{"site_name":"Piano House","site_number":9,"decision_process":"Delegated","subdivision_of_building":"North Elevation- External Atria on Ground Floor","decision_date":"14/05/2026","last_date_consultation_comments":"24/04/2026","street_name":"Brighton Terrace","lpa_name":"Lambeth","date_building_work_started_under_previous_permission":null,"last_updated_by":"Planning Portal ingest","postcode":"SW9 8DJ","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"bo_system":"Idox Uniform","decision_conditions":["Gate-open inwards","Approved plans","Matching materials","Time limit"],"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.116108,51.461719],[-0.11609,51.461817],[-0.116089,51.461825],[-0.116185,51.461832],[-0.116236,51.461835],[-0.116483,51.46185],[-0.116572,51.461855],[-0.116609,51.461858],[-0.11661,51.461851],[-0.116633,51.461717],[-0.116596,51.461714],[-0.116599,51.461695],[-0.11663,51.461507],[-0.11663,51.461506],[-0.116614,51.461496],[-0.116466,51.461486],[-0.116456,51.461485],[-0.116402,51.461481],[-0.116289,51.461473],[-0.116263,51.461483],[-0.116243,51.461594],[-0.116225,51.461603],[-0.11616,51.461598],[-0.116154,51.461597],[-0.11612,51.461642],[-0.116108,51.461719]]]},"centroid_easting":530951,"url_planning_app":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"actual_commencement_date":null,"cil_liability":false,"epc_number":"0870-0841-8399-9627-9006","locality":"London","ward":"BRACRE","appeal_start_date":null,"secondary_street_name":null,"centroid":{"lat":51.461633,"lon":-0.116397},"title_number":[],"decision_target_date":"14/05/2026","decision":"Approved","uprn":100023387855,"application_type":"All Other","appeal_status":null,"polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[530970.8,175321.05],[530971.767,175331.958],[530971.85,175332.9],[530965.15,175333.45],[530961.6,175333.75],[530944.4,175334.9],[530938.2,175335.4],[530935.614,175335.602],[530935.555,175334.85],[530934.388,175319.885],[530936.975,175319.683],[530936.8,175317.55],[530935.15,175296.5],[530935.2,175296.4],[530936.35,175295.4],[530946.6,175294.5],[530947.3,175294.44],[530951.07,175294.08],[530958.95,175293.35],[530960.75,175294.55],[530961.8,175306.9],[530963,175308],[530967.55,175307.5],[530968,175307.45],[530970.2,175312.5],[530970.8,175321.05]]],"type":"Polygon"},{"coordinates":[[[530968,175307.45],[530967.55,175307.5],[530963,175308],[530961.8,175306.9],[530960.75,175294.55],[530958.95,175293.35],[530951.07,175294.08],[530947.3,175294.44],[530946.6,175294.5],[530936.35,175295.4],[530935.2,175296.4],[530935.15,175296.5],[530936.8,175317.55],[530936.975,175319.683],[530934.388,175319.885],[530935.555,175334.85],[530935.614,175335.602],[530934.9,175334.9],[530934.6,175332.4],[530934.4,175330.4],[530934.05,175327.15],[530933.7,175323.95],[530933.6,175322.9],[530933.45,175321.8],[530932.3,175309.05],[530931,175296.4],[530930.6,175291.9],[530930.5,175290.88],[530929.4,175280.1],[530939.5,175284.35],[530948.52,175288.07],[530950.49,175287.88],[530958.8,175287.1],[530959,175288.6],[530964.55,175288.05],[530964.8,175291.65],[530967.25,175291.4],[530970.25,175291.25],[530972,175308],[530974.8,175307.85],[530975.8,175320],[530976.878,175331.861],[530971.767,175331.958],[530970.8,175321.05],[530970.2,175312.5],[530968,175307.45]]],"type":"Polygon"}]},"decision_agency":null,"actual_completion_date":null,"pp_id":"PP-14790921","lpa_app_no":"26/00884/FUL","last_synced":"2026-06-29T02:09:55.752Z","centroid_northing":175311,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"07/2026","intended_commencement_date":"05/2026"}],"total_gia_gained":0,"site_area":0.0225,"total_gia_lost":0,"total_gia_existing":4800,"existing_proposed_floorspace_details":[{"gia_existing":4800,"gia_gained":0,"use_class":"EG1","gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":4800},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"status":"Approved","parking_details":{"no_existing_car":8,"net_car":0,"no_proposed_car":8},"description":"Replacement entrance gates to the existing external atria (225 sqm). Note there are no works proposed to the building itself. ","lapsed_date":"14/05/2029","application_type_full":"Full planning permission","borough":"Lambeth","last_updated":"2026-06-28T04:47:32.588Z","development_type":null,"id":"Lambeth-26_00884_FUL","valid_date":"19/03/2026"}