{"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Entire Development","intended_commencement_date":"02/2026","intended_completion_date":"07/2026"}],"total_gia_gained":104.2,"site_area":0.014620000000000001,"total_gia_existing":85.9,"total_gia_lost":0,"existing_proposed_floorspace_details":[{"gia_existing":85.9,"use_class":"C3","gia_gained":104.2,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","scheme_phasing":true,"rain_water_harvesting":false,"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":104.2,"total_gia_existing":85.9,"total_gia_lost":0},"garden_land_lost":true,"internal_resi_water_usage":110,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":0,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"ownership_status":"Private"},"parking_details":{"no_existing_cycle":1,"no_proposed_cycle":1,"net_cycle":0},"secondary_street_name":null,"appeal_start_date":null,"lapsed_date":"15/12/2028","actual_commencement_date":null,"last_updated_by":"Planning Portal ingest","cil_liability":true,"last_updated":"2026-01-27T14:47:32.758Z","street_name":"Links Road","decision":"Approved","epc_number":null,"decision_date":"15/12/2025","reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"url_planning_app":"http://planning.merton.gov.uk/Northgate/PlanningExplorer/DisplayAppDetails.aspx?AppNo=25/P3200","date_building_work_started_under_previous_permission":null,"status":"Approved","centroid":{"lon":-0.160794,"lat":51.420082},"appeal_status":null,"decision_target_date":"26/12/2025","lpa_app_no":"25/P3200","postcode":"SW17 9ET","application_type_full":"Full planning permission","uprn":"48043349","title_number":null,"decision_agency":"Borough","subdivision_of_building":"Rear Ground Floor","appeal_decision_date":null,"borough":"Merton","centroid_northing":170612.0,"description":"APPLICATION FOR THE ERECTION OF A SINGLE STOREY REAR EXTENSION.","appeal_decision":null,"id":"Merton-25_P3200","site_name":null,"development_type":"Other house holder developments","pp_id":"PP-14423753\r","lpa_name":"Merton","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.1609,51.419948],[-0.160823,51.419943],[-0.160723,51.42015],[-0.160798,51.420164],[-0.1609,51.419948]]]},"site_number":"2","last_date_consultation_comments":"14/12/2025","valid_date":"31/10/2025","application_type":"Householder","decision_conditions":["Condition : 1 - Commencement of development (Full Permission) - The development to which this permission relates shall be commenced not later than the expiration of 3 years from the date of this permission.","Condition : 2 - Approved Plans - The development hereby permitted shall be carried out in accordance with the following approved plans: [Location Plan\r\nDwg no. YD-PP-2LR-A07 Rev -\r\nDwg no. YD-PP-2LR-A06 Rev -\r\nDwg no. YD-PP-2LR-A05 Rev -\r\nDwg no. YD-PP-2LR-A04 Rev -\r\nDwg no. YD-PP-2LR-A03 Rev -\r\nDwg no. YD-PP-2LR-A02 Rev -\r\nDwg no. YD-PP-2LR-A01 Rev -\r\n]","Condition : 3 - Materials as Specified - The facing materials to be used for the development hereby permitted shall be those specified in the application form unless otherwise agreed in writing by the Local Planning Authority.","Condition : 4 - INFORMATIVE\r\nNote to Applicant -Approved Schemes\r\nIn accordance with paragraph 38 of the National Planning Policy Framework, London Borough of Merton (LBM) takes a positive and proactive approach to the delivery of sustainable development, by:\r\n1. Providing a formal pre-application advice service, details to be found on Planning pre-application advice service on LBM's website\r\n2. Providing written policies and guidance, which is available to view on LBM's website.\r\n3. Where appropriate, negotiating amendments to secure a positive decision.\r\n4. Determining applications in a timely manner including providing a fast track service, details to be found on Get a quicker planning decision on LBM's website.\r\n\r\nIn this instance:\r\ni) The application was acceptable as submitted, and approved without delay.","Condition : 5 - INFORMATIVE\r\nBuilding Regulations \r\nPlease note that this is a planning permission only and you may also require approval under the Building Regulations. If you are in any doubt about this you can get further information via https://www.merton.gov.uk/planning-and-buildings/building-control  or by emailing building.control@merton.gov.uk.\r\n","Condition : 6 - INFOMRATIVE: The applicant is advised to consult with Network Rail prior to the commencement of works. "],"bo_system":"Northgate M3","centroid_easting":527983.0,"locality":"London","ward":"Graveney","polygon":{"geometries":[{"coordinates":[[[527975.9500122997,170596.95032716083],[527981.3500123032,170596.50032716204],[527987.7000123078,170619.70032716816],[527982.4500123044,170621.1003271676],[527975.9500122997,170596.95032716083]]],"type":"Polygon"}],"type":"geometrycollection"},"decision_process":null,"date_building_work_completed_under_previous_permission":null,"last_synced":"2026-01-28T02:39:24.754Z"}