{"date_building_work_completed_under_previous_permission":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.102153,51.541721],[-0.102155,51.541694],[-0.102198,51.541694],[-0.102197,51.541721],[-0.102153,51.541721]]]},"postcode":"N1 2UD","ward":null,"appeal_start_date":null,"appeal_decision":null,"valid_date":"23/06/2026","secondary_street_name":null,"centroid_northing":184241,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-07-01T07:16:45.467Z","description":"Installation of plant equipment at roof level, including a condenser and external ductwork, together with internal alterations to accommodate upgraded air handling system [Full Planning P2026/1530/FUL also submitted]","subdivision_of_building":"The proposals concern works to the basement, external yard area and assembly hall itself.\n","epc_number":null,"url_planning_app":null,"borough":"Islington","street_name":"UPPER STREET","decision_process":null,"last_synced":"2026-07-02T02:11:08.863Z","last_updated_by":"Planning Portal ingest","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":null,"last_date_consultation_comments":"22/07/2026","title_number":null,"appeal_status":null,"application_type_full":"Full planning & listed building consent","development_type":null,"decision_target_date":"17/08/2026","lpa_name":"Islington","uprn":"5300095052","decision_date":null,"lpa_app_no":"P2026/1531/LBC","centroid_easting":531708,"appeal_decision_date":null,"decision_conditions":null,"site_number":null,"bo_system":"Agile APAS","status":"Application Under Consideration","site_name":"TOWN HALL","decision":null,"polygon":null,"centroid":{"lon":-0.102176,"lat":51.541707},"actual_completion_date":null,"pp_id":"PP-15006383_C","decision_agency":null,"parking_details":{},"locality":null,"id":"Islington-P2026_1531_LBC","application_details":{"lead_developer_company_name":"Councillor Joseph Croft","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"01/2027","intended_commencement_date":"08/2026"}],"total_gia_gained":0,"site_area":0.30000000000000004,"total_gia_existing":1040,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":1040,"gia_gained":0,"use_class":"F2","gia_lost":0}],"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"scheme_phasing":true,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":1040,"total_gia_lost":0},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public"}}