{"site_name":"CHEQUER COURT","lapsed_date":null,"appeal_decision":null,"decision_agency":null,"last_synced":"2026-07-02T02:37:28.709Z","bo_system":"Agile APAS","lpa_app_no":"P2026/1007/FUL","valid_date":"15/04/2026","title_number":null,"epc_number":"8500-6329-6530-0565-5222","application_details":{"lead_developer_company_name":"Councillor Troy Gallagher","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Single phase","intended_completion_date":"07/2026","intended_commencement_date":"01/2026"}],"total_gia_gained":0,"site_area":0.0079,"total_gia_existing":79,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":79,"gia_gained":0,"use_class":"C3","gia_lost":0}],"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"scheme_phasing":true,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":79,"total_gia_lost":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"centroid_easting":532508,"decision_process":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.091381,51.523444],[-0.091382,51.523417],[-0.091426,51.523418],[-0.091424,51.523445],[-0.091381,51.523444]]]},"reference_no_of_permission_being_relied_on":null,"appeal_start_date":null,"decision_target_date":"09/06/2026","actual_commencement_date":null,"parking_details":{},"last_date_consultation_comments":"06/06/2026","url_planning_app":null,"last_updated":"2026-07-01T07:15:19.696Z","application_type":"All Other","site_number":"3","lpa_name":"Islington","application_type_full":"Full planning permission","centroid_northing":182228,"actual_completion_date":null,"cil_liability":null,"subdivision_of_building":"Unit 12 - 1st Floor","decision_conditions":null,"uprn":"5300019342","centroid":{"lon":-0.091403,"lat":51.523431},"date_building_work_completed_under_previous_permission":null,"borough":"Islington","postcode":"EC1Y 8PW","date_building_work_started_under_previous_permission":null,"description":"Replacement of existing first floor single glazed timber sash windows to the front and side elevations with double glazed timber units.","last_updated_by":"Planning Portal ingest","ward":null,"street_name":"Chequer Street","development_type":null,"decision_date":null,"appeal_status":null,"appeal_decision_date":null,"polygon":null,"secondary_street_name":null,"locality":null,"id":"Islington-P2026_1007_FUL","pp_id":"PP-14435503","status":"Application Under Consideration","decision":null}