{"polygon":null,"site_number":"48 - 50","appeal_decision_date":null,"ward":null,"appeal_decision":null,"appeal_start_date":null,"epc_number":null,"borough":"Islington","title_number":null,"valid_date":"05/08/2026","status":"Application Under Consideration","decision_process":null,"secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"reference_no_of_permission_being_relied_on":null,"last_updated":"2026-10-15T00:00:50.098Z","decision_target_date":"01/09/2026","street_name":"St John Street","postcode":"EC1M 4DT","site_name":"WEST LAYTON HOUSE","lpa_app_no":"P2026/2104/NMA","development_type":null,"locality":"London","application_type_full":"Non-Material Amendment","wgs84_polygon":{"coordinates":[[[-0.101045,51.521227],[-0.101046,51.5212],[-0.10109,51.5212],[-0.101088,51.521227],[-0.101045,51.521227]]],"type":"Polygon"},"bo_system":"Agile APAS","url_planning_app":null,"actual_completion_date":null,"application_type":"All Other","decision":null,"decision_date":null,"date_building_work_started_under_previous_permission":null,"appeal_status":null,"centroid_easting":531844,"lpa_name":"Islington","decision_agency":null,"last_updated_by":"Agile APAS","last_synced":"2026-10-21T16:25:49.946Z","lapsed_date":null,"description":"Non-Material Amendment following a grant of planning permission: P2024/3089/FUL dated 10/04/2025 for ‘Refurbishment of existing office (Use Class E) building including relocation and replacement roof plant, replacement of stair enclosure and lift core, creation of a roof terrace, revision to the facade, ground, first, second and third floor infill extensions to the rear, creation of external terrace and plant enclosure at rear first floor, ground floor infill extension to under croft, enclosure of ground floor courtyard and associated works.’ Amendments seek updated front elevation to accommodate the relocated UKPN Substation entrance (from basement to ground floor); insertion of smoke shaft from basement to roof level; installation of extract grille at fourth floor level; layout amendments to improve services, circulation, and the means of escape during a fire; removal of 1 (no.) accessible cycle parking space from ground floor level due to fire safety requirements; increase in number of long stay cycle parking spaces at lower ground floor level from 38 (no.) spaces to 45 (no.) spaces; omission of combined attenuation and rainwater harvesting tank in basement due to structural demolition risks and submission of landscaping details and amendment of Condition 17 (Landscaping) wording to a compliance condition in accordance with the landscaping proposals.","last_date_consultation_comments":null,"application_details":{"lead_developer_company_name":"Councillor Troy Gallagher"},"pp_id":"PP-15034989","actual_commencement_date":null,"uprn":"5300084485","centroid_northing":181964,"subdivision_of_building":null,"centroid":{"lat":51.521214,"lon":-0.101067},"parking_details":{},"id":"Islington-P2026_2104_NMA","cil_liability":null,"decision_conditions":["MCB-XX-00-DR-A-0300 P16, MCB-XX-01-DR-A-0301 P12, MCB-XX-02-DR-A-0302 P11, MCB-XX-03-DR-A-0303 P12, MCB-XX-04-DR-A-0304 P11, MCB-XX-RF-DR-A-0305 P10, MCB-XX-B1-DR-A-0306 P13, MCB-XX-ZZ-DR-A-0500 P08, MCB-XX-ZZ-DR-A-0501 P08, MCB-XX-ZZ-DR-A-0502 P08, MCB-XX-ZZ-DR-A-0503 P05, MCB-XX-ZZ-DR-A-0401 P07, MCB-XX-ZZ-DR-A-0402 P09, MCB-XX-ZZ-DR-A-0403 P06, MCB-XX-ZZ-DR-A-0404 P05, 732_P_01_100 P02, 732_P_04_100 P03, 732 _D_XX_201 P02, 732_D_XX_203 P02, 732 P_01_301 P02, 732 P_04_302 P02, 732 _D_XX_303 P03, 732_SCH_XX_801 P02, NMA Covering Letter prepared by Montagu Evans (dated 05/08/2026), Reuse Viability Addendum Letter prepared by McGee (dated 16 June 2026), Fire Addendum Letter prepared by Stantec (dated 20 July 2026), Ecological Assessment Addendum Letter prepared by Antea Group (dated 17 June 2026), BREEAM Pre-Assessment Addendum Letter prepared by McBains (dated 29 June 2026), Air Quality Assessment Addendum Letter prepared by Jomas Associates Ltd (dated 24 June 2026), Transport Statement Addendum prepared by Pell Frischmann (dated 27 July 2026), Design and Access Statement NMA Rev P05 prepared by McBains (dated 29 July 2026), Access Statement prepared by David Bonnett Associates (dated 30 July 2026), Archaeological Desk Based Assessment prepared by Heritage Information Ltd (dated July 2026), Sustainable Design and Construction Statement Rev P06 prepared by McBains (dated 28 July 2026), Energy Statement Rev P06 prepared by McBains (dated 13 August 2026), Flood Risk Assessment and Drainage Strategy Rev P02 prepared by McBains (dated 20 July 2026), Travel Plan Rev F3 prepared by Pell Frischmann (dated 27 July 2026), Draft Delivery and Servicing Plan Rev F2 prepared by Pell Frischmann (dated 24 July 2026), Green Roof Technical Data Sheet prepared by Bauder (dated 17 July 2026), Landscaping Specification Irrigation & Maintenance Details prepared by Andy Sturgeon Design (dated September 2026)"]}