{"borough":"Merton","application_type":"All Other","decision":null,"decision_conditions":["&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Commencement of development (Full Permission)&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development to which\r\nthis permission relates shall be commenced not later than the expiration of 3\r\nyears from the date of this permission.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason:&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;  To comply with Section 91\r\n(as amended) of the Town &amp; Country Planning Act 1990.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Approved Plans&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development hereby permitted shall be carried out\r\nin accordance with the following approved plans:&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;PO1C&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;PO2C&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;PO3C&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;PO4B&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: For the avoidance of doubt and in the interests of proper\r\nplanning&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Contaminated Land - Remedial Measures</span></u><span style=\"font-size: 14px;\"> - Where applicable, prior to first occupation t</span></span>he remediation as recommended in the Remediation Method Statement shall be completed and a verification report shall be submitted to and approved in writing by the local planning authority.</p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 2021 policy\r\nD12.1 of the Local Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Removal of PD (Extensions/Alterations)</span></u><span style=\"font-size: 14px;\"> - Notwithstanding the provisions\r\nof the Town and Country Planning (General Permitted Development) (England)\r\nOrder 2015 (or any Order revoking and re-enacting that Order with or without\r\nmodification), no extension, enlargement or other alteration of the\r\ndwellinghouse other than that expressly authorised by this permission shall be\r\ncarried out without planning permission first obtained from the Local Planning\r\nAuthority.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  The Local Planning\r\nAuthority considers that further development could cause detriment to the\r\namenities of the occupiers of nearby properties or to the character of the area\r\nand for this reason would wish to control any future Development plan policies\r\nfor Merton: policy D4 of the London Plan 2021 and policies D12.3 & D12.4  of the Local Plan 2024.</span></span></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Refuse stored</span></u><span style=\"font-size: 14px;\"> - No refuse or waste material of any description\r\nshall be left or stored anywhere on the site other than within a building or\r\nrefuse enclosure.</span></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To safeguard the appearance of the property and the\r\namenities of the area and to accord with Policies D3 and D6 of the London Plan\r\n2021and policy D12.3 of the Local Plan 2024.</span></p><p class=\"MsoNormal\"><o:p></o:p></p><p class=\"MsoNormal\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><o:p></o:p></span></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">External Lighting </span></u><span style=\"font-size: 14px;\">- Any external lighting shall be positioned and angled\r\nto prevent any light spillage or glare beyond the site boundary.</span></span></p><p><span style=\"line-height: 107%;\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify; margin-bottom: 0cm; line-height: normal;\"><span style=\"\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To safeguard the amenities of the area and\r\nthe occupiers of neighbouring properties and ensure compliance with the\r\nfollowing Development Plan policies for Merton: policies D12.1 & D12.3 of\r\nthe Local Plan 2024.</span><span style=\"font-size: 12pt;\"><o:p></o:p></span></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Air Quality</span></u><span style=\"font-size: 14px;\"> - All Non-Road Mobile Machinery (NRMM) of net\r\npower of 37kW and up to and including 560kW used during the course of the\r\ndemolition, site preparation and construction phases shall comply with the\r\nemission standards set out in chapter 7 of the GLA's supplementary planning\r\nguidance \"Control of Dust and Emissions During Construction and\r\nDemolition\" dated July 2014 (SPG), or subsequent guidance. </span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\">Unless it complies with the standards set out in the SPG,\r\nno NRMM shall be on site, at any time, whether in use or not, without the prior\r\nwritten consent of the local planning authority. The developer shall keep an up\r\nto date list of all NRMM used during the demolition, site preparation and\r\nconstruction phases of the development on the online register at\r\nhttps://nrmm.London/</span><o:p></o:p></span></p><p style=\"text-align: justify;\"><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n</span><span style=\"font-size:12.0pt;line-height:107%;font-family:\" arial\",sans-serif;=\"\" mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=\"\" en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To comply\r\nwith Policy SI1 of the London Plan 2021 and Policy P15.10 of the Local Plan\r\n2024.