{"actual_commencement_date":null,"date_building_work_completed_under_previous_permission":null,"lpa_name":"Hounslow","subdivision_of_building":"Existing garages to be demolished.","appeal_decision":null,"lapsed_date":"15/11/2029","appeal_decision_date":null,"last_updated_by":"Northgate M3","reference_no_of_permission_being_relied_on":null,"epc_number":null,"last_updated":"2026-11-16T17:10:19.592Z","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0729","street_name":"Homefield Road","parking_details":{"no_existing_resi_offstreet":0,"net_resi_offstreet":1,"no_proposed_resi_offstreet":1},"ward":"Chiswick Homefields","bo_system":"Northgate M3","site_name":"Land Adjacent 2","site_number":null,"application_details":{"site_area":0.02,"total_gia_existing":73,"ownership_status":"Private","phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"08/2026","intended_completion_date":"08/2027"}],"garden_land_lost":false,"total_gia_gained":244.7,"existing_proposed_floorspace_details":[{"gia_existing":73,"use_class":"SpecifiedOther","gia_gained":0,"gia_lost":73},{"gia_existing":0,"use_class":"C3","gia_gained":244.7,"gia_lost":0}],"green_suds":false,"scheme_phasing":true,"infrastructure_details":{"no_homes_passive_cooling":1,"no_homes_to_have_electrical_heating":1,"chp_heat_pumps_capacity":0.01,"total_annual_pm_emissions":0,"no_new_water_connections_required":1,"waste_provision":true,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"no_resi_units_to_have_full_fibre":1,"percentage_demolition_construction_material_recycling":0,"green_roof_area":0,"mobile_network_operators_consultation":false,"ghg_reduction_over_building_regulations":true,"no_passive_fast_ev_charging_points":0,"fire_suppression_system_proposed":true,"total_annual_nox_emissions":0,"no_active_fast_ev_charging_points":1,"urban_greening_factor_score":0},"rain_water_harvesting":true,"projected_cost_of_works":"Up to £2m","building_details":[{"no_storeys":2,"max_height":11.94,"building_ref":"Main building"}],"internal_resi_water_usage":105,"residential_details":{"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_bedrooms":3,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_shared_equity":0,"total_no_existing_residential_affordable_units":0,"total_no_proposed_residential_units_london_affordable_rent":0,"affordable_percentage":100.0,"dwelling_density":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_intermediate":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_london_living_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units":0,"total_no_existing_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":1,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_proposed_residential_units_social_rent":0,"total_no_proposed_residential_affordable_units":1,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_market_for_rent":0,"total_gia_gained":247,"total_no_existing_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units":1,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_starter_homes":0,"total_gia_lost":0,"total_no_proposed_residential_units_affordable_rent":0,"residential_units":[{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","no_bedrooms":3,"unit_type":"House or Bungalow","gia":247,"tenure":"Self-Build and Custom Build"}]},"non_residential_details":{"total_gia_existing":73,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":73,"total_gia_gained":244.7,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":73,"surface_water_discharge_percentage_reduction":0,"occupation_status":"Vacant"},"uprn":"10097427943","locality":"London","date_building_work_started_under_previous_permission":null,"postcode":null,"valid_date":"04/03/2026","cil_liability":false,"actual_completion_date":null,"centroid":{"lat":51.49256,"lon":-0.249957},"centroid_easting":521591.0,"application_type_full":"Full planning permission","pp_id":"14704557","lpa_app_no":"P/2026/0729","polygon":{"geometries":[{"coordinates":[[[521589.669938,178510.525785],[521595.119664,178511.625136],[521594.719947,178513.875398],[521594.319728,178516.175718],[521593.869552,178519.025611],[521593.469935,178521.475042],[521592.919719,178524.325882],[521592.419968,178526.925355],[521587.219388,178526.125702],[521581.99876,178525.380096],[521579.169725,178524.975365],[521579.4700619999,178522.175299],[521580.770055,178513.675592],[521581.3696130001,178509.22592299996],[521587.119816,178510.07542],[521588.918801,178510.393233],[521589.669938,178510.525785]]],"type":"Polygon"}],"type":"geometrycollection"},"id":"Hounslow-P_2026_0729","appeal_status":null,"appeal_start_date":null,"description":"Erection of a detached two storey house with