{"actual_completion_date":null,"appeal_start_date":null,"application_type_full":"Full planning permission","decision_conditions":["Time period (three years commencement)","In accordance with approved plans","NOISE CONTROL FROM THE GYMNASIA","DELIVERY AND SERVICING","HOURS OF OPERATION","OPERATIONAL MANAGEMENT PLAN"],"decision":"Approved","appeal_decision":null,"valid_date":"28/04/2026","description":"Change of use of the ground-floor unit at the north-west corner of 76 Upper Ground to incorporate Use Classes E(d) and E(e) alongside existing Use Classes E(a) and E(b), including an alteration to the permitted hours of operation.","status":"Approved","last_updated_by":"Idox Uniform","site_number":"76","cil_liability":false,"decision_process":"Delegated","development_type":null,"subdivision_of_building":null,"centroid_northing":"180414","last_updated":"2026-08-12T20:01:13.527Z","lapsed_date":"06/08/2029","bo_system":"Idox Uniform","centroid":{"lat":51.507462,"lon":-0.11262},"parking_details":null,"url_planning_app":null,"pp_id":"PP-14810598","locality":null,"reference_no_of_permission_being_relied_on":null,"uprn":"200000485243","ward":"WATERL","last_synced":"2026-08-16T01:41:57.011Z","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"N/A","intended_commencement_date":"05/2026","intended_completion_date":"05/2027"}],"total_gia_gained":0,"site_area":0.044,"total_gia_lost":0,"total_gia_existing":440,"existing_proposed_floorspace_details":[{"gia_existing":440,"use_class":"SpecifiedOther","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Vacant","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":440},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"},"street_name":"Upper Ground","decision_agency":null,"appeal_decision_date":null,"site_name":"","last_date_consultation_comments":"12/06/2026","secondary_street_name":null,"lpa_name":"Lambeth","title_number":[],"epc_number":null,"decision_date":"06/08/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.113362,51.507644],[-0.113142,51.507722],[-0.11317,51.507758],[-0.11314,51.507767],[-0.113209,51.50784],[-0.113239,51.507831],[-0.113308,51.507895],[-0.113513,51.507827],[-0.113362,51.507644]]]},"date_building_work_started_under_previous_permission":null,"decision_target_date":"23/06/2026","postcode":"SE1 9PZ","appeal_status":null,"polygon":{"geometries":[{"coordinates":[[[531030,180433],[531045,180442],[531043,180446],[531045,180447],[531040,180455],[531038,180454],[531033,180461],[531019,180453],[531030,180433]]],"type":"Polygon"}],"type":"geometrycollection"},"centroid_easting":"531082","date_building_work_completed_under_previous_permission":null,"borough":"Lambeth","id":"Lambeth-26_01334_FUL","application_type":"All Other","lpa_app_no":"26/01334/FUL","actual_commencement_date":null}