{"postcode":"","status":"Approved","decision_agency":"Borough","subdivision_of_building":null,"appeal_start_date":null,"cil_liability":true,"decision_conditions":["&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Approved Plans&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development hereby permitted shall be carried out\r\nin accordance with the following approved plans:&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-200 – Site Plan\r\n(Ground Fl Plan)&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-200-R - Site Plan\r\n(Roof Plan)&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-201 – Ground Floor&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-202 – First Floor&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-203 – Second Floor&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-204 – Roof Plan&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-205 – Front (North)\r\nElevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-206 – Rear (South) Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-207 – Side (East)\r\nElevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-208 – Side (West\r\nElevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-220 – Front (North)\r\nSite Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-221 – Rear (South)\r\nSite Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-521 – Proposed Dwelling\r\n– Ground Floor&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-522 – Proposed Dwelling\r\n– First Floor&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-524 – Proposed Dwelling\r\n– Roof Plan&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-525 – Proposed Dwelling\r\n– Front (North) Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-526 – Proposed Dwelling\r\n– Rear (South) Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-529 – Proposed Dwelling\r\n– Side (East) Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;TableParagraph&quot; style=&quot;margin-left:17.9pt&quot;&gt;&lt;span lang=&quot;EN-US&quot; style=&quot;font-size:10.0pt;mso-bidi-font-size:11.0pt&quot;&gt;P2411-528 – Proposed Dwelling\r\n– Side (West) Elevation&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: For the avoidance of doubt and in the interests of proper\r\nplanning&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Commencement of development (Full Permission)&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development to which\r\nthis permission relates shall be commenced not later than the expiration of 3\r\nyears from the date of this permission.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason:&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;  To comply with Section 91\r\n(as amended) of the Town &amp; Country Planning Act 1990.&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;No Use of Flat Roof&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;Other\r\nthan the area labelled as ‘terrace’ on plans hereby approved, access to all\r\nareas of flat roof including the flat roof of the Flat 1 extension hereby\r\npermitted shall be for maintenance or emergency purposes only, and the flat\r\nroof shall not be used as a roof garden, terrace, patio or similar amenity\r\narea.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To safeguard the\r\namenities and privacy of the occupiers of adjoining properties and to comply\r\nwith the following Development Plan policies for Merton: policies D3 and D4 of\r\nthe London Plan 2021 and policies D12.3 &amp;amp; D12.4&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-size: 14px; line-height: 107%;&quot; aptos&quot;,sans-serif;=&quot;&quot; mso-ascii-theme-font:minor-latin;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:&quot;times=&quot;&quot; new=&quot;&quot; roman&quot;;=&quot;&quot; mso-bidi-theme-font:minor-bidi;mso-ansi-language:en-gb;mso-fareast-language:=&quot;&quot; en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size: 14px; line-height: 107%;&quot;&gt;of the Local Plan\r\n2024.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Refuse stored</span></u><span style=\"font-size: 14px;\"> - No refuse or waste material of any description\r\nshall be left or stored anywhere on the site other than within a building or\r\nrefuse enclosure.</span></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To safeguard the appearance of the property and the\r\namenities of the area and to accord with Policies D3 and D6 of the London Plan\r\n2021and policy D12.3 of the Local Plan 2024.</span></p><p class=\"MsoNormal\"><o:p></o:p></p><p class=\"MsoNormal\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><o:p></o:p></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">No External Lighting</span></u><span style=\"font-size: 14px;\"> - No external lighting shall be installed without\r\nthe prior approval in writing of the Local Planning Authority.