{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Full planning permission","decision_conditions":["Condition : 1 - The development hereby permitted shall begin not later than three years from the date of this decision.\r\nReason: In order to comply with Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.","Condition : 2 - The development hereby permitted shall be carried out in accordance with the following approved plans and specifications: [Biodiversity Net Gain Assessment, 635 D03.01 Design and Access Statement, 635 L01.03, 635 D01.02 Fire Safety Strategy, Flood Risk Assessment and Drainage Strategy V1, External Building Fabric and Vibration Report, 635 L00.02, Ecological Impact Assessment, Planning Statement, Daylight, Sunlight and Overshadowing Assessment, H4672 Daylight Assessment Drawings v2, Arboricultural Impact Assessment and Preliminary Method Statement, Suds proforma received 22/05/2026\r\nHeritage Statement received 23/06/2026\r\nFlood Sequential and Exception Test Report received 20/07/2026\r\nSRC-RGP-XX-XX-DR-T-001 P02 received 15/09/2026  \r\n635 L13.10 received 28/09/2026\r\n635 L11 08, 635 L12.12 received 13/10/2026].\r\nReason: In order to ensure the development is carried out in accordance with the planning permission.","Condition : 3 - No development above ground level shall take place until full details and samples of all materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved in writing by the local planning authority. Details must include a detailed schedule of materials, a photographic sample board and rendered drawings, elevations and sections at a sufficient scale (1:20 or 1:50) to illustrate how all external materials will appear together.\r\nThe [samples/details] shall include: \r\n(a)\tBrick/stonework (including brick, stone, masonry, brick panels, feature brick panel, brick framing feature and mortar on-site sample panel, minimum one metre by one metre) including all mortar colours, joint type, brick bond;\r\n(b)\tCladding materials / render (including specifications where relevant);\r\n(c)\tTiles / roof covering; including parapet coping / capping materials, dormers and canopies;\r\n(d)\tWindow types; and sectional drawings of reveals / sills / head details \r\n(e)\tBalcony details (including soffits, panels and frame);\r\n(f)\tAll privacy measures (including obscure glazing details, privacy screens etc.);\r\n(g)\tBalustrading treatment to balconies and roof areas (including details / sections / materials); and handrails\r\n(h)\tAny other materials/details / fittings to be used (including solar panels, extract vents, rainwater goods, boiler flues etc.), with sections and on-site samples where appropriate\r\n(i)\tBalustrading treatment (including details / sections / materials); and\r\n(j)\tAny other materials / details / fittings to be used (including solar panels, extract vents, boiler flues etc.), with sections and on-site samples where appropriate\r\nThe development shall then be carried out in accordance with the approved details and maintained as such.\r\nReason.  In order to protect the appearance of the area thereafter.\r\n","Condition : 4 - Notwithstanding the provisions of the Town and Country Planning (General Permitted Development Order) 1995 (or any order revoking or re-enacting that order), no enlargement of the premises or any additional structures/buildings/enclosures within the curtilage of the site shall be carried out, other than as shown in the approved drawings, and no additional floor space shall be formed within the building(s) hereby permitted by means of internal horizontal division (new mezzanine level) without prior written approval of the local planning authority.\r\nReason:  To protect neighbours' living conditions and the character and appearance of the area and to prevent over-intensive use of the site. \r\n","Condition : 5 - Before the development hereby permitted is first occupied or brought into use, the existing vehicular access shall be permanently closed and kerbs reinstated so that it cannot be used as an access across the pavement.\r\nReason: In order to enhance the pedestrian environment and to confine vehicular access to the permitted points in order to ensure that the development does not prejudice the free flow of traffic or highway safety along the adjacent highway.","Condition : 6 - No development (except any demolition, site clearance, ground investigation and remediation work) shall take place until full details of the arrangements for the storing of waste and recycled materials (including details of how the placing of waste and recycled materials in a suitable location for collection would be undertaken and managed) have been submitted to and approved in writing by the local planning authority. The development shall not be carried out otherwise than in accordance with the approved details.\r\nReason: In order to ensure adequate provision for waste and recycling.","Condition : 7 - Before any works above ground level take place, a plan indicating the positions, design, materials and type of boundary treatment to be erected shall be submitted to and approved by the local planning authority; the boundary treatment shall be erected as approved before the development is first brought into use and retained as such thereafter.\r\nReason: In order to protect neighbours' living conditions and to ensure a satisfactory appearance of the site and area.","Condition : 8 - No dwellinghouse shall be occupied until space has been laid out within the site in accordance with approved plan no.635 L11 08, 635 L12.12  for four bicycles to be parked and that space shall thereafter be kept available for the parking of bicycles.