</span></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Noise Levels</span></u><span style=\"font-size: 14px;\"> - Expressed as the equivalent continuous sound\r\nlevel) LAeq (15 minutes), from the new mechanical plant/air conditioning shall\r\nnot exceed LA90-10bB at the boundary with any residential property. </span></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To safeguard\r\nthe amenities of the occupiers of adjoining properties and to comply with the\r\nfollowing Development Plan policies for Merton policy D14 of the London Plan\r\n2021 and policies D12.1 and D12.4 of the Local Plan 2024.</span></span></p><p class=\"MsoNormal\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><o:p></o:p></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"line-height: 107%;\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Fire Strategy</span></u> - The development shall be carried out in\r\naccordance with the provisions of the Fire Safety Strategy prepared by Terence Smith AA dipl&nbsp;(dated September 2025) and must fully comply with The Building Regulation\r\n2010 (as amended) unless otherwise approved in writing by the Local Planning\r\nAuthority.<o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure that the development incorporates the\r\nnecessary fire safety measures in accordance with the Mayor's London Plan\r\nPolicy D12.</span></p>","<p style=\"text-align: justify; \"><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">Landscaping</span></u><span style=\"font-size: 14px;\"> - Prior to commencement of above ground works details of a\r\nlandscaping and planting scheme shall be submitted to and approved in writing\r\nby the Local Planning Authority and these works shall be carried out as\r\napproved before the commencement of the use or the occupation of any building\r\nhereby approved, unless otherwise agreed in writing by the Local Planning\r\nAuthority. The details shall include on a plan, full details of the size,\r\nspecies, spacing, quantities and location of proposed plants, together with any\r\nhard surfacing, means of enclosure, and indications of all existing trees,\r\nhedges and any other features to be retained, and measures for their protection\r\nduring the course of development.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:&nbsp; </span></span><span style=\"font-size: 14px;\">To enhance\r\nthe appearance of the development in the interest of the amenities of the area,\r\nto ensure the provision sustainable drainage surfaces and to comply with the\r\nfollowing Development Plan policies for Merton: policies G7 and D8 of the\r\nLondon Plan 2021 and policies F15.7, F15.8, O15.1, O15.2 </span><span style=\"font-size: 14px;\">&nbsp;</span><span style=\"font-size: 14px;\">and O15.4 of the Local Plan 2024.</span><o:p></o:p></span></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">New Vehicle Access</span></u><span style=\"font-size: 14px;\"> - Details to be submitted  - No development shall commence until details\r\nof the proposed vehicular access to serve the development have been submitted\r\nin writing for approval to the Local Planning Authority.  No works that are subject of this condition\r\nshall be carried out until those details have been approved, and the\r\ndevelopment shall not be occupied until those details have been approved and\r\ncompleted in full.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  In the\r\ninterests of the safety of pedestrians and vehicles and to comply with the\r\nfollowing Development Plan policies for Merton: policies T16.3 and T16.4 of the\r\nLocal Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Vehicle Access to be provided </span></u><span style=\"font-size: 14px;\">- The development hereby approved shall\r\nnot be occupied until the proposed vehicle access has been sited and laid out\r\nin accordance with the approved plans</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  In the\r\ninterests of the safety of pedestrians and vehicles and to comply with the\r\nfollowing Development Plan policies for Merton: policies T16.3 and T16.4 of the\r\nLocal Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Visibility Splays</span></u><span style=\"font-size: 14px;\"> - Prior to the occupation of the development 2 metre x\r\n2 metre pedestrian visibility splays shall be provided either side of the\r\nvehicular access to the site. Any objects within the visibility splays shall\r\nnot exceed a height of 0.6 metres.