basement, landscaping, ASHP, car and cycle parking following demolition of existing garages","development_type":"Minor dwellings","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [Cover letter dated on 3 March 2026, Planning Statement and Technical Note 01 Biodiversity Net Gain. Received: 04/03/2026\r\nDesign and Access Statement and Planning Compliance Report 31959.PCR.01 RevB. Received: 08/05/2026\r\nFire Advice Note. Received: 15/05/2026\r\nGroundwater Assessment for Planning June 2026 96360-UrbaneLndn-ChiswickHghRd, Sequential and Exception Test June 2026 ST 96360-UrbaneLndn-ChiswickHghRd-v1.0-181225 and Drainage Assessment Form. Received: 05/06/2026\r\nEnergy Statement. Received: 14/06/2026\r\n24001- GFA- X- ZZ- DR- A- 12201 -P.10 and 24001- GFA- X- ZZ- DR- A- 12202 -P.10. Received: 18/09/2026\r\n24001- GFA- X- ZZ- DR- A- 10000 -P.09, 24001- GFA- X- ZZ- DR- A- 10001 -P.05, 24001- GFA- X- 00- DR- A- 11100 -P.01, 24001- GFA- X- ZZ- DR- A- 11600 -P.05, 24001- GFA- X- ZZ- DR- A- 12100 -P.01, 24001- GFA- X- ZZ- DR- A- 12200 -P.12, 24001- GFA- X- ZZ- DR- A- 13201 -P.10, 24001- GFA- X- ZZ- DR- A- 13202 -P.09, Daylight and Sunlight Effects Report dated on 7 October 2026 and Internal Daylight and Sunlight Report dated on 7 October 2026. Received: 07/10/2026\r\n24001- GFA- X- LG- DR- A- 11204 -P.10, 24001- GFA- X- 00- DR- A- 11205 -P.10, 24001- GFA- X- 01- DR- A- 11206 -P.09 and 24001- GFA- X- RF- DR- A- 11207 -P.10. Received: 16/10/2026\r\nFlood Risk Assessment and Surface Water Drainage Strategy for Planning November 2026. Received: 13/11/2026].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development above ground level shall take place until full details of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe details shall include: \r\n(a)\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond;\r\n(b)\tCladding materials / render (including specifications where relevant);\r\n(c)\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies;\r\n(d)\tWindow types; and sectional drawings of reveals / sills / head details \r\n(e)\tBalustrading treatment to balconies and roof areas, where relevant (including details / sections / materials); and handrails\r\n(f)\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate\r\nThe development shall then be carried out in accordance with the approved details and maintained as such thereafter.\r\nReason: In order to protect the appearance of the area\r\n","Condition : 4 - The roof area of the extension hereby permitted shall not be used as a balcony, roof garden or similar amenity area. It should only be accessed for maintenance purpose. \r\nReason: In order to protect neighbours' privacy\r\n","Condition : 5 - The basement hereby permitted shall at no time be used or occupied as a separate dwelling independent of the main house and shall not be used as sleeping accommodation.\r\nReason: In order to ensure that adequate living standards are maintained and to protect neighbours' living conditions.\r\n","Condition : 6 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the building(s) hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the local planning authority.\r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site. \r\n","Condition : 7 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 8 - No development shall take place until a Construction Method Statement (CMS) relating to the basement hereby approved has been submitted to the Local Planning Authority. The CMS shall be certified by a qualified professional and give details of excavation, temporary works and construction techniques, including details of potential impacts on neighbouring land based on assessment of the geology and hydrology of the area. The approved CMS shall be adhered to throughout the construction period for the development.\r\nReason: In order to protect the living conditions of neighbouring residents, to minimise flood risk and to ensure highway safety is maintained.","Condition : 9 - Either side of the vehicle access hereby approved, visibility splay areas (the depth measured from the back of the footway and the widths outwards from the edges of the access, with a splay of at least 2.4 metres x 2.4 metres) shall be provided before the access and parking area is brought into use.  These areas shall be kept clear of any obstructions to visibility greater than 600 mm in height, including shrubs, planting, boundary walls, fences, gates, other means of enclosure or other structures or objects at all times.