{"polygon":null,"site_number":null,"appeal_decision_date":null,"ward":null,"appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Islington","title_number":null,"valid_date":"06/08/2026","status":"Approved","decision_process":null,"secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-09-25T00:00:06.329Z","decision_target_date":"30/09/2026","street_name":"Cruikshank Street","postcode":null,"site_name":"Land At Bevin Court Estate","lpa_app_no":"P2026/1976/LBC","development_type":null,"locality":"London","application_type_full":"Full planning & listed building consent","wgs84_polygon":{"coordinates":[[[-0.113448,51.530482],[-0.11345,51.530455],[-0.113493,51.530456],[-0.113492,51.530483],[-0.113448,51.530482]]],"type":"Polygon"},"bo_system":"Agile APAS","url_planning_app":null,"actual_completion_date":null,"application_type":"All Other","decision":"Approved","decision_date":"24/09/2026","date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":530957,"lpa_name":"Islington","decision_agency":null,"last_updated_by":"Agile APAS","last_synced":"2026-09-25T02:46:20.494Z","lapsed_date":"24/09/2029","description":"Erection of new waste, recycling and lumber stores with associated works","last_date_consultation_comments":"23/09/2026","application_details":{"lead_developer_company_name":"Councillor Ruth Hayes","infrastructure_details":{"ghg_reduction_over_building_regulations":false,"no_homes_passive_cooling":0,"no_homes_to_have_electrical_heating":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_pm_emissions":0,"mobile_network_operators_consultation":false,"no_resi_units_to_have_full_fibre":0,"green_roof_area":16,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0},"total_gia_existing":1470,"grey_water_reuse":false,"green_suds":true,"ownership_status":"Public","existing_proposed_floorspace_details":[{"gia_existing":1470,"gia_gained":0,"use_class":"C4","gia_lost":0}],"total_gia_gained":0,"site_area":1.3888,"projected_cost_of_works":"Up to £2m","rain_water_harvesting":false,"surface_water_discharge_percentage_reduction":0,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"10/2026","intended_commencement_date":"09/2026"}],"open_and_protected_space_details":{"protected_space_count":0,"open_space_local_and_other_area_loss":0,"open_space_mol_area_loss":0,"open_space_green_belt_area_gain":0,"open_space_green_belt_area_loss":0,"open_space_local_and_other_area_gain":0,"open_space_mol_area_gain":0,"open_spaces_details":[{"area":0.0013000000000000002,"access":"Unrestricted","land_swap":false,"open_space_designation":"Other","description":"13 sqm of grass, that will however be replaced for 16 sqm of green roof. The green roof figure is larger because the lumber store, which is proposed to have a green roof, is proposed on an area partially covered by tarmac.","open_space_type":"Amenity"}]},"scheme_phasing":true,"total_gia_lost":0,"garden_land_lost":true,"internal_resi_water_usage":0,"affordable_housing_fast_track":false,"non_residential_details":{"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_existing":1470}},"pp_id":"PP-15109639_C","actual_commencement_date":null,"uprn":"10001298022","centroid_northing":182971,"subdivision_of_building":"Only the existing refuse area on the tarmac estate road at the rear of Bevin Court, and part of the edge of the adjacent landscaped mound.\n\nThere are no works to Bevin Court's building fabric or to any other building structures.","centroid":{"lat":51.530469,"lon":-0.113471},"parking_details":{},"id":"Islington-P2026_1976_LBC","cil_liability":null,"decision_conditions":["3 YEAR CONSENT PERIOD FOR LBC: The works hereby permitted shall be begun not later than three years from the date of this consent.\r\n\r\nREASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5)."]}