement hereby approved has been submitted to the Local Planning Authority. The CMS shall be certified by a qualified professional and give details of excavation, temporary works and construction techniques, including details of potential impacts on neighbouring land based on assessment of the geology and hydrology of the area. The approved CMS shall be adhered to throughout the construction period for the development.\r\nReason: In order to protect the living conditions of neighbouring residents, to minimise flood risk and to ensure highway safety is maintained.","Condition : 5 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 6 - No development shall be carried out until such time as the person carrying out the work is a member of the Considerate Constructors Scheme and its code of practice, and the details of the membership and contact details are clearly displayed on the site so that they can be easily read by members of the public. \r\nReason: In order to protect the living conditions of neighbouring residents.","Condition : 7 - No development shall take place until the following details have been submitted to and approved in writing by the local planning authority:\r\n(a)\tA plan showing the position of each tree on the site and on land adjacent to the site (including street trees) that could influence or be affected by the development, indicating which trees are to be removed;\r\n(b)\tA schedule in relation to each tree identified listing species, diameter and approximate height, and an assessment on the general state of health and stability of each tree, in accordance with British Standard 5837:2012 (or in an equivalent British Standard if replaced); and any proposed pruning, felling or other works;\r\n(c)\tDetails of any proposed alterations to existing ground levels, and of the position of any proposed excavation, that may affect the root protection area of retained trees;\r\n(d)\tDetails of the fencing to be installed for the protection of retained trees.\r\nThe development shall not be carried out otherwise than in accordance with the approved details, which shall be put into effect at the commencement of work on site and retained permanently for the duration of the development works.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity."],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":178173.0,"last_updated":"2026-05-19T16:20:10.372Z","centroid":{"lon":-0.267928,"lat":51.489706},"subdivision_of_building":null,"last_synced":"2026-06-02T09:52:52.308Z","last_updated_by":"Northgate M3","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Hounslow-P_2026_0327","parking_details":{"no_proposed_car":3,"no_existing_car":3,"net_car":0},"description":"Enlargement of the existing basement, including the installation of a front lightwell and a rear lightwell with an external access staircase to the house"}