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In the interests of the safety of pedestrians and\r\nvehicles and to comply with the following Development Plan policies for Merton:\r\npolicies T16.3 and T16.4 of the Local Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Cycle Parking to be implemented</span></u><span style=\"font-size: 14px;\"> - The development hereby permitted shall\r\nnot be occupied until the cycle parking shown on the plans hereby approved has\r\nbeen provided and made available for use. These facilities shall be retained\r\nfor the occupants of and visitors to the development at all times.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure satisfactory facilities for cycle parking\r\nare provided and to comply with the following Development Plan policies for\r\nMerton: policy T5 of the London Plan 2021 and policies T16.1 and T16.2 of the\r\nLocal Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">External Materials as Specified</span></u><span style=\"font-size: 14px;\"> - The facing materials to be used for the\r\ndevelopment hereby permitted shall be those specified in the application form\r\nunless otherwise agreed in writing by the Local Planning Authority.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To ensure a satisfactory\r\nappearance of the development and to comply with the following Development Plan\r\npolicies for Merton: policies D4 and D8 of the London Plan 2021, policies D12.1\r\nand D12.3 of the Local Plan 2024.</span><s></s></span></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Working Method Statement </span></u><span style=\"font-size: 14px;\">- Development shall not commence\r\nuntil a working method statement has been submitted to and approved in writing\r\nby the Local Planning Authority to accommodate:</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%; font-size: 14px;\"> </span><span style=\"font-size: 14px;\">  (i) Parking of\r\nvehicles of site workers and visitors;</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (ii) Delivery\r\ntimes;</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (iii) Loading and\r\nunloading of plant and materials;</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (iv) Storage of\r\nconstruction plant and materials;</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (v) Wheel cleaning\r\nfacilities</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (vi) Control of\r\ndust, smell and other effluvia;</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   (vii) Control of\r\nsurface water run-off.</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%; font-size: 14px;\"> </span><span style=\"font-size: 14px;\">No development shall\r\nbe carried out except in full accordance with the approved method statement.</span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure the safety of pedestrians and vehicles\r\nand the amenities of the surrounding area and to comply with the following\r\nDevelopment Plan policies for Merton: policies T4 and T7 of the London Plan\r\n2021 and policies T16.3 and T16.4 of the Local Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Sustainability (Water Consumption)</span></u><span style=\"font-size: 14px;\"> - No part of the development hereby\r\napproved shall be occupied until evidence has been submitted to, and approved\r\nin writing by, the Local Planning Authority confirming that the development has\r\nachieved internal water consumption rates of no greater than 105 litres per\r\nperson per day.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure that the development achieves a high\r\nstandard of sustainability and makes efficient use of resources and to comply\r\nwith the following Development Plan policies for Merton: Policy SI 2 and SI 3\r\nof the London Plan 2021 and Policies CC2.1, CC2.2, CC2.3, CC2.4, CC2.5 and CC2.6\r\nof the Local Plan 2024.</span></span><o:p></o:p></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Contaminated Land - Pre-liminary Risk Assessment, Site\r\nInvestigation and Remediation Method Statement </span></u><span style=\"font-size: 14px;\">- </span></span><span style=\"font-size: 14px;\">No development shall occur until:</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size: 14px;\">i) a preliminary risk-assessment has been submitted to and\r\napproved in writing by the local planning authority.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">ii) a site-investigation has been conducted to consider the\r\npotential for contaminated-land and has been submitted to and approved in\r\nwriting by the local planning authority.</span><o:p></o:p></span></p><p><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%; font-size: 14px;\">iii) a remediation method statement, described to make the\r\nsite suitable for, intended use by removing unacceptable risks to sensitive\r\nreceptors, has been submitted to and approved in writing by the local planning\r\nauthority.