\r\nReason: In order to support sustainable transport objectives.","Condition : 9 - a) The development hereby permitted shall be implemented in accordance with the approved Energy Strategy.\r\n(b) Prior to first occupation of any dwelling within the development hereby approved evidence (e.g. photographs, installation contracts and As-Built certificates under the Standard Assessment Procedure/National Calculation Method) shall be submitted to the local planning authority and approved in writing to show that the development has been constructed in accordance with the approved Energy Strategy, and any subsequent approved revisions, and achieved a �% reduction in emissions.\r\n(c) Upon final commencement of operation of any low and zero carbon technologies, suitable devices for the monitoring of the low and zero carbon technologies shall have been installed, and the monitored data shall be submitted automatically to a monitoring web-platform at daily intervals for a period of three years from the point of full operation. The data shall be made available to the local planning authority on request for a period of five years.\r\nReason: In order to ensure that the development makes the fullest contribution to minimising carbon dioxide emissions.","Condition : 10 - No development shall take place until the applicant has entered into a binding arrangement with the Council to make an agreed contribution to the Council's Carbon Offset Fund, in accordance with the zero carbon strategy set out in the Energy Statement hereby approved to an amount that equates to the shortfall in required energy savings to meet the 'zero carbon' target.\r\nReason: In order to ensure the development meets sustainability standards. ","Condition : 11 - Prior to first occupation of the building(s) hereby approved, the development shall have been constructed to achieve an internal water use of 105 litres/person/day or less.\r\nReason: In order to protect and conserve water supplies and resources.","Condition : 12 - No development shall take place until a Construction Logistics Plan (CLP), written in accordance with current TfL guidance, has been submitted to and approved in writing by the Local Planning Authority. The CLP shall include: [delete or add items as necessary]\r\n(a)\ta site plan (showing the elements set out below);\r\n(b)\tconfirmation that a pre-start record of site conditions on the adjoining public highway will be undertaken with Hounslow Highways and a commitment to repair any damage caused;\r\n(c)\tprovision for the parking of vehicles of site operatives and visitors;\r\n(d)\tprovisions for loading, unloading and storage of plant and materials within the site;\r\n(e)\tdetails of access to the site, including means to control and manage access and egress of vehicles to and from the site for the duration of construction including phasing arrangements;\r\n(f)\tdetails of vehicle routeing from the site to the wider strategic road network;\r\n(g)\tthe erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;\r\n(h)\tprovision of wheel washing facilities at the site exit and a commitment to sweep adjacent roads when required and at the request of the Council;\r\n(i)\ta scheme for recycling/disposing of waste resulting from demolition and construction works; \r\n(j)\tmeasures to ensure the safety of all users of the public highway especially cyclists and pedestrians in the vicinity of the site and especially at the access;\r\n(k)\tcommitment to liaise with other contractors in the vicinity of the site to maximise the potential for consolidation and to minimise traffic impacts;\r\n(l)\tno deliveries before 9.30am and after 3pm to avoid school opening and closing times and peak hours, unless otherwise agreed in advance with the council and details of a booking system to avoid vehicles waiting on the public highway;\r\n(m)\tall necessary traffic orders and other permissions required to allow safe access to the site to be secured and imp","Condition : 13 - During works, an appropriate wheel-washing system shall be operated to remove mud, stones and other extraneous materials from vehicle wheels and chassis' leaving the site, and all departing loads shall be fully covered to ensure no material is deposited on the highway. The exit from the wheel wash shall be a hard, non-porous surface sited as far away from the exit as is possible given the site constraints and kept clean at all times.  Waste water discharged from the wheel wash shall be stored and disposed of on site and not discharged into the public sewer unless soil, stones and any suspended material have first been removed.\r\nThe developer shall ensure that no dust or other debris is carried on to adjoining properties in accordance with the guidance at https://www.london.gov.uk/file/18750/download?token=zV3ZKTpP. \r\nSite lighting shall be designed, positioned and directed so as not to unnecessarily intrude on passing drivers or direct light into any neighbouring windows in accordance with the guidance provided by the Institute of Lighting Engineers Guidance Note: For The Reduction Of Obtrusive Light 2021.\r\nAll vehicle arrivals and departures shall be supervised and the condition of the highway examined immediately afterwards.  Any materials shed from the vehicle during such movement shall be immediately removed from the highway, and returned to site or carted away for disposal and shall not be washed into the surface water drainage system.