{"borough":"Islington","application_type":"All Other","decision":"Approved","decision_conditions":["INFORMATIVE: The wording of Condition 3 attached to planning permission ref: P2024/2412/S73, dated 04/12/2024, should now read as:\r\nCONDITION: The development hereby approved shall be carried out in accordance with the following approved drawings and information: \r\nPlans \r\nIllustrative Landscape Masterplan (Detailed and Outline), 732-FH-XX-00-DP-L-100, Rev. A \r\nGeneral Arrangement Plan, 845-FH-XX-00-DP-L-101 Rev.A \r\nDetailed Area Location Plan, 845-FH-XX-00-DP-L-110 Rev.B \r\nBlock A and Block B - Landscape Plan, 845-FH-XX-00-DP-L-111 Rev.D \r\nBlock C and Pultney Street Park - Landscape Plan, 732-FH-XX-00-DP-L-112, Rev. A \r\nBlock D and Carnegie Street Park- Landscape Plan, 732-FH-XX-00-DP-L-113, Rev. A \r\nBlock D Rooftop - Landscape Plan, 732-FH-XX-XX-DP-L-114, Rev. A \r\nProposed Level Plan, 845-FH-XX-00-DP-L-301 Rev.A \r\nBlock A and Block B - Proposed Level Plan, 845-FH-XX-00-DP-L-311 Rev.A \r\nBlock C and Pultney Street Park - Proposed Level Plan, 732-FH-XX-00-DP-L-312, Rev. B \r\nBlock D and Carnegie Street Park - Proposed Level Plan, 732-FH-XX-00-DP-L-313, Rev. B \r\nTree and Soft Landscape Plan, 845-FH-XX-00-DP-L-401 Rev.A \r\n\r\nDetails \r\nBlock A and Block B - Sections, 732-FH-XX-00-DT-L-111, Rev. A \r\nBlock C and Pultney Street Park- Sections, 732-FH-XX-00-DT-L-112, Rev. A \r\nBlock D and Carnegie Street Park - Sections, 732-FH-XX-00-DT-L-113, Rev. A \r\nTypical Tree Pit Details, 732-FH-XX-00-DT-L-401, Rev. A \r\n\r\nMasterplan \r\nGeneral \r\nSite Location Plan, BAE-PTE-ZZ-XX-DR-A-100001, Rev. C1 \r\nExisting Site Plan, BAE-PTE-ZZ-XX-DR-A-100002, Rev. C1\r\nNewlon Ownership Boundary Plan, BAE-PTE-ZZ-XX-DR-A-100003, Rev. C1 \r\nExisting Topographical Plan, BAE-PTE-ZZ-XX-DR-A-100004, Rev. C1 \r\nProposed Topographical Plan, BAE-PTE-ZZ-XX-DR-A-100005, Rev. C3 \r\nSite Plan with Proposed and Existing Footprint, BAE-PTE-ZZ-XX-DR-A-100006, Rev. C3 \r\nIndicative Phasing Plan, BAE-PTE-ZZ-XX-DR-A-100007, Rev. C3 \r\nExisting Masterplan Site Sections - 1:500 Site Section \r\nExisting Site Sections A - D, BAE-PTE-XX-ZZ-DR-A-102008, Rev. C3 \r\nExisting Site Sections E - I, BAE-PTE-XX-ZZ-DR-A-102009, Rev. C3 \r\n\r\nProposed Masterplan Floor Plans & Roof Plan - 1:500 \r\nMasterplan GA's Masterplan Level 099 GA Plan, BAE-PTE-ZZ-B1-DR-A-101010, Rev. C3 \r\nMasterplan Level 100 GA Plan, BAE-PTE-ZZ-00-DR-A-101011, Rev. C4 \r\nMasterplan Level 101 GA Plan, BAE-PTE-ZZ-01-DR-A-101012, Rev. C3 \r\nMasterplan Level Typical GA Plan, BAE-PTE-ZZ-ZZ-DR-A-101013, Rev. C3 \r\nMasterplan Level 107 GA Plan, BAE-PTE-ZZ-07-DR-A-101014, Rev. C4 \r\nMasterplan Level Roof GA Plan, BAE-PTE-ZZ-ZZ-DR-A-101015, Rev. C4 Proposed \r\nMasterplan Site Sections - 1:500 Site Sections \r\nProposed Site Sections A - D, BAE-PTE-XX-ZZ-DR-A-102016, Rev. C8 \r\nProposed Site Sections E - I, BAE-PTE-XX-ZZ-DR-A-102017, Rev. C5 \r\nDetailed Element \r\nProposed Floor Plans - 1:200 Phase 1A, 1B and 3a Detailed Application GA's Plan \r\nPhase 1A Detailed Application GA Plan - Level 