{"actual_completion_date":null,"appeal_start_date":"11/09/2026","application_type_full":"Full planning & display of advertisements","decision_conditions":["Reason : 1 - The proposed communications hub, by reason of its siting within a busy section of the public footway, in close proximity to existing public seating, transport infrastructure and other similar advertising and communications structures, would result in an unnecessary and harmful addition to the streetscape. The cumulative impact of the development would create visual clutter, detract from the character and appearance of the area, and diminish the quality of the public realm and pedestrian environment. The proposal is therefore contrary to London Plan Policy D8 (Public Realm), Local Plan Policies CC1 (Context and Character), EC2 (Developing a Sustainable Local Transport Network) and CC5 (Advertisement Panels, Hoardings and Structures), and the aims of the National Planning Policy Framework.","Reason : 2 - The proposed communication hub, by reason of its excessive scale, siting and design within a heavily used section of the public footway and in close proximity to existing street furniture and crucial transport infrastructure, would introduce excessive street clutter and create an obstruction within the public realm. The development would adversely affect pedestrian movement, compromise the quality of the pedestrian environment, and fail to maintain adequate visibility for pedestrians and cyclists at a location characterised by high levels of footfall and transport activity associated with the nearby shopping parade, transport and highway provisions. The development would therefore result in unacceptable harm to pedestrian and highway safety and be contrary to Local Plan Policy EC2 (Developing a Sustainable Local Transport Network) and Policy CC5 (Advertisement Panels, Hoardings and Structures)."],"decision":"Refused","appeal_decision":null,"valid_date":"01/06/2026","description":"Installation of a double sided internally illuminated digital display on the proposed communications hub","status":"Appeal In Progress","last_updated_by":"Northgate M3","site_number":null,"cil_liability":false,"decision_process":null,"development_type":"Other advertisements","subdivision_of_building":"n/a","centroid_northing":0.0,"last_updated":"2026-09-11T14:00:10.127Z","lapsed_date":"27/07/2029","bo_system":"Northgate M3","centroid":{"lat":49.766807,"lon":-7.55716},"parking_details":null,"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0839","pp_id":"14760191","locality":null,"reference_no_of_permission_being_relied_on":null,"uprn":null,"ward":"Feltham West","last_synced":"2026-09-12T01:53:28.356Z","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"All","intended_completion_date":"06/2026","intended_commencement_date":"05/2026"}],"total_gia_gained":0,"site_area":0.1,"total_gia_existing":0,"total_gia_lost":0,"scheme_name":"BT Street Hub ","projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"scheme_phasing":true,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":0,"total_gia_lost":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public","lead_developer_company_name":"BT Telecommunications plc"},"street_name":null,"decision_agency":"Borough","appeal_decision_date":null,"site_name":null,"last_date_consultation_comments":"08/06/2026","secondary_street_name":null,"lpa_name":"Hounslow","title_number":null,"epc_number":null,"decision_date":"27/07/2026","wgs84_polygon":{"coordinates":[[[-0.410172,51.446198],[-0.410235,51.446116],[-0.410173,51.4461],[-0.410124,51.446187],[-0.410172,51.446198]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"27/07/2026","postcode":null,"appeal_status":null,"polygon":{"geometries":[{"coordinates":[[[510580.91143366345,173110.56922745943],[510576.74996265804,173101.4044732573],[510581.05014936137,173099.73815431027],[510584.2406104657,173109.4583481588],[510580.91143366345,173110.56922745943]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":0.0,"date_building_work_completed_under_previous_permission":null,"borough":"Hounslow","id":"Hounslow-P_2026_0839","application_type":"All Other","lpa_app_no":"P/2026/0839","actual_commencement_date":null}