{"application_details":{"affordable_housing_fast_track":false,"infrastructure_details":{"no_homes_to_have_electrical_heating":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_passive_cooling":0,"mobile_network_operators_consultation":false,"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_non_resi_units_to_have_full_fibre":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"no_new_water_connections_required":0,"ghg_reduction_over_building_regulations":false,"total_annual_nox_emissions":0},"total_gia_existing":114.6,"projected_cost_of_works":"Up to £2m","total_gia_gained":0,"existing_proposed_floorspace_details":[{"gia_existing":114.6,"use_class":"C3","gia_gained":0,"gia_lost":0}],"green_suds":false,"rain_water_harvesting":false,"scheme_phasing":true,"non_residential_details":{"total_gia_existing":114.6,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_lost":0},"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"03/2026","intended_completion_date":"03/2027"}],"ownership_status":"Private","site_area":0.009545,"garden_land_lost":false,"surface_water_discharge_percentage_reduction":0,"internal_resi_water_usage":0,"grey_water_reuse":false,"total_gia_lost":0},"site_name":"","lpa_app_no":"26/01803/FUL","last_updated_by":"Idox Uniform","epc_number":null,"development_type":null,"postcode":"SW4 7QB","pp_id":"PP-14839127","valid_date":"18/06/2026","last_date_consultation_comments":"23/07/2026","decision_target_date":"13/08/2026","decision_conditions":["Time period (three years commencement)","External works to match existing","Non-Road-Mobile Machinery (NRMM)","Approved Plans"],"date_building_work_completed_under_previous_permission":null,"decision":"Approved","description":"Replacement of all double glazed uPVC windows with like-for-like, including the rear uPVC door with like-for-like and the front timber door with composite door.","centroid":{"lon":-0.122153,"lat":51.46133},"reference_no_of_permission_being_relied_on":null,"decision_date":"27/07/2026","status":"Approved","title_number":[],"actual_completion_date":null,"decision_agency":null,"centroid_easting":"530552","centroid_northing":"175267","url_planning_app":null,"appeal_start_date":null,"parking_details":null,"date_building_work_started_under_previous_permission":null,"ward":"BRACRE","decision_process":"Delegated","last_synced":"2026-08-01T03:21:43.234Z","locality":null,"appeal_decision":null,"appeal_decision_date":null,"cil_liability":false,"lapsed_date":"27/07/2029","secondary_street_name":null,"borough":"Lambeth","wgs84_polygon":{"coordinates":[[[-0.122192,51.461429],[-0.122236,51.461412],[-0.122113,51.461257],[-0.122069,51.461275],[-0.122138,51.461357],[-0.122192,51.461429]]],"type":"Polygon"},"actual_commencement_date":null,"last_updated":"2026-07-31T20:01:23.599Z","polygon":{"geometries":[{"coordinates":[[[530549,175278],[530546,175276],[530555,175259],[530558,175261],[530553,175270],[530549,175278]]],"type":"Polygon"}],"type":"geometrycollection"},"application_type":"All Other","uprn":"100023363702","site_number":"38","street_name":"Santley Street","appeal_status":null,"subdivision_of_building":null,"id":"Lambeth-26_01803_FUL","application_type_full":"Full planning permission","bo_system":"Idox Uniform","lpa_name":"Lambeth"}