099, BAM-PTE-XX-B1-DR-A-101017_S73, Rev. C03\r\nPhase 1A Detailed Application GA Plan - Level 100, BAM-PTE-XX-00-DR-A-101018_S73, Rev. C07\r\nPhase 1A Detailed Application GA Plan - Level 101, BAM-PTE-XX-01-DR-A-101019_S73, Rev. C06 \r\nPhase 1A Detailed Application GA Plan - Level 102, BAM-PTE-XX-02-DR-A-101020_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 103, BAM-PTE-XX-03-DR-A-101021_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 104, BAM-PTE-XX-04-DR-A-101022_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 105, BAM-PTE-XX-05-DR-A-101023_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 106, BAM-PTE-XX-06-DR-A-101024_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 107, BAM-PTE-XX-07-DR-A-101025_S73, Rev. C07 \r\nPhase 1A Detailed Application GA Plan - Level 108, BAM-PTE-XX-08-DR-A-101026_S73, Rev. C06 \r\nPhase 1B Detailed Application GA Plan - Level 099, BAE-PTE-XX-B1-DR-A-101027, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 100, BAE-PTE-XX-00-DR-A-101028, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 101, BAE-PTE-XX-01-DR-A-101029, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 102-105, BAE-PTE-XX-ZZ-DR-A-101030, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 106, BAE-PTE-XX-06-DR-A-101031, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 107, BAE-PTE-XX-07-DR-A-101032, Rev. C2 \r\nPhase 1B Detailed Application GA Plan - Level 108, BAE-PTE-XX-08-DR-A-101033, Rev. C2 \r\nPhase 3a Detailed Application GA Plan - Level 099, BAE-PTE-XX-B1-DR-A-101034, Rev. C2 \r\nPhase 3a Detailed Application GA Plan - Level 100, BAE-PTE-XX-00-DR-A-101035, Rev. C2 \r\nPhase 3a Detailed Application GA Plan - Level 101 - 104, BAE-PTE-XX-ZZ-DR-A-101036, Rev. C4 \r\nPhase 3a Detailed Application GA Plan - Level 105 - 107, BAE-PTE-XX-ZZ-DR-A-101037, Rev. C4 \r\nPhase 3a Detailed Application GA Plan - Level 108, BAE-PTE-XX-08-DR-A-101038, Rev. C3 \r\nPhase 3a Detailed Application GA Plan - Level 109, BAE-PTE-XX-09-DR-A-101039, Rev. C3\r\nPhase 3a Detailed Application GA Plan - Level 110, BAE-PTE-XX-10-DR-A-101040, Rev. C3\r\nPhase 3a Detailed Application GA Plan - Level 111, BAE-PTE-XX-11-DR-A-101041, Rev. C3 \r\n\r\nProposed Elevations - 1:200 Building Elevations \r\nDetailed Application Elevations - Block A3, BAE-PTE-VA-ZZ-DR-A-103044_S73, Rev. C010\r\nDetailed Application Elevations - Block B1 – B4, BAE-PTE-VB-ZZ-DR-A-103045_S73, Rev. C09\r\nDetailed Application Elevations - Block B1 - B2 - B3, BAE-PTE-VB-ZZ-DR-A-103046_S73, Rev. C010\r\nDetailed Application Elevations - Block B1 - B4 Internal Elevations, BAE-PTE-VB-ZZ-DR-A-103047_S73, Rev. C011 \r\n\r\nDetailed proposed plans per block - 1:100 Detailed Floor Plans and Roof Plans \r\nDetailed Application Elevations - Block C6, BAE-PTE-VC-ZZ-DR-A-103048, Rev. C3 \r\nDetailed Application Elevations - Block C7 - C9, BAE-PTE-VC-ZZ-DR-A-103049, Rev. C3 \r\nDetailed Application Elevations - Block C7 - C9 Internal Elevations, BAE-PTE-VC-ZZ-DR-A-103050, Rev. C3 \r\nDetailed Application Elevations - Block D1, BAE-PTE-VD-ZZ-DR-A-103051, Rev. C4 \r\nDetailed Application