{"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"02/2026","intended_completion_date":"03/2026"}],"total_gia_gained":0,"site_area":0.00936,"total_gia_existing":280.2,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":280.2,"use_class":"C3","gia_gained":0,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":0,"total_gia_existing":280.2,"total_gia_lost":0},"garden_land_lost":false,"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"parking_details":null,"secondary_street_name":null,"appeal_start_date":null,"lapsed_date":"12/01/2029","actual_commencement_date":null,"last_updated_by":"Planning Portal ingest","cil_liability":false,"last_updated":"2026-01-27T14:47:50.808Z","street_name":"Lavender Avenue","decision":"Approved","epc_number":null,"decision_date":"12/01/2026","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"url_planning_app":"http://planning.merton.gov.uk/Northgate/PlanningExplorer/DisplayAppDetails.aspx?AppNo=25/P3182","date_building_work_started_under_previous_permission":null,"status":"Approved","centroid":{"lon":-0.170425,"lat":51.411555},"appeal_status":null,"decision_target_date":"25/12/2025","lpa_app_no":"25/P3182","postcode":"CR4 3RS","application_type_full":"Full planning permission","uprn":"48041912","title_number":null,"decision_agency":"Borough","subdivision_of_building":null,"appeal_decision_date":null,"borough":"Merton","centroid_northing":169647.0,"description":"REPLACEMENT OF EXISTING TIMBER FRAME WINDOWS WITH UPVC FRAME WINDOWS.","appeal_decision":null,"id":"Merton-25_P3182","site_name":null,"development_type":"Minor all other minor developments","pp_id":"PP-14442848","lpa_name":"Merton","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.170518,51.411568],[-0.170342,51.411596],[-0.170318,51.411536],[-0.170388,51.411525],[-0.17038,51.411503],[-0.170416,51.411498],[-0.170425,51.411519],[-0.170495,51.411508],[-0.170518,51.411568]]]},"site_number":"89","last_date_consultation_comments":"10/01/2026","valid_date":"30/10/2025","application_type":"All Other","decision_conditions":["Condition : 1 - Commencement of development (Full Permission) - The development to which this permission relates shall be commenced not later than the expiration of 3 years from the date of this permission.","Condition : 2 - Approved Plans - The development hereby permitted shall be carried out in accordance with the following approved plans: [Draw no. 1100 Rev 01\r\nDraw no. 1500 Rev 01\r\nDraw no. 1400 Rev 01\r\n]","Condition : 3 - Materials as Specified - The facing materials to be used for the development hereby permitted shall be those specified in the application form unless otherwise agreed in writing by the Local Planning Authority.","Condition : 4 - INFORMATIVE\r\nNote to Applicant -Approved Schemes\r\nIn accordance with paragraph 38 of the National Planning Policy Framework, London Borough of Merton (LBM) takes a positive and proactive approach to the delivery of sustainable development, by:\r\n1. Providing a formal pre-application advice service, details to be found on Planning pre-application advice service on LBM's website\r\n2. Providing written policies and guidance, which is available to view on LBM's website.\r\n3. Where appropriate, negotiating amendments to secure a positive decision.\r\n4. Determining applications in a timely manner including providing a fast track service, details to be found on Get a quicker planning decision on LBM's website.\r\n\r\nIn this instance:\r\ni) The application was acceptable as submitted, and approved"],"bo_system":"Northgate M3","centroid_easting":527337.0,"locality":"Mitcham","ward":"Lavender Fields","polygon":{"geometries":[{"coordinates":[[[527330.5000118576,169648.350326896],[527342.7000118656,169651.70032689755],[527344.5000118667,169645.05032689596],[527339.6500118634,169643.70032689598],[527340.3000118639,169641.30032689398],[527337.8000118623,169640.650326894],[527337.1500118619,169643.05032689468],[527332.3000118587,169641.70032689453],[527330.5000118576,169648.350326896]]],"type":"Polygon"}],"type":"geometrycollection"},"decision_process":null,"date_building_work_completed_under_previous_permission":null,"last_synced":"2026-01-28T02:27:03.596Z"}