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify; margin-bottom: 0cm; line-height: normal;\"><span style=\"font-size:12.0pt;font-family:\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\">Reason:  </span><span style=\"font-size: 14px;\">To safeguard the amenities of the area and\r\nthe occupiers of neighbouring properties and ensure compliance with the\r\nfollowing Development Plan policies for Merton: policies D12.1 & D12.3 of\r\nthe Local Plan 2024.</span><o:p></o:p></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Construction Times (Minor Development)</span></u><span style=\"font-size: 14px;\"> - No demolition or construction work or ancillary\r\nactivities such as deliveries shall take place before 8am or after 6pm Mondays\r\n- Fridays inclusive, before 8am or after 1pm on Saturdays or at any time on\r\nSundays or Bank Holidays.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify; margin-bottom: 0cm; line-height: normal;\"><span style=\"font-size:12.0pt;font-family:\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\">Reason:  </span><span style=\"font-size: 14px;\">To safeguard the amenities of the area and\r\nthe occupiers of neighbouring properties and ensure compliance with the\r\nfollowing Development Plan policies for Merton: policies D14 and T7 of the\r\nLondon Plan 2021 and policies D12.1 & D12.3 of the Local Plan 2024.</span><o:p></o:p></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"line-height: 107%;\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Fire Strategy</span></u><span style=\"font-size: 14px;\"> - The development shall be carried out in\r\naccordance with the Fire Safety Strategy to be submitted to and be approved in writing by the Local Planning Authority prior to commencement of above ground works.&nbsp; The Strategy must fully comply with The Building Regulation\r\n2010 (as amended) unless otherwise approved in writing by the Local Planning\r\nAuthority.</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure that the development incorporates the\r\nnecessary fire safety measures in accordance with the Mayor's London Plan\r\nPolicy D12.</span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Tree Protection</span></u><span style=\"font-size: 14px;\"> -&nbsp;</span></span></span><span style=\"font-family: Arial, sans-serif; font-size: 10pt;\">The details and\r\nmeasures for the protection of the existing retained tree as specified in the\r\nhereby approved document ‘Arboricultural Impact Assessment Method Statement\r\n&amp; Tree Protection Plan (to BS5837:2012)’ dated ’31st October 2025' and\r\nreference 'TH 4333B' shall be fully complied with. The methods for the\r\nprotection of the existing trees shall fully accord with all of the measures\r\nspecified in the report and shall be installed prior to the commencement of any\r\nsite works and shall remain in place until the conclusion of all site works.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-family: Arial, sans-serif; font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason:</span></u><span style=\"font-size: 14px;\">&nbsp; </span></span><span style=\"font-family: Arial, sans-serif; font-size: 14px;\">To protect\r\nand safeguard the existing retained trees in accordance with the following\r\nDevelopment Plan policies for Merton: policy G7 of the London Plan 2021 and policies\r\nO15.1, O15.2 and O15.4 of the Local Plan 2024.</span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Provision of Vehicle Parking</span></u><span style=\"font-size: 14px;\"> - The vehicle parking area\r\n(including any garages hereby approved) shown on the approved plans shall be\r\nprovided before the commencement of the buildings or use hereby permitted and\r\nshall be retained for parking purposes for occupiers and users of the\r\ndevelopment and for no other purpose.</span></span></p><p class=\"MsoNormal\"><span style=\"line-height: 107%;\"><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure the provision of a satisfactory level of\r\nparking and comply with the following Development Plan policies for Merton:\r\npolicy T6 of the London Plan 2021 and policy T16.4 of the Local Plan 2024.</span></span></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Visibility Splays</span></u><span style=\"font-size: 14px;\"> - Prior to the occupation of the development 2 metre x\r\n2 metre pedestrian visibility splays shall be provided either side of the\r\nvehicular access to the site. Any objects within the visibility splays shall\r\nnot exceed a height of 0.6 metres.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In the interests of the safety of pedestrians and\r\nvehicles and to comply with the following Development Plan policies for Merton:\r\npolicies T16.3 and T16.4 of the Local Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Cycle Parking to be implemented</span></u><span style=\"font-size: 14px;\"> - The development hereby permitted shall\r\nnot be occupied until the cycle parking shown on the plans hereby approved has\r\nbeen provided and made available for use. These facilities shall be retained\r\nfor the occupants of and visitors to the development at all times.