{"borough":"London Borough of Lambeth","application_type":"All Other","decision":"Approved","decision_conditions":["","Approved drawings and documents","Time Limit"],"last_synced":"2026-02-13T03:24:53.153Z","centroid_northing":"174342","url_planning_app":null,"lpa_app_no":"25/03410/FUL","site_number":"33","ward":"CLCOMM","locality":null,"last_date_consultation_comments":"05/02/2026","date_building_work_started_under_previous_permission":null,"description":"Installation of Electric Vehicle Charging Infrastructure comprising one charging terminal on the footway adjacent 33  Cavendish Road.","parking_details":null,"postcode":"SW12 0BH","appeal_status":null,"cil_liability":false,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14393571","status":"Approved","last_updated_by":"Idox Uniform","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[529076,174331],[529078,174334],[529070,174339],[529068,174336],[529066,174333],[529072,174330],[529076,174331]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.143729,51.453256],[-0.143699,51.453283],[-0.143812,51.45333],[-0.143842,51.453303],[-0.143872,51.453277],[-0.143787,51.453248],[-0.143729,51.453256]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":"06/02/2029","bo_system":"Idox Uniform","decision_date":"06/02/2026","centroid_easting":"529078","actual_commencement_date":null,"id":"Lambeth-25_03410_FUL","lpa_name":"Lambeth","decision_target_date":"26/12/2025","valid_date":"31/10/2025","development_type":null,"last_updated":"2026-02-12T21:00:59.594Z","subdivision_of_building":null,"reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.453355,"lon":-0.143696},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":null,"street_name":"Cavendish Road","appeal_decision":null,"title_number":[],"site_name":"","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":0,"total_gia_gained":0,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0},"garden_land_lost":false,"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":0,"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"scheme_name":"Electric Vehicle Infrastructure Delivery Scheme","rain_water_harvesting":false,"ownership_status":"Public","site_area":0.0033,"total_gia_lost":0,"green_suds":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"05/2026","intended_commencement_date":"03/2026"}],"lead_developer_company_name":"Total Energies UK ","infrastructure_details":{"no_homes_to_have_electrical_heating":0,"no_active_rapid_ev_charging_points":1,"waste_provision":false,"green_roof_area":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"total_annual_nox_emissions":0,"no_new_gas_connections_required":0,"fire_suppression_system_proposed":false,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"percentage_demolition_construction_material_recycling":0,"no_passive_rapid_ev_charging_points":0,"mobile_network_operators_consultation":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0}},"epc_number":null,"uprn":"100023674142","actual_completion_date":null}