\r\nReason:  To ensure adequate visibility for drivers entering and leaving the site in the interests of pedestrian and vehicle safety.","Condition : 10 - Before the development hereby permitted is first occupied or brought into use, full details of boundary treatment for the proposed development shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall indicate the positions, heights, design, materials and type of boundary treatment to be erected, and the boundary treatment shall be erected in accordance with the approved scheme and shall be retained as such thereafter. \r\nReason: In order to minimise danger, obstruction and inconvenience to users of the highway and of the access.","Condition : 11 - The cycle parking spaces shall be provided within the site in accordance with approved plan 24001- GFA- X- 00- DR- A- 11205 -P.10 for two bicycles to be parked before the development hereby permitted is first occupied or brought into use, and that space shall thereafter be kept available for the parking of bicycles; prior to commencement of the use.\r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 12 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.","Condition : 13 - Before the development hereby permitted is first occupied or brought into use, a Delivery & Servicing Plan (including details of vehicle access and egress arrangements and times that servicing shall take place) shall be submitted to and approved in writing by the Local Planning Authority. The details shall accord with current guidance such as that issued by TfL and include measures required to ensure sufficient arrangements (physical as well as managerial) for the servicing, including refuse collection, of all aspects of the development, the timing of hours for deliveries by motor vehicles and a timetable for implementation. The development shall not be carried out otherwise than in accordance with the approved details and shall be maintained for the lifetime of the development, unless the prior written approval of the local planning authority is obtained to any variation.\r\nReason: In the interests of the safety of pedestrians and vehicles, to protect neighbours' living conditions and to support sustainable transport objectives.","Condition : 14 - The ground floor landscape arrangement, including tree plantations, shall be carried out within the site in accordance with approved plan 24001- GFA- X- 00- DR- A- 11205 -P.10\r\nThe landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use.\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.\r\n","Condition : 15 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 16 - (A) No development above ground level shall take place until details have been submitted to and approved by the local planning authority which demonstrate that:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n(B) The development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the local planning authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition. The development shall be maintained in accordance with the approved details at all times thereafter.\r\nReason: In the interests of sustainable development.","Condition : 17 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 18 - All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases of the development hereby approved shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance (SPG) 'Control of Dust and Emissions During Construction and Demolition' dated July 2014, or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/.\r\nReason: In the interests of air quality and to protect neighbours' living conditions and the wider local environment.","Condition : 19 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 20 - The development shall be carried out in accordance with the approved Flood Risk Assessment and Surface Water Drainage Strategy for Planning November 2026.\r\nReason: To provide sustainable development and to prevent an increased risk of groundwater and surface water flooding.\r\n"],"last_synced":"2026-11-17T02:18:08.605Z","secondary_street_name":null,"title_number":null,"last_date_consultation_comments":"05/06/2026","decision_process":null,"centroid_northing":178520.0,"borough":"Hounslow","decision":"Approved","application_type":"All Other","wgs84_polygon":{"coordinates":[[[-0.24998,51.492475],[-0.249901,51.492483],[-0.249906,51.492504],[-0.249911,51.492525],[-0.249916,51.49255],[-0.249921,51.492572],[-0.249928,51.492598],[-0.249935,51.492622],[-0.25001,51.492615],[-0.250085,51.49261],[-0.250126,51.492607],[-0.250123,51.492582],[-0.250107,51.492505],[-0.2501,51.492465],[-0.250017,51.492471],[-0.249991,51.492474],[-0.24998,51.492475]]],"type":"Polygon"},"decision_agency":"Borough","decision_target_date":"24/11/2026","status":"Approved","decision_date":"16/11/2026"}