Elevations - Block D2, BAE-PTE-VD-ZZ-DR-A-103052, Rev. C4 \r\nDetailed Application Elevations - Block D3, BAE-PTE-VD-ZZ-DR-A-103053, Rev. C\r\n\r\nProposed Detailed Sections/Elevations - 1:50 Detailed Elevations Sections Detailed \r\nElevation Section - A3 North, BAE-PTE-VA-ZZ-DR-A-105054, Rev. C4 Detailed \r\nElevation Section - B1 West, BAE-PTE-VB-ZZ-DR-A-105055, Rev. C4 Detailed \r\nElevation Section - B1 East, BAE-PTE-VB-ZZ-DR-A-105056, Rev. C4 Detailed \r\nElevation Section - B1 Gateway, BAE-PTE-VB-ZZ-DR-A-105057, Rev. C4 Detailed \r\nElevation Section - B4 South, BAE-PTE-VB-ZZ-DR-A-105058, Rev. C2 Detailed \r\nElevation Section - C6 South, BAE-PTE-VC-ZZ-DR-A-105059, Rev. C2 Detailed \r\nElevation Section - C8 North, BAE-PTE-VC-ZZ-DR-A-105060, Rev. C2 Detailed \r\nElevation Section - D2 West, BAE-PTE-VD-ZZ-DR-A-105061, Rev. C2 Detailed \r\nElevation Section - D2 North & East, BAE-PTE-VD-ZZ-DR-A-105062, Rev. C3 \r\n\r\nDetailed proposed plans per block - 1:100 Detailed Floor Plans and Roof Plans \r\nA3 - Level 100 & 101-105, BAE-PTE-VA-ZZ-DR-A-101063_S73, Rev.C07 \r\nA3 - Level 106 & 107, BAE-PTE-VA-ZZ-DR-A-101064_S73, Rev.C08\r\nA3 – Roof, BAE-PTE-VA-ZZ-DR-A-101191_S73 Rev.C04 \r\nB1 - Level 100 & 101 & 102-104, BAE-PTE-VB-ZZ-DR-A-101065_S73, Rev.C08\r\nB1 - Level 105, 106 & Roof, BAE-PTE-VB-ZZ-DR-A-101066_S73, Rev.C07 \r\nB2 - Level 099 & 100, BAE-PTE-VB-ZZ-DR-A-101067_S73, Rev.C07 \r\nB2 - Level 101 & 102-106, BAE-PTE-VB-ZZ-DR-A-101068_S73, Rev.C06\r\nB2 - Level 107 & Roof, BAE-PTE-VB-ZZ-DR-A-101069_S73, Rev.C06 \r\nB3 - Level 100 & 101 & 102, BAE-PTE-VB-ZZ-DR-A-101070_S73, Rev.C04 \r\nB3 - Level 103-105, 106 & Roof, BAE-PTE-VB-ZZ-DR-A-101071_S73, Rev.C03 \r\nB4 - Level 100, 101, 102 & Roof, BAE-PTE-VB-ZZ-DR-A-101072_S73, Rev.C03 \r\nC6 - Level 100 & 101-105, BAE-PTE-VC-ZZ-DR-A-101073, Rev. 3 \r\nC6 - Level 106 & Roof, BAE-PTE-VC-ZZ-DR-A-101074, Rev. 4 \r\nC7 - Level 100 & 101-105, BAE-PTE-VC-ZZ-DR-A-101075, Rev. 3 \r\nC7 - Level 106 & 107, BAE-PTE-VC-ZZ-DR-A-101076, Rev. 2 \r\nC7 - Level Roof, BAE-PTE-VC-08-DR-A-101077, Rev. 2 \r\nC8 - Level 099, 100 & 101-105, BAE-PTE-VC-ZZ-DR-A-101078, Rev. 3 \r\nC8 - Level 106, 107 & Roof, BAE-PTE-VC-ZZ-DR-A-101079, Rev. 2 \r\nC9 - Level 100 & 101-105, BAE-PTE-VC-ZZ-DR-A-101080, Rev. 3 \r\nC9 - Level 106 & 107, BAE-PTE-VC-ZZ-DR-A-101081, Rev. 2 \r\nC9 - Level Roof, BAE-PTE-VC-08-DR-A-101082, Rev. 2 \r\nD1 - Level 099, 100 & 101, BAE-PTE-VD-ZZ-DR-A-101083, Rev. C4 \r\nD1 - Level 102-104, 105-107 & 108, BAE-PTE-VD-ZZ-DR-A-101084, Rev. C4 \r\nD1 - Level Roof, BAE-PTE-VD-RF-DR-A-101085, Rev. C2 \r\nD2 - Level 100, 101 & 102-104, BAE-PTE-VD-ZZ-DR-A-101086, Rev. C5 \r\nD2 - Level 105-109 & 110, BAE-PTE-VD-ZZ-DR-A-101087, Rev. C4 \r\nD2 - Level Roof, BAE-PTE-VD-RF-DR-A-101088, Rev. C2 \r\nD3 - Level 100, 101 & 102-104, BAE-PTE-VD-ZZ-DR-A-101089, Rev. C5 \r\nD3 - Level 105-107, 108 & Roof, BAE-PTE-VD-ZZ-DR-A-101090, Rev. C4 \r\n\r\nParameter Plans \r\nGeneral \r\nParameter Plan - Demolition Plan, BAE-PTE-ZZ-XX-DR-A-100091, Rev. 2 \r\nParameter Plan - Hybrid Application Boundary, BAE-PTE-ZZ-XX-DR-A-100092, Rev. 