{"borough":"London Borough of Lambeth","application_type":"All Other","decision":"Approved","decision_conditions":["",""],"last_synced":"2026-03-05T01:43:12.751Z","centroid_northing":"177286","url_planning_app":null,"lpa_app_no":"25/03386/FUL","site_number":"","ward":"OVALWA","locality":null,"last_date_consultation_comments":"27/11/2025","date_building_work_started_under_previous_permission":null,"description":"Installation of Electric Vehicle Charging Infrastructure comprising one charging terminal on the carriageway adjacent 94-105 South Lambeth Road, London, SW8 1QX.","parking_details":null,"postcode":"SW8 1QX","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14326453","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"geometries":[{"coordinates":[[[530390,177280],[530384,177294],[530380,177293],[530387,177278],[530390,177280]]],"type":"Polygon"}],"type":"geometrycollection"},"wgs84_polygon":{"coordinates":[[[-0.123742,51.479457],[-0.123823,51.479585],[-0.123881,51.479577],[-0.123786,51.47944],[-0.123742,51.479457]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"26/02/2029","bo_system":"Idox Uniform","decision_date":"26/02/2026","centroid_easting":"530385","actual_commencement_date":null,"id":"Lambeth-25_03386_FUL","lpa_name":"Lambeth","decision_target_date":"24/12/2025","valid_date":"29/10/2025","development_type":null,"last_updated":"2026-03-04T21:00:25.836Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.479512,"lon":-0.123812},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":null,"street_name":"Development Control Pseudo Street","appeal_decision":null,"title_number":[],"site_name":"Carriageway Adjacent To 94-105 South Lambeth Road","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":0,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0},"garden_land_lost":false,"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":0,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"scheme_name":"Electric Vehicle Infrastructure Delivery Scheme","rain_water_harvesting":false,"ownership_status":"Public","site_area":0.006500000000000001,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"05/2026","intended_commencement_date":"03/2026"}],"lead_developer_company_name":"Total Energies UK ","infrastructure_details":{"no_homes_to_have_electrical_heating":0,"no_active_rapid_ev_charging_points":1,"waste_provision":false,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"fire_suppression_system_proposed":false,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"percentage_demolition_construction_material_recycling":0,"no_passive_rapid_ev_charging_points":0,"mobile_network_operators_consultation":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"010095615461","actual_completion_date":null}