{"site_name":null,"lapsed_date":"14/06/2029","appeal_decision":null,"decision_agency":"Borough","last_synced":"2026-06-29T02:12:10.825Z","bo_system":"Northgate M3","lpa_app_no":"P/2026/0990","valid_date":"20/04/2026","title_number":null,"epc_number":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire development single phase","intended_completion_date":"01/2027","intended_commencement_date":"06/2026"}],"total_gia_gained":71,"site_area":0.02,"total_gia_lost":0,"total_gia_existing":0,"existing_proposed_floorspace_details":[{"gia_existing":0,"gia_gained":71,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"building_details":[{"no_storeys":2,"max_height":8,"building_ref":"NEW BUILD TWO BEDROOM DWELLING"}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":15,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":71,"total_gia_lost":0,"total_gia_existing":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":1,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_passive_fast_ev_charging_points":1,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":25,"no_active_fast_ev_charging_points":1,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":120,"ownership_status":"Private"},"centroid_easting":511931,"decision_process":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.391374,51.43027],[-0.391402,51.43026],[-0.391408,51.430258],[-0.391523,51.430211],[-0.391538,51.430205],[-0.391568,51.430194],[-0.391565,51.430192],[-0.391535,51.430169],[-0.39151,51.430148],[-0.39147,51.430116],[-0.391219,51.430207],[-0.391197,51.430216],[-0.391172,51.430288],[-0.391217,51.430332],[-0.391286,51.430305],[-0.391374,51.43027]]]},"reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"decision_target_date":"17/06/2026","actual_commencement_date":null,"parking_details":{"no_existing_car":0,"net_car":1,"no_proposed_car":1},"last_date_consultation_comments":"21/05/2026","url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/0990","last_updated":"2026-06-28T16:34:00.507Z","application_type":"All Other","site_number":19,"lpa_name":"Hounslow","application_type_full":"Full planning permission","centroid_northing":171365,"actual_completion_date":null,"cil_liability":false,"subdivision_of_building":null,"decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [Location Plan (unnumbered), Proposed block plan (unnumbered), 19/CR/01, 19/CR/02, 19/CR/03, 19/CR/09, Design and Access Statement, Energy and Sustainability Statement, Fire Statement, Planning Statement, application form - Received 20/04/2026; 19/CR/04 - Received 04/06/2026; 19/CR/06, 19/CR/07, 19/CR/08- Received 08/06/2026; 19/CR/05, BNG Assessment and Metric - Received 15/06/2026].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building, unless otherwise shown on the approved plans.\r\nReason: In order to safeguard the appearance of the area.","Condition : 4 - The roof area of the ground floor extension within the existing and proposed dwellings hereby permitted shall not be used as a balcony, roof garden or similar amenity area.\r\nReason: In order to protect neighbours' privacy\r\n","Condition : 5 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage within the curtilage of both the existing and proposed dwellings hereby permitted shall be carried out , other than as shown in the approved drawings, and no additional floor space shall be formed within the building(s) hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the local planning authority.\r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site. \r\n","Condition : 6 - All rainwater pipes, gutters, and associated fittings serving the existing and proposed dwellings hereby permitted shall be retained and thereafter maintained within the respective curtilage of each property. At no time shall any such features be positioned so as to discharge onto, overhang, or encroach upon adjoining land.\r\nReason:\r\nTo ensure that drainage arrangements are appropriately contained within the site, to safeguard neighbouring amenity, and to prevent any adverse impacts arising from surface water run-off, in accordance with good planning practice.\r\n","Condition : 7 - a)\tNotwithstanding the submitted details, no development  pertaining to the new dwelling hereby approved (except any demolition, site clearance, ground investigation and remediation work) shall take place until a finalised Energy Strategy (demonstrating how the targets for carbon dioxide emissions reduction are to be met in line with the Mayor's energy hierarchy) has been submitted to and approved in writing by the local planning authority.\r\nb)\tPrior to first occupation of the new dwelling hereby approved, the relevant evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions.\r\n\r\nc)\tPrior to first occupation of the new dwelling hereby approved, where a contribution is found necessary to achieve compliance with zero-carbon requirements of the Development Plan, the developer shall have entered into a binding agreement with the Local Planning Authority to pay any carbon offset contribution at the published rate in-force at the time of submitting details pursuant to Part A of this condition. \r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.\r\n","Condition : 8 - (A) No development  above ground level (new dwelling only) shall take place until details have been submitted to and approved by the local planning authority which demonstrate that:\r\n(i)\tAt least three of the key elements of the building envelope (external walls, windows roof, upper floor slabs, internal walls, floor finishes/coverings) are to achieve a rating of A+ to D in the Building Research Establishment (BRE) The Green Guide of specification.