{"status":"Refused","decision":"Refused","valid_date":"24/08/2026","decision_target_date":"19/10/2026","last_synced":"2026-11-06T03:31:11.480Z","centroid_northing":null,"development_type":null,"actual_completion_date":null,"decision_conditions":["","",""],"lpa_name":"Lambeth","date_building_work_completed_under_previous_permission":null,"cil_liability":false,"pp_id":"PP-15079461","last_updated":"2026-11-05T21:01:13.054Z","parking_details":null,"lapsed_date":"30/10/2029","title_number":[],"locality":null,"url_planning_app":null,"last_date_consultation_comments":"05/10/2026","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.127758,51.420035],[-0.128065,51.419932],[-0.127914,51.419408],[-0.127871,51.419399],[-0.127842,51.419398],[-0.12736,51.419579],[-0.127554,51.419753],[-0.127758,51.420035]]]},"application_type_full":"Full planning permission","ward":"STRCOM","bo_system":"Idox Uniform","appeal_decision_date":null,"decision_date":"30/10/2026","centroid":{"lat":49.766807,"lon":-7.55716},"lpa_app_no":"26/02109/FUL","actual_commencement_date":null,"site_name":"Petrol Filling Station \r275 Streatham High Road\rLondon\rLambeth\rSW16 3NN","secondary_street_name":null,"id":"Lambeth-26_02109_FUL","uprn":"100023319117","centroid_easting":null,"decision_agency":null,"decision_process":"Delegated","street_name":null,"subdivision_of_building":null,"epc_number":null,"site_number":null,"reference_no_of_permission_being_relied_on":null,"polygon":{"geometries":[{"coordinates":[[[530280,170665],[530259,170653],[530271,170595],[530274,170594],[530276,170594],[530309,170615],[530295,170634],[530280,170665]]],"type":"Polygon"}],"type":"geometrycollection"},"appeal_decision":null,"date_building_work_started_under_previous_permission":null,"last_updated_by":"Idox Uniform","borough":"Lambeth","application_details":{"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"scheme_phasing":true,"green_suds":false,"internal_resi_water_usage":0,"total_gia_existing":350,"total_gia_gained":0,"non_residential_details":{"total_gia_lost":0,"total_gia_existing":350,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0},"total_gia_lost":0,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"07/2026","intended_completion_date":"08/2026"}],"infrastructure_details":{"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"green_roof_area":0,"no_non_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_passive_rapid_ev_charging_points":0,"no_homes_to_have_electrical_heating":0,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false,"no_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"total_annual_pm_emissions":0,"no_homes_passive_cooling":0,"no_active_rapid_ev_charging_points":4,"urban_greening_factor_score":0},"surface_water_discharge_percentage_reduction":0,"affordable_housing_fast_track":false,"rain_water_harvesting":false,"site_area":0.45,"garden_land_lost":false,"ownership_status":"Private","existing_proposed_floorspace_details":[{"gia_existing":350,"use_class":"SG","gia_gained":0,"gia_lost":0}],"occupation_status":"Occupied"},"appeal_start_date":null,"description":"Part retrospective application to regularise the unauthorised formation of EV charging facilities including closure of access from Streatham Common South to provide 4x EV charging spaces and installation of EV cabinet equipment, relocation of valet bay, relocation of offset fills and tank vents.","appeal_status":null,"postcode":null,"application_type":"All Other"}