</span></p><p class=\"MsoNormal\"><span style=\"line-height: 107%;\"><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 and policy D12.1\r\nof the Local Plan 2024.</span></span><o:p></o:p></p><p class=\"MsoNormal\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><o:p><br></o:p></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Boundary Treatment</span></u><span style=\"font-size: 14px;\"> - Prior to commencement of above ground works details of all boundary walls or fences shall be submitted in writing for approval\r\nto the Local Planning Authority. No works which are the subject of this\r\ncondition shall be carried out until the details are approved, and the\r\ndevelopment shall not be occupied / the use of the development hereby approved\r\nshall not commence until the details are approved and works to which this\r\ncondition relates have been carried out in accordance with the approved details.\r\nThe walls and fencing shall be&nbsp;</span></span><span style=\"font-family: Arial, sans-serif; font-size: 14px;\">permanently retained\r\nthereafter.</span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\" arial\",sans-serif;=\"\" mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=\"\" en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure a satisfactory and safe development in accordance with\r\nthe following Development Plan policies for Merton: policies D4 and D8 of the\r\nLondon Plan 2021 and policies D12.1 and D12.3 of the Local Plan 2024</span><s></s></span></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Refuse & Recycling (Implementation) </span></u><span style=\"font-size: 14px;\">- The development hereby\r\napproved shall not be occupied until the refuse and recycling storage\r\nfacilities shown on the approved plans have been fully implemented and made\r\navailable for use. These facilities shall thereafter be retained for use at all\r\ntimes.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To ensure the provision\r\nof satisfactory facilities for the storage of refuse and recycling material and\r\nto comply with the following Development Plan policies for Merton: policies T4\r\nand T7 of the London Plan 2021 and policy \r\nW14.4 of the Local Plan 2024.  </span></span></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Construction Times (Minor Development)</span></u><span style=\"font-size: 14px;\"> - No demolition or construction work or ancillary\r\nactivities such as deliveries shall take place before 8am or after 6pm Mondays\r\n- Fridays inclusive, before 8am or after 1pm on Saturdays or at any time on\r\nSundays or Bank Holidays.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify; margin-bottom: 0cm; line-height: normal;\"><span style=\"font-size:12.0pt;font-family:\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\">Reason:  </span><span style=\"font-size: 14px;\">To safeguard the amenities of the area and\r\nthe occupiers of neighbouring properties and ensure compliance with the\r\nfollowing Development Plan policies for Merton: policies D14 and T7 of the\r\nLondon Plan 2021 and policies D12.1 & D12.3 of the Local Plan 2024.</span><o:p></o:p></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">Hardstanding (Porous) </span></u><span style=\"font-size: 14px;\">- The hardstanding hereby permitted shall be\r\nmade of porous materials, or provision made to direct surface water run-off to\r\na permeable or porous area or surface within the application site before the\r\ndevelopment hereby permitted is first occupied or brought into use.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:&nbsp; </span></span><span style=\"font-size: 14px;\">To reduce\r\nsurface water run-off and to reduce pressure on the surrounding drainage system\r\nin accordance with the following Development Plan policies for Merton: policy\r\nSI12 of the London Plan 2021 and policies F15.7, F15.8 and F15.9 of the Local\r\nPlan 2024.</span><span style=\"font-size: 14px;\">&nbsp;</span></span><o:p></o:p></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Provision of Vehicle Parking</span></u><span style=\"font-size: 14px;\"> - The vehicle parking area\r\n(including any garages hereby approved) shown on the approved plans shall be\r\nprovided before the commencement of the buildings or use hereby permitted and\r\nshall be retained for parking purposes for occupiers and users of the\r\ndevelopment and for no other purpose.</span></span></p><p class=\"MsoNormal\"><span style=\"line-height: 107%;\"><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure the provision of a satisfactory level of\r\nparking and comply with the following Development Plan policies for Merton:\r\npolicy T6 of the London Plan 2021 and policy T16.4 of the Local Plan 2024.