2 \r\nParameter Plan - Building Heights Plan, BAE-PTE-ZZ-XX-DR-A-100093, Rev.C5 \r\nParameter Plan - Building Plots Plan, BAE-PTE-ZZ-XX-DR-A-100094, Rev.C4 \r\nParameter Plan - Land Use Plan, BAE-PTE-ZZ-XX-DR-A-100095, Rev.C4 \r\nParameter Plan - Access and Movement Plan, BAE-PTE-ZZ-XX-DR-A-100096, Rev.C4 \r\nParameter Plan - Landscape and Open Space Plan, BAE-PTE-ZZ-XX-DR-A-100097, Rev.C4 \r\nParameter Plan - Basement Plan, BAE-PTE-ZZ-XX-DR-A-100098, Rev.C4 \r\n\r\nProposed Site Elevation \r\nProposed Site Elevation A - D, BAE-PTE-XX-ZZ-DR-A-103099, Rev. C6 \r\n\r\nDocuments \r\nPlanning Application Form and Certificates, prepared by Lichfields (Updated 2 February 2023) \r\nDevelopment Specification, prepared by Lichfields (Updated 2 February 2023) \r\nDesign Code, prepared by PTE and Farrer Huxley (Updated 02 November 2022)\r\nCIL Additional Information Form, prepared by Lichfields (Updated 2 February 2023) \r\nDesign and Access Statement, prepared by PTE (13 May 2022) \r\nDesign and Access Statement Addendum, prepared by PTE (Updated 11 November 2022) \r\nDesign and Access Statement addendum 2, prepared by PTE (Updated February 2023) \r\nPlanning Statement, prepared by Lichfields (13 May 2022) \r\nPlanning Statement Addendum, prepared by Lichfields (30 September 2022) \r\nPlanning Statement Report Addendum 2, prepared by Lichfields (11 November 2022) \r\nPlanning Statement Addendum, prepared by Lichfields (2 February 2023) \r\nArboricultural Impact Assessment and Method Statement, prepared by Sharon Hosegood Associates (Updated 30 September 2022) \r\nArchaeology (Buried Heritage) Assessment, prepared by RPS (Updated 30 September 2022) \r\nBasement Impact Assessment, prepared by Stantec (13 May 2022) \r\nBasement Impact Assessment Addendum, prepared by Stantec (30 September 2022) \r\nBiodiversity Impact Assessment (Net Gain), prepared by Greengage (Updated 30 September 2022) \r\nBREEAM Ecology Report, prepared by Greengage (Updated 30 September 2022) \r\nCircular Economy Statement, prepared by AECOM (13 May 2022) \r\nCircular Economy Statement Addendum, prepared by AECOM (09 November 2022) \r\nEnergy Statement and Modelling, prepared by AECOM (13 May 2022) \r\nEnergy Statement and Modelling Addendum, prepared by AECOM (09 November 2022) \r\nEquality Impact Assessment, prepared by Quod (13 May 2022) \r\nEquality Impact Assessment, Statement of Conformity (30 September 2022) \r\nFinancial Viability Assessment, prepared by DS2 (13 May 2022) \r\nFinancial Viability Assessment Addendum 1, prepared by DS2 (30 September 2022) \r\nFinancial Viability Assessment Addendum 2, prepared by DS2 (11 November 2022) \r\nFire Statement & Gateway One Form, prepared by Affinity Fire (Updated February 2022) \r\nFlood Risk Assessment and Drainage Report, prepared by Stantec (Updated 30 September 2022) \r\nGround Conditions Assessment, prepared by Stantec (13 May 2022) \r\nGreen Performance Plan, prepared by AECOM (13 May 2022) \r\nGreen Performance Plan Addendum, prepared by AECOM (09 November 2022) \r\nHealth Impact Assessment, prepared by Quod (13 May 2022) \r\nHealth