\r\nReason: In order to protect neighbours' living conditions and in the interests of highway safety\r\nNotes:\r\nFor the wheel washing system above, the preferred distance between it and the exit to the highway is 100 metres if this is practicable.\r\nIf site staff are instructed by a Council Officer to stop vehicle movements to and from the site if any incidents occur, they must comply with the instructions.  For any further advice, contact the Council's Community Environment Team on 020 8583 5070.","Condition : 14 - No development shall be carried out until such time as the person carrying out the work is a member of the Considerate Constructors Scheme and its code of practice, and the details of the membership and contact details are clearly displayed on the site so that they can be easily read by members of the public. \r\nReason: In order to protect the living conditions of neighbouring residents.","Condition : 15 - Before the development hereby permitted is first occupied or brought into use, the Local Planning Authority shall be informed of the agreed naming and numbering of the proposed dwellings so that arrangements can be put in place to ensure that, with the exception of a person eligible for a disabled person's badge issued pursuant to section 21 of the Chronically Sick and Disabled Persons Act 1970 (or similar legislation), no resident of the development shall obtain a resident's parking permit. Any occupiers of the approved development shall surrender any such permit wrongly issued or held.\r\nReason: In order to protect the free flow and safety of traffic on nearby highways and to support sustainable transport objectives.","Condition : 16 - (A)The noise level in rooms at the development hereby approved shall meet the noise standard specified in Table 4 of British Standard 8233:2014 [Living Rooms = 35 dB LAeq, 16 hours; Dining Room/Area = 40 dB LAeq, 16 hours; Bedroom = 35 dB LAeq, 16 hours during day-time (07:00 - 23:00) and Bedroom = 30 dB LAeq, 8 hours during night-time (23:00 - 07:00)], or any equivalent standards if replaced.\r\nB)\tBefore the development hereby permitted is first occupied or brought into use, post-completion noise tests shall be carried out by accredited/approved organisations with competence in environmental noise assessments for residential accommodation and test reports shall be submitted to and approved in writing by the local planning authority. Noise tests shall be carried out taking account of worst-case environmental noise conditions, such as peak time traffic flows and railway movements; Continuous logged data shall be submitted. \r\nReason: In order to secure acceptable living conditions for residents of the new dwellings.","Condition : 17 - All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases of the development hereby approved shall comply with the emission standards set out in chapter 7 of the GLA's supplementary planning guidance (SPG) 'Control of Dust and Emissions During Construction and Demolition' dated July 2014, or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/.\r\nReason: In the interests of air quality and to protect neighbours' living conditions and the wider local environment.","Condition : 18 - a) The cumulative measured or calculated rating level of noise emitted from the mechanical services plant including heating, ventilation and air conditioning (HVAC) to which this permission refers, shall be 10dB(A) below the existing background noise level, at all times that the plant operate. The measured or calculated noise levels shall be determined at the boundary of the nearest ground floor noise sensitive premises or one metre from the facade of the nearest first floor (or higher) noise sensitive premises, and in accordance to the latest British Standard 4142. An alternative position for assessment/measurement may be used to allow ease of access, this must be shown on a map and noise propagation calculations detailed to show how the design criteria are achieved. \r\n\r\nb) The plant shall be isolated on adequate proprietary anti-vibration mounts to prevent the structural transmission of vibration and regenerated noise within adjacent or adjoining premises, and these shall be so maintained thereafter.   \r\n\r\nc) Following installation of any mechanical services plant including heating, ventilation and air conditioning (HVAC) to which the application refers, a post completion noise assessment shall be submitted for approval to the local planning authority which demonstrates the actual measured rating level of plant operating under normal conditions. All measurements shall be made in accordance with the methodology of BS4142: 2014 (Methods for rating and assessing industrial and commercial sound) and/or its subsequent amendments. The post completion report shall be both completed and submitted to the local authority within 28 days of completion of the installation for review. If the plant fails to meet the specified standard, remedial measures shall be put in place immediately and the noise assessment shall be carried out again.  This shall be repeated until the assessment has reached the required standard.  