{"borough":"London Borough of Lambeth","application_type":"All Other","decision":"Approved","decision_conditions":["Vehicles","Approved drawings","Temporary Structures","Waste and refuse","Opening Hours","NRMM"],"last_synced":"2026-02-05T01:55:35.570Z","centroid_northing":"175338","url_planning_app":null,"lpa_app_no":"25/03123/FUL","site_number":"","ward":"CLTOWN","locality":null,"last_date_consultation_comments":"29/01/2026","date_building_work_started_under_previous_permission":null,"description":"Retrospective Permission for Temporary use of land from 1st October to 30th April 2026 for two sauna cabinets, six plunge tubs, one kiosk, seating area with stretch tent canopy above, and 2 metre high boundary fencing with painted plywood entrance gates.","parking_details":null,"postcode":"SW4 0JB","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14380788","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[529230,175324],[529225,175314],[529235,175306],[529248,175310],[529245,175320],[529236,175319],[529230,175324]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.141151,51.462145],[-0.141227,51.462056],[-0.141086,51.461982],[-0.140897,51.462015],[-0.140937,51.462106],[-0.141067,51.462099],[-0.141151,51.462145]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"29/01/2029","bo_system":"Idox Uniform","decision_date":"29/01/2026","centroid_easting":"529238","actual_commencement_date":null,"id":"Lambeth-25_03123_FUL","lpa_name":"Lambeth","decision_target_date":"24/12/2025","valid_date":"29/10/2025","development_type":null,"last_updated":"2026-02-04T21:01:02.833Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.462269,"lon":-0.141031},"decision_process":"Committee","application_type_full":"Full planning permission","decision_agency":null,"street_name":"Development Control Pseudo Street","appeal_decision":null,"title_number":[],"site_name":"CockPond, Clapham Common","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":80,"total_gia_gained":30,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":30,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":30},"garden_land_lost":false,"existing_proposed_floorspace_details":[{"gia_existing":0,"gia_gained":30,"use_class":"SG","gia_lost":0}],"open_and_protected_space_details":{"open_spaces_details":[{"area":0.0316,"access":"Restricted","land_swap":false,"open_space_designation":"Metropolitan Open Land","description":"Small temporary sauna facility -- as per the description of development  -This area is already used as an attraction in the summer months for children and parents as a interactive splash pool, so even though there is \"change of use\", the area was used for a leisure activity for children, and now its a temporary leisure for adults in a small underused part of the site. The site currently remains closed during the winter months after September up until May and this proposed scheme would ensure a more efficient and effective use of the site to enable activity on it all year round. The Applicants are keen to have a useable community space for the winter months when the site is not used and would offer heavily discounted sessions to people that need them the most (NHS / blue lights / students / people on benefits). ","open_space_type":"Outdoor sports facilities incl. school playing fields"}],"open_space_green_belt_area_gain":0,"open_space_mol_area_gain":0,"open_space_local_and_other_area_loss":0,"open_space_local_and_other_area_gain":0,"open_space_mol_area_loss":0,"protected_space_count":0,"open_space_green_belt_area_loss":0},"building_details":[{"no_storeys":1,"max_height":4,"building_ref":"2 Sauna Cabins both mobile and temporary  "},{"no_storeys":1,"max_height":4,"building_ref":"1 kiosk"}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":0,"surface_water_discharge_percentage_reduction":100,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"ownership_status":"Public","site_area":0.0316,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"11/2025","intended_commencement_date":"10/2025"}],"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"urban_greening_factor_score":0.1,"green_roof_area":0,"ghg_reduction_over_building_regulations":true,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"total_annual_nox_emissions":10.5,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":90,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":2.25}},"epc_number":null,"uprn":"010094961304","actual_completion_date":null}