{"decision":"Approved","last_date_consultation_comments":"17/03/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.119823,51.499808],[-0.119932,51.499261],[-0.119013,51.499192],[-0.118917,51.499757],[-0.119823,51.499808]]]},"date_building_work_started_under_previous_permission":null,"ward":"WATERL","site_number":null,"polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[530604,179550],[530598,179489],[530662,179483],[530667,179546],[530604,179550]]],"type":"Polygon"}]},"appeal_status":null,"application_type_full":"Full planning permission","borough":"Lambeth","lpa_name":"Lambeth","postcode":null,"appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"23/02/2026","site_name":"249 St Thomas' Hospital, North Wing \rWestminster Bridge Road\rLondon\rLambeth\rSE1 7EH","decision_date":"10/09/2026","pp_id":"PP-14611661","actual_completion_date":null,"url_planning_app":null,"application_details":{"surface_water_discharge_percentage_reduction":0,"site_area":0.42,"projected_cost_of_works":"Up to £2m","garden_land_lost":false,"scheme_phasing":true,"infrastructure_details":{"fire_suppression_system_proposed":false,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":false,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false},"internal_resi_water_usage":0,"ownership_status":"Public","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0,"total_gia_existing":4200},"existing_proposed_floorspace_details":[{"gia_existing":4200,"gia_gained":0,"use_class":"EE","gia_lost":0}],"green_suds":false,"phasing_details":[{"phase_detail":"Single Phase project ","intended_completion_date":"07/2026","intended_commencement_date":"05/2026"}],"total_gia_gained":0,"total_gia_existing":4200,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"rain_water_harvesting":false},"development_type":null,"centroid_easting":null,"decision_target_date":"20/04/2026","decision_agency":null,"actual_commencement_date":null,"lpa_app_no":"26/00069/FUL","decision_process":"Delegated","lapsed_date":"10/09/2029","uprn":"010008790568","bo_system":"Idox Uniform","cil_liability":false,"street_name":null,"locality":null,"application_type":"All Other","epc_number":null,"decision_conditions":["","",""],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":null,"last_updated":"2026-09-16T20:00:41.009Z","centroid":{"lon":-7.55716,"lat":49.766807},"subdivision_of_building":null,"last_synced":"2026-09-17T02:32:16.226Z","last_updated_by":"Idox Uniform","title_number":[],"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Lambeth-26_00069_FUL","parking_details":null,"description":"Installation of an air conditioning chiller plant on 13th floor (Roof Level), North Wing of St. Thomas Hospital."}