{"date_building_work_completed_under_previous_permission":null,"cil_liability":false,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.09938,51.463049],[-0.099438,51.463032],[-0.099302,51.462841],[-0.099167,51.462632],[-0.099167,51.462632],[-0.099108,51.462658],[-0.099244,51.462849],[-0.09938,51.463049]]]},"postcode":"SE24 0HU","ward":"HERNEH","appeal_start_date":null,"appeal_decision":null,"valid_date":"10/06/2026","secondary_street_name":null,"centroid_northing":"175483","reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-08-10T20:00:39.451Z","description":"Erection of a single storey ground floor rear extension with a courtyard to Flat 1.","subdivision_of_building":null,"epc_number":null,"url_planning_app":null,"borough":"Lambeth","street_name":"Hinton Road","decision_process":"Delegated","last_synced":"2026-08-11T02:41:41.818Z","last_updated_by":"Idox Uniform","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"04/08/2029","last_date_consultation_comments":"14/07/2026","title_number":[],"appeal_status":null,"application_type_full":"Full planning permission","development_type":null,"decision_target_date":"05/08/2026","lpa_name":"Lambeth","uprn":"100023257255","decision_date":"04/08/2026","lpa_app_no":"26/01493/FUL","centroid_easting":"532134","appeal_decision_date":null,"decision_conditions":["External Work and Finishes","Approved Drawings","Duration","Non-Road Mobile Machinery"],"site_number":"114","bo_system":"Idox Uniform","status":"Approved","site_name":"","decision":"Approved","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[532129,175499],[532125,175497],[532135,175476],[532145,175453],[532145,175453],[532149,175456],[532139,175477],[532129,175499]]],"type":"Polygon"}]},"centroid":{"lon":-0.099314,"lat":51.462904},"actual_completion_date":null,"pp_id":"PP-14341622","decision_agency":null,"parking_details":null,"locality":null,"id":"Lambeth-26_01493_FUL","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"entire development","intended_commencement_date":"08/2026","intended_completion_date":"12/2026"}],"total_gia_gained":23,"site_area":0.0256,"total_gia_lost":0,"total_gia_existing":56,"existing_proposed_floorspace_details":[{"gia_existing":56,"use_class":"C3","gia_gained":23,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":30,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":23,"total_gia_lost":0,"total_gia_existing":56},"garden_land_lost":true,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0.5,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0.84,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"internal_resi_water_usage":110,"ownership_status":"Private"}}