{"last_synced":"2026-11-11T02:57:18.710Z","epc_number":"9063-2881-6302-0401-2631","decision":null,"decision_agency":null,"decision_conditions":null,"application_type":"All Other","url_planning_app":null,"development_type":"Minor dwellings","lpa_name":"Kensington & Chelsea","application_details":{"scheme_phasing":true,"projected_cost_of_works":"Up to £2m","site_area":0.014523,"grey_water_reuse":false,"green_suds":false,"total_gia_existing":0,"affordable_housing_fast_track":false,"total_gia_lost":0,"internal_resi_water_usage":0,"infrastructure_details":{"no_resi_units_to_have_full_fibre":0,"no_non_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"waste_provision":true,"total_annual_nox_emissions":0,"urban_greening_factor_score":0,"total_annual_pm_emissions":0,"no_homes_passive_cooling":0,"green_roof_area":0,"no_new_gas_connections_required":1,"ghg_reduction_over_building_regulations":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false},"occupation_status":"Occupied","phasing_details":[{"phase_detail":"Entire Development ","intended_commencement_date":"12/2025","intended_completion_date":"11/2026"}],"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":0,"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"surface_water_discharge_percentage_reduction":0,"rain_water_harvesting":false,"garden_land_lost":false,"total_gia_gained":0,"ownership_status":"Private"},"subdivision_of_building":null,"borough":"Kensington & Chelsea","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"decision_date":null,"site_name":"10 Cadogan Square, LONDON, SW1X 0JU","lapsed_date":null,"actual_completion_date":null,"cil_liability":null,"appeal_start_date":null,"date_building_work_completed_under_previous_permission":null,"postcode":null,"locality":null,"lpa_app_no":"PP/26/04258","date_building_work_started_under_previous_permission":"02/12/2025","title_number":null,"wgs84_polygon":{"coordinates":[[[-0.160845,51.495966],[-0.160846,51.49594],[-0.16089,51.49594],[-0.160889,51.495967],[-0.160845,51.495966]]],"type":"Polygon"},"bo_system":"CSV Data Import","status":"Application Under Consideration","appeal_status":null,"appeal_decision":null,"actual_commencement_date":null,"site_number":10,"polygon":null,"centroid":{"lat":51.495953,"lon":-0.160867},"centroid_northing":179049.0,"last_updated_by":"CSV Data Import","id":"Kensington_&_Chelsea-PP_26_04258","application_type_full":"Full planning permission","valid_date":"04/08/2026","centroid_easting":527766.0,"parking_details":null,"last_date_consultation_comments":"04/09/2026","last_updated":"2026-11-10T12:05:43.988Z","street_name":null,"uprn":"217009385","decision_target_date":null,"secondary_street_name":null,"ward":"Brompton and Hans Town","description":"Installation of new pipework from under pavement basement, around lightwell to enter property via basement flat and connect into existing services (Part retrospective application)","decision_process":null,"pp_id":"PP-15122762"}