</span></span></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-family: Aptos, sans-serif; font-size: 14px;\">Construction Management Plan/ Dust Management\r\nPlan</span><span style=\"font-size: 14px;\">&nbsp;</span></u></span></p><p style=\"text-align: justify; \">1. Prior to the commencement of development, including\r\ndemolition, a detailed Demolition and Construction Environmental Management\r\nPlan (DCEMP) shall be submitted to and approved in writing by the Local\r\nPlanning Authority. The DCEMP shall include:</p>\r\n\r\n<p class=\"MsoNormal\">a) An Air quality management plan that identifies the steps\r\nand procedures that will be implemented to minimise the creation and impact of\r\ndust and other air emissions resulting from the site preparation, demolition,\r\nand groundwork and construction phases of the development. This is also to\r\ninclude continuous dust monitoring.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\">b) Construction environmental management plan that\r\nidentifies the steps and procedures that will be implemented to minimise the\r\ncreation and impact of noise, vibration, dust and other air emissions resulting\r\nfrom the site preparation, demolition, and groundwork and construction phases\r\nof the development.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\">2. The development shall not be implemented other than in\r\naccordance with the approved scheme, unless previously agreed in writing by the\r\nLocal Planning Authority.<o:p></o:p></p>\r\n\r\n<p class=\"MsoNormal\">Reason : To manage and prevent further deterioration of\r\nexisting low-quality air across London in accordance with London Plan Policies\r\nSI1(B)(1c), SI1(B)(2d) and NPPF 199</p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Sustainable Drainage</span></u><span style=\"font-size: 14px;\"> - No development approved by this\r\npermission shall be commenced until a scheme for the provision of surface water\r\ndrainage has been implemented in accordance with details that have been\r\nsubmitted to and approved in writing by the local planning authority. Before\r\nthese details are submitted an assessment shall be carried out of the potential\r\nfor disposing of surface water by means of a sustainable drainage system (SuDS)\r\nto ground, watercourse or sewer in accordance with drainage hierarchy contained\r\nwithin the London Plan Policy 5.13 and the advice contained within the National\r\nSuDS Standards. Where a sustainable drainage scheme is to be provided, the\r\nsubmitted details shall:</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   i. provide\r\ninformation about the design storm period and intensity, the method employed to\r\ndelay (attenuate) and control the rate of surface water discharged from the\r\nsite as close to greenfield runoff rates (8l/s/ha) as reasonably practicable\r\nand the measures taken to prevent pollution of the receiving groundwater and/or\r\nsurface waters; </span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">   ii.  include a timetable for its implementation;\r\nand </span><o:p></o:p></span></p><p style=\"text-align: justify;\"><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n\r\n\r\n</span><span style=\"line-height: 107%; font-size: 14px;\">   iii. provide a management and maintenance\r\nplan for the lifetime of the development which shall include the arrangements\r\nfor adoption by a public authority or statutory undertaker and any other arrangements to secure the operation\r\nof the scheme throughout its lifetime.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure satisfactory means of surface water\r\ndrainage, to reduce the risk of flooding and to comply with the following\r\nDevelopment Plan policies for Merton: policy SI 13 of the London Plan 2021 and\r\npolicies F15.7, F15.8 and F15.9 of the Local Plan 2024.</span></span><o:p></o:p></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\" arial\",sans-serif;=\"\" mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=\"\" en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa\"=\"\"><br></span></p>","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Commencement of development (Full Permission)&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development to which\r\nthis permission relates shall be commenced not later than the expiration of 3\r\nyears from the date of this permission.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason:&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp; To comply with Section 91\r\n(as amended) of the Town &amp;amp; Country Planning Act 1990.