Impact Assessment, Statement of Conformity, prepared by Quod (30 September 2022) \r\nInternal Daylight & Sunlight Assessment, prepared by Point 2 Surveyors (30 September 2022) \r\nInternal Daylight & Sunlight Assessment (ADDENDUM), prepared by Point 2 Surveyors (February 2023) \r\nOutline Construction Management Plan, prepared by Stantec (13 May 2022) \r\nOutline Construction Management Plan, Statement of Conformity (30 September 2022) \r\nOutline Lighting Strategy, prepared by Light Follows Behaviour (updated 30 September 2022) \r\nOverheating Report, prepared by AECOM (13 May 2022) \r\nOverheating Report Addendum, prepared by AECOM (09 November 2022) \r\nSchedule of Accommodation, prepared by PTE (updated 31 October 2022) \r\nSchedule of Accommodation, prepared by PTE (updated February 2023) \r\nSite Waste Management Plan, prepared by Stantec (13 May 2022) \r\nStatement of Community Involvement, prepared by London Communications Agency (13 May 2022) \r\nStatement of Community Involvement Addendum, prepared by London Communications Agency (11 November 2022) \r\nSustainable Design & Construction Statement including BREEAM Assessment, prepared by AECOM (13 May 2022) \r\nSustainable Design & Construction Statement including BREEAM Assessment Addendum, prepared by AECOM (09 November 2022) \r\nTransport Assessment, prepared by Stantec (13 May 2022) \r\nTransport Assessment Addendum, prepared by Stantec (30 September 2022) \r\nUnexploded Ordnance Report, prepared by Stantec (13 May 2022) \r\nUtilities and Foul Drainage Assessment, prepared by Stantec (13 May 2022) \r\nUtilities and Foul Drainage Assessment Addendum, prepared by Stantec (30 September 2022) \r\nWhole Life Carbon Report, prepared by AECOM (13 May 2022) \r\nWhole Life Carbon Report Addendum, prepared by AECOM (09 November 2022) \r\nEnvironmental Statement, coordinated by Trium Consulting (13 May 2022) \r\nEnvironmental Statement Addendum, coordinated by Trium Consulting (30 September 2022) \r\nEnvironmental Statement, Statement of Conformity, coordinated by Trium Consulting (11 November 2022)\r\nPEA, Statement of Conformity, prepared by Greengage (30 September 2022) \r\nLight Spill Report, prepared by Greengage (30 September 2022) \r\nPhase 1A Ground contamination report prepared by Stantec (January 2023) \r\nEnergy Assessment, Detailed Circular Economy Statement, Overheating Assessment, Whole Life Carbon Assessment, Green Performance Plan (Draft) and Sustainable Design and Construction Statement, statements of conformity prepared by Aecom (31 January 2023) \r\nEIA Statement of Conformity prepared by Trium (February 2023) \r\nCarnegie Park and Phase 1A Arboricultural Method Statement (Sharon Hosegood Associates: January 2023) \r\nCode of Construction Practice – Response Document (Carnegie Park & Service Works Adjacent to Blackmore House) prepared by Mount Anvil (March 2023) \r\nConstruction Logistics & Environmental Management Plan (Carnegie Park & Service Works Adjacent to Blackmore House) prepared by Mount Anvil (March 2023) \r\nS73 Documents \r\nCover Letter (Lichfields, 29/07/2024); \r\nPlanning