Once achieved, the plant shall be maintained permanently ther","Condition : 19 - Prior to first occupation of the development, a System 4 mechanical ventilation system incorporating Mechanical Ventilation with Heat Recovery (MVHR) to allow continuous whole-house mechanical ventilation shall be installed and thereafter retained and maintained in accordance with the manufacturer's specifications. \r\nReason: In order to protect internal residential amenity. \r\n","Condition : 20 - The trees that are specified on the drawings and Arboricultural assessment hereby approved to be retained shall be protected before commencement of any works on site and throughout the course of the development by methods that conform to the best practice guidance contained in British Standard BS5837: 2012 or any guidance that shall have superseded it\r\nReason: In order to ensure a satisfactory appearance of the site and the area and to promote biodiversity.","Condition : 21 - No development shall take place until a detailed Demolition, Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall be accompanied by details of how demolition and construction work for that phase are to be undertaken and include:\r\na)\tThe identification of stages of works;\r\nb)\tDetails of working hours, which unless otherwise agreed with the Local Planning Authority shall be limited to 08.00 to 18.00 Monday to Friday and 08.00 to 13.00 on Saturdays);\r\nc)\tProcedures for maintaining good public relations including complaint management, public consultation and liaison;\r\nd)\tMitigation measures as defined in BS 5228: Parts 1 and 2: 2009 Noise and Vibration Control on Construction and Open Sites shall be used to minimise noise disturbance construction works.\r\n\r\n(a)\tA Site Waste Management Strategy identifying all waste streams arising from the demolition and construction phases, including measures for waste minimisation, segregation, storage, recycling, recovery, transportation and disposal;\r\n\r\n(b)\tA comprehensive asbestos survey (including any Refurbishment and Demolition Asbestos Survey, where required) undertaken by a suitably qualified and competent person. The survey shall identify the presence, extent and condition of any asbestos-containing materials and shall include details of the measures necessary for their safe removal, handling, transportation and disposal in accordance with relevant legislation and guidance;\r\n\r\n(c)\tCopies of demolition and waste disposal contracts, or details of the appointed contractors and disposal facilities, demonstrating how demolition arisings, hazardous materials and asbestos-containing materials will be managed and lawfully disposed of at appropriately licensed facilities.\r\n\r\n(d)\tWhere the asbestos survey or associated investigations identify hazardous materials requiring remediation or special handling, details of the proposed remediation, ma","Condition : 22 - A) Prior to the first commencement of the hereby approved development a Habitat Management and Monitoring Plan (HMMP) prepared in accordance with the approved Biodiversity Gain Plan shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall include:\r\n(i) a non-technical summary;\r\n(ii) the roles and responsibilities of the people or organisation(s) delivering the HMMP\r\n(iii) the planned habitat creation and enhancement works to create or improve habitat to achieve the biodiversity net gain in accordance with the approved Biodiversity Gain Plan;\r\n(iv) the management measures to maintain habitat in accordance with the approved Biodiversity Gain Plan for a period of 30 years from the completion of development; and \r\n(v) the monitoring methodology and frequency in respect of the created or enhanced habitat to be submitted to the local planning authority. \r\n\r\nB) No occupation or use of the hereby approved development shall take place until:\r\n(i) the habitat creation and enhancement works set out in the approved HMMP have been completed; and \r\n(ii) a completion report, evidencing the completed habitat enhancements, has been submitted to, and approved in writing by the Local Planning Authority. \r\nThe created and/or enhanced habitat specified in the approved HMMP shall be managed and maintained in accordance with the approved HMMP.\r\n\r\nC) Monitoring reports shall be submitted to the Local Planning Authority in writing in accordance with the methodology and frequency specified in the approved HMMP.\r\n\r\nReason. In the interests of improving Biodiversity and in accordance with The Town and Country Planning Act 1990, Section 90A, Schedule 7A.\r\n","Condition : 23 - Prior to the first occupation of the development hereby approved, the bird nesting boxes identified within the submitted Biodiversity Enhancement Report shall be installed on the building in accordance with the recommendations set out in that document and thereafter retained and maintained for the lifetime of the development.\r\nReason: To secure the biodiversity enhancements proposed as part of the development and to accord with the Council's biodiversity objectives.\r\n","Condition : 24 - Prior to the commencement of development, (excluding demolition and site clearance), details of the final design of a surface water drainage scheme shall be submitted to and approved in writing by the planning authority. The final solution should follow the principles set out in the approved drainage strategy. The design must satisfy the SuDS Hierarchy and be compliant with the National Standards for SuDS, NPPF and Ministerial Statement on SuDS. The required drainage details shall include: \r\na. Evidence that the receiving watercourse/surface water sewer has onward connectivity and capacity to receive flows from the site.