{"last_synced":"2026-11-17T02:18:38.641Z","epc_number":null,"decision":null,"decision_agency":null,"decision_conditions":null,"application_type":"All Other","url_planning_app":null,"development_type":null,"lpa_name":"Lambeth","application_details":{"scheme_phasing":true,"projected_cost_of_works":"Up to £2m","site_area":0.0025,"grey_water_reuse":false,"lead_developer_company_name":"Total Energies","green_suds":false,"total_gia_existing":0,"affordable_housing_fast_track":false,"total_gia_lost":0,"internal_resi_water_usage":0,"infrastructure_details":{"no_resi_units_to_have_full_fibre":0,"no_non_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"waste_provision":false,"no_active_rapid_ev_charging_points":1,"total_annual_nox_emissions":0,"urban_greening_factor_score":0,"total_annual_pm_emissions":0,"no_homes_passive_cooling":0,"green_roof_area":0,"no_new_gas_connections_required":0,"waste_details":[{"external_dry_recycling":false,"external_food_waste":false,"unit_reference":"N/A","external_residual_waste":false,"reason_for_no_provision":"N/A","internal_residual_waste":false,"internal_food_waste":false,"internal_dry_recycling":false}],"ghg_reduction_over_building_regulations":false,"no_passive_rapid_ev_charging_points":0,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false},"occupation_status":"Occupied","phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"02/2027","intended_completion_date":"03/2027"}],"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_gia_existing":0,"total_gia_lost":0,"total_gia_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0},"scheme_name":"Electric Vehicle Infrastructure Delivery Scheme","surface_water_discharge_percentage_reduction":0,"rain_water_harvesting":false,"garden_land_lost":false,"total_gia_gained":0,"ownership_status":"Public"},"subdivision_of_building":null,"borough":"Lambeth","appeal_decision_date":null,"reference_no_of_permission_being_relied_on":null,"decision_date":null,"site_name":"Land Adjacent To 33 Tooting Bec Gardens","lapsed_date":null,"actual_completion_date":null,"cil_liability":false,"appeal_start_date":null,"date_building_work_completed_under_previous_permission":null,"postcode":"SW16 1QY","locality":null,"lpa_app_no":"26/02904/FUL","date_building_work_started_under_previous_permission":null,"title_number":[],"wgs84_polygon":{"coordinates":[[[-0.133422,51.43],[-0.133423,51.429982],[-0.133336,51.42998],[-0.133335,51.430007],[-0.133422,51.43]]],"type":"Polygon"},"bo_system":"Idox Uniform","status":"Application Under Consideration","appeal_status":null,"appeal_decision":null,"actual_commencement_date":null,"site_number":"","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[529858,171763],[529858,171761],[529864,171761],[529864,171764],[529858,171763]]],"type":"Polygon"}]},"centroid":{"lat":51.42999,"lon":-0.133379},"centroid_northing":"171762","last_updated_by":"Idox Uniform","id":"Lambeth-26_02904_FUL","application_type_full":"Full planning permission","valid_date":"06/10/2026","centroid_easting":"529861","parking_details":null,"last_date_consultation_comments":"26/11/2026","last_updated":"2026-11-16T21:01:39.305Z","street_name":"Development Control Pseudo Street","uprn":"010097543156","decision_target_date":"01/12/2026","secondary_street_name":null,"ward":"STRSTL","description":"Installation of Electric Vehicle Charging Infrastructure on the carriageway.","decision_process":null,"pp_id":"PP-15271965"}