\r\n(ii)\tAt least 50% of timber and timber products are to be sourced from accredited Forest Stewardship Council (FSC) or Programme for the Endorsement of Forestry Certification (PEFC) scheme.\r\n(iii)\tNo construction or insulation materials are to be used which would release toxins into the internal and external environment, including those that deplete stratospheric ozone.\r\n(B) The development shall not be occupied until evidence (e.g. photographs and copies of installation contracts) has been submitted to the local planning authority to demonstrate that the development has been carried out in accordance with the approved details under Part A of this condition. The development shall be maintained in accordance with the approved details at all times thereafter.\r\nReason: In the interests of sustainable development.","Condition : 9 - Prior to first occupation of the new dwelling hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 10 - Notwithstanding any details included in the submitted plans, no development above ground level (except any demolition, site clearance, ground investigation and remediation work) shall take place until: \r\na)\tfinalised details of both hard and soft landscape works have been submitted to and approved in writing by the local planning authority. These details shall include a statement setting out the design objectives and how these will be delivered;\r\nb)\tplanting plans, written specifications (including cultivation and other operations associated with plant and grass establishment); schedules of plants, noting species, plant sizes and proposed numbers and densities where appropriate; \r\nc)\tan implementation programme (including phasing of work where relevant). The landscaping works shall comply with the requirements specified in BS 3936 (1992) 'Specification of Nursery Stock Part 1 Trees and Shrubs', and in BS 4428 (1989) 'Recommendations for General Landscape Operations', and shall be carried out in accordance with the approved details before the development hereby permitted is first occupied or brought into use, or such other date(s) as may be specified in the agreed implementation programme.\r\nd)\tmeans of enclosure/boundary treatment(s) and retaining structures; \r\ne)\tvehicle parking, cycle parking stores (as per West London Cycle Paring Guidance), bins stores (as per LBH Recycling and Refuse Guidance), other vehicle and pedestrian access and circulation areas for both the existing and proposed dwelling as appropriate\r\nReason: In order to ensure a satisfactory appearance of the site, surrounding area and to promote biodiversity.\r\n","Condition : 11 - Prior to the first commencement of the hereby approved development, a Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority, the Plan shall include;\r\n(a) information about the steps taken or to be taken to minimise the adverse effect of the development on the biodiversity of the onsite habitat and any other habitat,\r\n(b) the pre-development biodiversity value of the onsite habitat,\r\n(c) the post-development biodiversity value of the onsite habitat,\r\n(d) any registered offsite biodiversity gain allocated to the development and the biodiversity value of that gain in relation to the development,\r\n(e) any biodiversity credits purchased for the development, and\r\n(f) such other matters as the Secretary of State may by regulations specify.\r\nThe development shall thereafter be carried out in accordance with the approved Plan prior to the first occupation of the development. Any habitats created or enhanced on-site and off-site in accordance with the Biodiversity Gain Plan must be maintained thereafter for a minimum of 30 years.\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.","Condition : 12 - A) Prior to the first commencement of the hereby approved development a Habitat Management and Monitoring Plan (HMMP) prepared in accordance with the approved Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include:\r\n(i) a non-technical summary;\r\n(ii) the roles and responsibilities of the people or organisation(s) delivering the HMMP\r\n(iii) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;\r\n(iv) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and \r\n(v) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. \r\n\r\nB) No occupation or use of the hereby approved development shall take place until:\r\n(i) the habitat creation and enhancement works set out in the approved HMMP have been completed; and \r\n(ii) a completion report, evidencing the completed habitat enhancements, has been submitted to, and approved in writing by the Local Planning Authority. \r\nThe created and/or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP.\r\n\r\nC) Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved HMMP.\r\n\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.\r\n","Condition : 13 - Prior to the first use or occupation of the new dwelling hereby approved, full details (including manufacturers' specifications) of secure covered cycle parking facilities that accord with the West London Cycle Parking Guidance for the occupants of, and visitors to, the development hereby approved shall be submitted to and approved in writing by the Local Planning Authority. The approved facilities shall be fully implemented and made available for use before the development is first occupied or brought into use, The approved facilities shall be thereafter retained for use at all times without obstruction. \r\nReason: In order to support sustainable transport objectives.