{"last_synced":"2026-11-11T02:57:18.710Z","epc_number":null,"decision":"Approved","decision_agency":null,"decision_conditions":null,"application_type":"All Other","url_planning_app":null,"development_type":"Minor all other minor developments","lpa_name":"Kensington & Chelsea","application_details":{"scheme_phasing":true,"projected_cost_of_works":"Up to £2m","site_area":0.010212,"grey_water_reuse":false,"green_suds":false,"total_gia_existing":0,"affordable_housing_fast_track":false,"total_gia_lost":0,"internal_resi_water_usage":0,"infrastructure_details":{"no_resi_units_to_have_full_fibre":0,"no_non_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"waste_provision":false,"total_annual_nox_emissions":0,"urban_greening_factor_score":0,"total_annual_pm_emissions":0,"no_homes_passive_cooling":0,"green_roof_area":0,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"percentage_demolition_construction_material_recycling":100,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false},"occupation_status":"Vacant","phasing_details":[{"phase_detail":"Entire development","intended_commencement_date":"04/2026","intended_completion_date":"06/2026"}],"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":0,"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"scheme_name":"Rooted in Kensington","surface_water_discharge_percentage_reduction":0,"rain_water_harvesting":false,"garden_land_lost":false,"total_gia_gained":0,"ownership_status":"Public"},"subdivision_of_building":null,"borough":"Kensington & Chelsea","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"decision_date":"10/09/2026","site_name":"Kensington Central Library, 12 Phillimore Walk, LONDON, W8 7RX","lapsed_date":"10/09/2029","actual_completion_date":null,"cil_liability":false,"appeal_start_date":null,"date_building_work_completed_under_previous_permission":"24/06/2026","postcode":null,"locality":null,"lpa_app_no":"PP/26/03546","date_building_work_started_under_previous_permission":"03/06/2026","title_number":null,"wgs84_polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[-0.193953,51.501383],[-0.194064,51.501342],[-0.194047,51.501326],[-0.193938,51.501366],[-0.193953,51.501383]]],"type":"Polygon"},{"coordinates":[[[-0.1945,51.501178],[-0.194591,51.501145],[-0.194577,51.501129],[-0.194485,51.501163],[-0.1945,51.501178]]],"type":"Polygon"},{"coordinates":[[[-0.194112,51.501325],[-0.194447,51.5012],[-0.194431,51.501182],[-0.194096,51.501309],[-0.194112,51.501325]]],"type":"Polygon"}]},"bo_system":"CSV Data Import","status":"Approved","appeal_status":null,"appeal_decision":null,"actual_commencement_date":null,"site_number":12,"polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[525454.55,179595.65],[525446.95,179590.9],[525448.15,179589.15],[525455.6,179593.8],[525454.55,179595.65]]],"type":"Polygon"},{"coordinates":[[[525417.15,179571.9],[525410.9,179568.1],[525411.95,179566.3],[525418.2,179570.25],[525417.15,179571.9]]],"type":"Polygon"},{"coordinates":[[[525443.65,179588.9],[525420.75,179574.4],[525421.9,179572.5],[525444.8,179587.1],[525443.65,179588.9]]],"type":"Polygon"}]},"centroid":{"lat":51.501412,"lon":-0.194435},"centroid_northing":179598.0,"last_updated_by":"CSV Data Import","id":"Kensington_&_Chelsea-PP_26_03546","application_type_full":"Full planning permission","valid_date":"16/07/2026","centroid_easting":525421.0,"parking_details":null,"last_date_consultation_comments":"14/08/2026","last_updated":"2026-11-10T12:05:41.874Z","street_name":null,"uprn":"217068403","decision_target_date":null,"secondary_street_name":null,"ward":"Campden","description":"Retrospective installation and planting scheme as part of London Festival of Architecture and Kensington and Chelsea Art Week. Installation is designed to enhance space and aid biodiversity. Constructed of timber panels, the application is for approval of a semi-permanent structure.","decision_process":"Committee","pp_id":"PP-15040110"}