\r\nb. Hydraulic calculations to demonstrate the proposed final solution will effectively manage the 1 in 30 (+30% allowance for climate change) 1 in 100 (+40% allowance for climate change) storm events and 10% allowance for urban creep. If infiltration is deemed unfeasible, associated discharge rates and storage volumes shall be provided using a maximum discharge rate of xx l/s.\r\nc. Detailed design drawings for all sustainable drainage elements including cross sections and detailed drainage layout plan.\r\nd. An exceedance flow routing plan demonstrating no increase in surface water flood risk on or off site. The plan must include proposed levels and flow directions.\r\ne. Details of drainage management responsibilities and maintenance regimes for all drainage elements.\r\nf. Details of how surface water will be managed during construction including measures to protect on site and downstream systems prior to the final drainage system being operational. Including details of how existing watercourse on and adjacent to the site will be protected.\r\nThe development shall be carried out in accordance with the agreed details and retained and maintained thereafter.\r\nReasons: To provide a sustainable development and to prevent an increased risk of flooding. \r\n","Condition : 25 - Prior to the first occupation of the development, a verification report shall be submitted to and approved by the Local Planning Authority. This must demonstrate that the surface water drainage system has been constructed as per the agreed scheme (or detail any minor variations), confirming any defects have been rectified. Provide the details of any management company. Provide an 'As-Built' drainage layout and state the national grid reference of key drainage elements.\r\n\r\nReason: To provide sustainable development and to prevent an increased risk of flooding. \r\n"],"decision":"Approved","appeal_decision":null,"valid_date":"22/05/2026","description":"Erection of two, two storey residential houses with associated landscaping, private amenity space, cycle storage and refuse storage following demolition of existing garages.","status":"Approved","last_updated_by":"Northgate M3","site_number":"14","cil_liability":true,"decision_process":null,"development_type":"Minor dwellings","subdivision_of_building":null,"centroid_northing":177165.0,"last_updated":"2026-11-03T16:30:25.124Z","lapsed_date":"29/10/2029","bo_system":"Northgate M3","centroid":{"lat":51.48065,"lon":-0.268473},"parking_details":{"no_existing_cycle":0,"no_proposed_cycle":4,"net_cycle":4},"url_planning_app":"https://planningandbuilding.hounslow.gov.uk/NECSWS/ES/Presentation/Planning/OnlinePlanning/OnlinePlanningOverview?applicationNumber=P/2026/1469","pp_id":"14899953","locality":"London","reference_no_of_permission_being_relied_on":null,"uprn":"200002114455","ward":"Chiswick Homefields","last_synced":"2026-11-04T02:51:23.611Z","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Construction","intended_commencement_date":"03/2027","intended_completion_date":"01/2028"}],"total_gia_gained":228,"site_area":0.031670000000000004,"total_gia_lost":55,"total_gia_existing":55,"existing_proposed_floorspace_details":[{"gia_existing":55,"use_class":"C3","gia_gained":228,"gia_lost":55}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"green_suds":true,"surface_water_discharge_percentage_reduction":8,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":228,"total_gia_lost":55,"total_gia_existing":55},"garden_land_lost":true,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":4,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":228,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","garden_land":true,"no_bedrooms":2,"unit_type":"Semi Detached Home","gia":114,"tenure":"Market for sale"},{"no_habitable_rooms":3,"provider":"Private","change_type":"Gain","garden_land":true,"no_bedrooms":2,"unit_type":"Semi Detached Home","gia":114,"tenure":"Market for sale"}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0,"total_gia_lost":0},"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":2,"green_roof_area":0,"urban_greening_factor_score":0.4,"solar_pv_capacity":0,"no_homes_passive_cooling":2,"no_new_water_connections_required":2,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":2,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"chp_heat_pumps_capacity":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":100,"ownership_status":"Private"},"street_name":"Spencer Road","decision_agency":"Borough","appeal_decision_date":null,"site_name":null,"last_date_consultation_comments":"25/06/2026","secondary_street_name":null,"lpa_name":"Hounslow","title_number":null,"epc_number":null,"decision_date":"30/10/2026","wgs84_polygon":{"coordinates":[[[-0.268274,51.480789],[-0.268174,51.480689],[-0.267852,51.480792],[-0.268011,51.480889],[-0.268089,51.480867],[-0.268151,51.480841],[-0.268217,51.480815],[-0.268274,51.480789]]],"type":"Polygon"},"date_building_work_started_under_previous_permission":null,"decision_target_date":"17/07/2026","postcode":null,"appeal_status":null,"polygon":{"geometries":[{"coordinates":[[[520350.4062499991,177180.7848994441],[520357.6249999998,177169.83946845884],[520379.7187500008,177181.87944254518],[520368.45312499994,177192.38705629413],[520363.0937500001,177189.76015285566],[520358.8281250009,177186.8048864908],[520354.34374999953,177183.84962012316],[520350.4062499991,177180.7848994441]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":520337.0,"date_building_work_completed_under_previous_permission":null,"borough":"Hounslow","id":"Hounslow-P_2026_1469","application_type":"All Other","lpa_app_no":"P/2026/1469","actual_commencement_date":null}