{"date_building_work_completed_under_previous_permission":null,"cil_liability":false,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.126859,51.4677],[-0.127066,51.467577],[-0.127009,51.467558],[-0.126817,51.467672],[-0.126859,51.4677]]]},"postcode":"SW9 9JZ","ward":"CLEAST","appeal_start_date":null,"appeal_decision":null,"valid_date":"12/06/2026","secondary_street_name":null,"centroid_northing":"175960","reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-07-30T20:01:36.510Z","description":"Replacement of the rear return roof from flat roof to pitched roof with 2no. roof lights; replacement of the second floor side window with upvc  obscured  double glazed casement window. (Works relate to the Second Floor Flat)","subdivision_of_building":null,"epc_number":null,"url_planning_app":null,"borough":"Lambeth","street_name":"Mayflower Road","decision_process":"Delegated","last_synced":"2026-07-31T03:02:14.164Z","last_updated_by":"Idox Uniform","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":"24/07/2029","last_date_consultation_comments":"17/07/2026","title_number":[],"appeal_status":null,"application_type_full":"Full planning permission","development_type":null,"decision_target_date":"07/08/2026","lpa_name":"Lambeth","uprn":"100023388789","decision_date":"24/07/2026","lpa_app_no":"26/01721/FUL","centroid_easting":"530203","appeal_decision_date":null,"decision_conditions":["","",""],"site_number":"10","bo_system":"Idox Uniform","status":"Approved","site_name":"","decision":"Approved","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[530207,175967],[530193,175953],[530197,175951],[530210,175964],[530207,175967]]],"type":"Polygon"}]},"centroid":{"lon":-0.126919,"lat":51.467638},"actual_completion_date":null,"pp_id":"PP-15006120","decision_agency":null,"parking_details":null,"locality":null,"id":"Lambeth-26_01721_FUL","application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Phase 1","intended_commencement_date":"09/2026","intended_completion_date":"10/2026"}],"total_gia_gained":0,"site_area":0.018000000000000002,"total_gia_lost":0,"total_gia_existing":82,"existing_proposed_floorspace_details":[{"gia_existing":82,"use_class":"C3","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0,"total_gia_existing":82},"garden_land_lost":false,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":false,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Private"}}