Statement (Lichfields, 26/07/2024); \r\nUtility and Foul Drainage Report Statement - Statement of Conformity (Mount Anvil, July 2024); \r\nBiodiversity Impact Assessment (Greengage, July 2024); \r\nStatement of Conformity – Energy and Sustainability (Aecom, 24/07/2024); \r\nEquality Statement - Statement of Conformity (Quod, July 2024); \r\nBREEAM Ecology Report (Greengage, July 2024); \r\nFire Strategy Report (Affinity, 18/07/2024); \r\nCompliance Drainage Statement (PTA, 21/06/2024); \r\nHealth Impact Assessment- Statement of Conformity (Quod, July 2024); \r\nInternal Daylight and Sunlight Report (The Chancery Group, 25/07/2024); \r\nTransport Assessment – Statement of Conformity (Stantec, 24/07/2024); \r\nArboricultural Impact Assessment Report (Sharon Hosegood Associates, July 2024); \r\nStatement of Community Involvement – New Barnsbury (Newlon and Mount Anvil, 25/07/2024);\r\nEIA Statement of Conformity (Trium, 26/07/2024); \r\nDevelopment Specification (Outline Element) (Lichfields, 26/07/2024); \r\nLandscape Addendum Design and Access Statement (Farrer Huxley, July 2024); \r\nAddendum Design and Access Statement (Pollard Thomas Edwards, 24/07/2024). \r\n\r\nREASON: In the interest of proper planning"],"last_synced":"2026-01-24T02:28:11.240Z","centroid_northing":183585,"url_planning_app":null,"lpa_app_no":"P2025/2931/NMA","site_number":null,"ward":null,"locality":"London","last_date_consultation_comments":null,"date_building_work_started_under_previous_permission":null,"description":"Application for a non-material amendment to planning permission reference P2024/2412/S73, dated 04/12/2024. The applicant seeks amendments to the consented layouts to ensure compliance with building regulation requirements and to reduce the extent of the consented basement. Amendments to the consented facades are also proposed to ensure alignment with the drawings submitted under planning application ref:P2025/1765/OUT.","parking_details":{},"postcode":null,"appeal_status":null,"cil_liability":null,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14415247","status":"Approved","last_updated_by":"Agile APAS","polygon":null,"wgs84_polygon":{"coordinates":[[[-0.114921,51.536027],[-0.114922,51.536],[-0.114965,51.536001],[-0.114964,51.536028],[-0.114921,51.536027]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"22/01/2029","bo_system":"Agile APAS","decision_date":"23/01/2026","centroid_easting":530839,"actual_commencement_date":null,"id":"Islington-P2025_2931_NMA","lpa_name":"Islington","decision_target_date":"12/11/2025","valid_date":"16/10/2025","development_type":null,"last_updated":"2026-01-24T00:00:38.656Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.536014,"lon":-0.114943},"decision_process":null,"application_type_full":"Non-Material Amendment","decision_agency":null,"street_name":"Barnsbury Estate","appeal_decision":null,"title_number":null,"site_name":"Street Record","appeal_start_date":null,"application_details":{"lead_developer_company_name":"Councillor Rowena Champion"},"epc_number":null,"uprn":"10023217550","actual_completion_date":null}