\r\n","Condition : 14 - Either side of the vehicle access hereby approved, visibility splay areas (the depth measured from the back of the footway and the widths outwards from the edges of the access, with a splay of at least 2.4 metres x 2.4 metres) shall be provided before the access and parking area is brought into use.  These areas shall be kept clear of any obstructions to visibility greater than 600 mm in height, including shrubs, planting, boundary walls, fences, gates, other means of enclosure or other structures or objects at all times.\r\nReason:  To ensure adequate visibility for drivers entering and leaving the site in the interests of pedestrian and vehicle safety.","Condition : 15 - No development above ground level shall take place until full details of the Electric Vehicle Charging Points, each capable of  a minimum output of 7.2kW, are submitted to and approved in writing by the Local Planning Authority. The details shall include manufacturer's specifications and the number of spaces provided with active and passive capabilities shall comply with the London Plan standards.\r\nThe charging points shall be installed in accordance with the approved details, with photographic evidence submitted to the Local Planning Authority upon completion, and so maintained at all times thereafter.\r\nReason: In order to promote sustainable modes of transport.","Condition : 16 - Before the new dwelling hereby approved is first occupied, the developer shall provide to each dwelling a set of containers required at the time of development for household use for the storage and collection of recyclable materials for the purposes of the Council's kerbside recycling service, to the specification then in use by the local authority's recycling collection service and shall notify the Council's refuse and recycling services when the development is first occupied.  The waste and recyclable materials containers shall be stored in a proprietary refuse bin enclosure designed for the purpose to be supplied by the developer and located adjacent to each dwelling. Each dwelling with a private garden shall also be supplied with a garden waste composting bin of at least 220 litres capacity at the same time.\r\nReason: In order to protect the quality of the local environment and neighbours' living conditions and to endure appropriate means of refuse storage are provided.","Condition : 17 - Prior to commencement of groundworks (excluding site investigations and demolition), the applicant shall have submitted to the local planning authority for approval in writing a final detailed drainage design, including drawings and supporting calculations [and an updated Drainage Assessment Form to be reviewed and approved by the Lead Local Flood Authority], aligned with the [add in date and name of main drainage document(s)] and associated material hereby approved. A detailed management plan confirming routine maintenance tasks for all drainage components shall also be submitted and approved which demonstrates how the drainage system is to be maintained for the lifetime of the development. The development shall be carried out in strict compliance with the approved details.\r\nReason: In order to prevent the risk of flooding to and from the site.","Condition : 18 - No part of the development hereby approved shall be occupied until evidence (photographs and copies of installation contracts, along with a written confirmation) has been submitted to the local planning authority and approved in writing to demonstrate that the sustainable drainage scheme hereby approved has been completed in accordance with the submitted final detailed drainage designs. The sustainable drainage scheme shall be managed and maintained thereafter in accordance with the agreed management and maintenance plan for all of the proposed drainage components.\r\nReason: In order to ensure that the methods to mitigate the risk of surface water flooding have been implemented as agreed and that the drainage system is suitably managed."],"uprn":100021520610,"centroid":{"lon":-0.391304,"lat":51.430244},"date_building_work_completed_under_previous_permission":null,"borough":"Hounslow","postcode":"TW13 6TE","date_building_work_started_under_previous_permission":null,"description":"PROPOSED NEW BUILD DWELLING A TWO STOREY TWO BEDROOM HOUSE AND A SINGLE STOREY REAR EXTENSION TO THE EXISTING HOUSE","last_updated_by":"Planning Portal ingest","ward":"Hanworth Village","street_name":"Conway Road","development_type":"Minor dwellings","decision_date":"15/06/2026","appeal_status":null,"appeal_decision_date":null,"polygon":{"geometries":[{"coordinates":[[[511926.1,171367.85],[511924.138,171366.64],[511923.75,171366.4],[511915.826,171361.058],[511914.85,171360.4],[511912.8,171359.05],[511913.011,171358.804],[511915.15,171356.3],[511916.95,171354.05],[511919.8,171350.5],[511937,171361.05],[511938.5,171362.05],[511940.05,171370.15],[511936.85,171375],[511932.1,171371.85],[511926.1,171367.85]]],"type":"Polygon"}],"type":"GeometryCollection"},"secondary_street_name":null,"locality":"Feltham","id":"Hounslow-P_2026_0990","pp_id":"14725449","status":"Approved","decision":"Approved"}