{"borough":"Kensington & Chelsea","application_type":"All Other","decision":"Approved","decision_conditions":null,"last_synced":"2026-11-11T02:56:03.628Z","centroid_northing":177622.0,"url_planning_app":null,"lpa_app_no":"PP/25/06005","site_number":null,"ward":"Chelsea Riverside","locality":null,"last_date_consultation_comments":"03/04/2026","date_building_work_started_under_previous_permission":null,"description":"Replacement of all Flat Front Entrance Doorsets (FEDs) with fire rated doors","parking_details":null,"postcode":null,"appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14349374","status":"Approved","last_updated_by":"CSV Data Import","polygon":{"geometries":[{"coordinates":[[[526939.7,177618.25],[526941.4,177615.55],[526941.8,177615.25],[526942,177615.05],[526942.3,177615],[526942.55,177615],[526942.8,177615.05],[526943.4,177615.45],[526950.4,177619.3],[526957,177623.5],[526957.7,177623.8],[526957.95,177624],[526958.15,177624.4],[526958.2,177624.55],[526955.8,177628.45],[526954.45,177627.6],[526947.9,177623.45],[526946.8,177622.8],[526943.905,177620.945],[526939.7,177618.25]]],"type":"Polygon"}],"type":"GeometryCollection"},"wgs84_polygon":{"coordinates":[[[-0.1732541,51.4832822],[-0.17323059999999998,51.4832575],[-0.1732249,51.4832547],[-0.1732221,51.4832529],[-0.1732178,51.4832524],[-0.17321419999999998,51.4832523],[-0.1732106,51.4832527],[-0.1732018,51.4832562],[-0.1730997,51.4832892],[-0.1730032,51.4833255],[-0.17299299999999998,51.483328],[-0.17298929999999998,51.4833297],[-0.17298629999999998,51.4833333],[-0.1729855,51.4833346],[-0.1730187,51.4833702],[-0.17303839999999998,51.4833629],[-0.1731342,51.4833271],[-0.1731502,51.4833215],[-0.1731926,51.4833054],[-0.1732541,51.4832822]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"22/04/2029","bo_system":"CSV Data Import","decision_date":"22/04/2026","centroid_easting":526950.0,"actual_commencement_date":null,"id":"Kensington_&_Chelsea-PP_25_06005","lpa_name":"Kensington & Chelsea","decision_target_date":"24/04/2026","valid_date":"21/10/2025","development_type":"Minor dwellings","last_updated":"2026-11-10T12:05:32.971Z","subdivision_of_building":"The properties are typically divided into 3 separate flats. Flats with ground level access feature internal FED locations (which are to be replaced) and flats with basement level access feature external FED locations (also to be replaced). This application relates to these front entrances of the various properties included.","reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.483313,"lon":-0.173129},"decision_process":"Committee","application_type_full":"Full planning & listed building consent","decision_agency":null,"street_name":null,"appeal_decision":null,"title_number":null,"site_name":"37-49 and 55-57 (odd) Danvers Street, LONDON, SW3 5AY","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":0,"non_residential_details":{"total_gia_existing":48,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":48,"use_class":"C3","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","existing_uprns":null,"grey_water_reuse":false,"total_gia_existing":48,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Private","site_area":0.009,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"11/2025","intended_completion_date":"11/2025"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"217023183","actual_completion_date":null}