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;"],"last_synced":"2026-07-17T02:47:42.092Z","centroid_northing":168169,"url_planning_app":"https://rspandlp.merton.gov.uk//planning/index.html?fa=getApplication&id=263384","lpa_app_no":"25/P2750","site_number":383,"ward":"Pollards Hill","locality":"Mitcham","last_date_consultation_comments":"20/12/2025","date_building_work_started_under_previous_permission":null,"description":"Proposed single storey 2-bedroom house to rear of 383 Commonside East, Mitcham","parking_details":{"no_proposed_car":0,"net_car":-1,"no_existing_car":1},"postcode":"CR4 1HF","appeal_status":null,"cil_liability":true,"date_building_work_completed_under_previous_permission":null,"pp_id":"PP-14333284","status":"Application Under Consideration","last_updated_by":"PP overwrite repair","polygon":{"type":"GeometryCollection","geometries":[{"coordinates":[[[529340.55,168186],[529329.95,168192.3],[529323.8881826171,168181.67931957994],[529334.1390215566,168175.9815434404],[529340.55,168186]]],"type":"Polygon"}]},"wgs84_polygon":{"coordinates":[[[-0.142165,51.397972],[-0.142315,51.398031],[-0.142406,51.397937],[-0.142261,51.397883],[-0.142165,51.397972]]],"type":"Polygon"},"appeal_decision_date":null,"secondary_street_name":null,"lapsed_date":null,"bo_system":"Portal","decision_date":null,"centroid_easting":529320,"actual_commencement_date":null,"id":"Merton-25_P2750","lpa_name":"Merton","decision_target_date":"11/05/2026","valid_date":"16/03/2026","development_type":"Minor dwellings","last_updated":"2026-07-16T18:53:21.234Z","subdivision_of_building":"Proposed house to rear of existing house","reference_no_of_permission_being_relied_on":null,"centroid":{"lat":51.397824,"lon":-0.142466},"decision_process":"Delegated","application_type_full":"Full planning permission","decision_agency":"Borough","street_name":"Commonside East","appeal_decision":null,"title_number":null,"site_name":"Land Rear Of 383 Commonside East","appeal_start_date":null,"application_details":{"scheme_phasing":true,"internal_resi_water_usage":102.7,"total_gia_gained":63,"non_residential_details":{"total_gia_existing":0,"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":63},"garden_land_lost":true,"existing_proposed_floorspace_details":[{"use_class":"A1"},{"use_class":"A1"},{"use_class":"A2"},{"use_class":"A3"},{"use_class":"B1a"},{"use_class":"B1b"},{"use_class":"B1c"},{"use_class":"B2"},{"use_class":"B8"},{"use_class":"C1"},{"use_class":"C2"},{"use_class":"D1"},{"use_class":"D2"}],"building_details":[{"no_storeys":1,"max_height":4.3,"building_ref":"new house at rear"}],"projected_cost_of_works":"Up to £2m","grey_water_reuse":false,"total_gia_existing":0,"surface_water_discharge_percentage_reduction":15,"affordable_housing_fast_track":false,"rain_water_harvesting":true,"ownership_status":"Private","site_area":0.012,"total_gia_lost":0,"green_suds":true,"phasing_details":[{"phase_detail":"single phase","intended_completion_date":"04/2026","intended_commencement_date":"12/2025"}],"residential_details":{"total_no_existing_residential_affordable_units":0,"total_no_proposed_bedrooms":2,"total_no_existing_residential_units_intermediate":0,"total_no_existing_residential_units_starter_homes":0,"total_no_existing_residential_units_london_shared_ownership":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_proposed_residential_units_starter_homes":0,"residential_units":[{"no_habitable_rooms":3,"provider":"Private rented sector","change_type":"Gain","garden_land":true,"unit_type":"House or Bungalow","no_bedrooms":2,"tenure":"Market for rent","gia":63}],"total_no_existing_residential_units_london_living_rent":0,"total_no_proposed_residential_units_market_for_sale":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_residential_units_london_living_rent":0,"total_no_existing_residential_units":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_london_affordable_rent":0,"total_gia_gained":63,"total_no_proposed_residential_units":1,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_shared_equity":0,"dwelling_density":0,"total_no_proposed_residential_units_intermediate":0,"total_no_existing_residential_units_market_for_rent":0,"total_no_proposed_residential_units_market_for_rent":1,"total_no_existing_residential_units_social_rent":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_proposed_residential_units_london_shared_ownership":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"infrastructure_details":{"no_homes_to_have_electrical_heating":1,"waste_provision":true,"green_roof_area":0,"ghg_reduction_over_building_regulations":true,"no_resi_units_to_have_full_fibre":1,"no_homes_passive_cooling":1,"no_new_water_connections_required":1,"total_annual_nox_emissions":0,"solar_pv_capacity":0,"no_active_fast_ev_charging_points":1,"no_new_gas_connections_required":0,"percentage_demolition_construction_material_recycling":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_non_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"no_passive_fast_ev_charging_points":0,"chp_heat_pumps_capacity":0,"urban_greening_factor_score":0},"non_permanent_dwellings_details":[{"type":"Traveller pitches/plots"},{"type":"Houseboat moorings"},{"type":"Non-permanent dwellings"}],"other_residential_accommodation_details":{"other_resi_accommodation_unit_details":[{"unit_type":"Hostel Room"},{"unit_type":"Hotel Room"},{"unit_type":"Apart-Hotel Room"},{"unit_type":"Secure Residential Room"}]},"occupation_status":"Occupied"},"epc_number":null,"uprn":48016994,"actual_completion_date":null}