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure satisfactory facilities for cycle parking\r\nare provided and to comply with the following Development Plan policies for\r\nMerton: policy T5 of the London Plan 2021 and policies T16.1 and T16.2 of the\r\nLocal Plan 2024.</span></span><o:p></o:p></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Contaminated Land - Remedial Measures</span></u><span style=\"font-size: 14px;\"> - </span></span><span style=\"font-size: 14px;\">Prior to first occupation of the development hereby\r\napproved, the remediation measures agreed under Condition XX shall be completed\r\nand a verification report, produced on completion of the remediation, shall be\r\nsubmitted to and approved in writing by the local planning authority.</span></p><p style=\"text-align: justify;\"><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n\r\n\r\n</span><span style=\"line-height: 107%; font-size: 14px;\">together with the\r\nresults of analysis, risk assessment to any receptors and proposed remediation\r\nstrategy detailing proposals for remediation) have been submitted to and\r\napproved by the Local Planning Authority and the approved remediation\r\nmeasures/treatments implemented in full.</span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 2021 policy\r\nD12.1 of the Local Plan 2024.</span></span><o:p></o:p></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Unexpected Contamination </span></u><span style=\"font-size: 14px;\">- If during construction works\r\nfurther contamination is encountered which has not previously been identified\r\nand considered the Council's Environmental Health Section shall be notified\r\nimmediately and no further development shall take place until remediation\r\nproposals (detailing all investigative works and sampling, together with the\r\nresults of analysis, risk assessment to any receptors and proposed remediation\r\nstrategy detailing proposals for remediation) have been submitted to and\r\napproved by the Local Planning Authority and the approved remediation\r\nmeasures/treatments implemented in full.</span></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 2021 and policy\r\nD12.1 of the Local Plan 2024.</span></span><o:p></o:p></p>","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Boundary Treatment&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;No\r\nabove ground works excluding the strip out and demolition works associated with\r\nthe main building shall take place until details of all boundary walls or\r\nfences are submitted in writing for approval to the Local Planning Authority.\r\nNo works which are the subject of this condition shall be carried out until the\r\ndetails are approved, and the development shall not be occupied / the use of\r\nthe development hereby approved shall not commence until the details are\r\napproved and works to which this condition relates have been carried out in\r\naccordance with the approved details. The walls and fencing shall be&amp;nbsp;permanently\r\nretained thereafter.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:&quot; arial&quot;,sans-serif;=&quot;&quot; mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=&quot;&quot; en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure a satisfactory and safe development in accordance with\r\nthe following Development Plan policies for Merton: policies D4 and D8 of the\r\nLondon Plan 2021 and policies D12.1 and D12.3 of the Local Plan 2024&lt;/span&gt;&lt;s&gt;&lt;/s&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","<p style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">Hardstanding (Flooding) </span></u><span style=\"font-size: 14px;\">- The hardstanding hereby permitted shall be\r\nmade of porous materials, or provision made to direct surface water run-off to\r\na permeable or porous area or surface within the application site before the\r\ndevelopment hereby permitted is first occupied or brought into use.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  </span></span><span style=\"font-size: 14px;\">To reduce\r\nsurface water run-off and to reduce pressure on the surrounding drainage system\r\nin accordance with the following Development Plan policies for Merton: policy\r\nSI12 of the London Plan 2021 and policies F15.7, F15.8 and F15.9 of the Local\r\nPlan 2024.</span><span style=\"font-size: 14px;\"> </span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Sustainability (Water Consumption)</span></u><span style=\"font-size: 14px;\"> - No part of the development hereby\r\napproved shall be occupied until evidence has been submitted to, and approved\r\nin writing by, the Local Planning Authority confirming that the development has\r\nachieved internal water consumption rates of no greater than 105 litres per\r\nperson per day.</span></span></p><p><span style=\"line-height: 107%;\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure that the development achieves a high\r\nstandard of sustainability and makes efficient use of resources and to comply\r\nwith the following Development Plan policies for Merton: Policy SI 2 and SI 3\r\nof the London Plan 2021 and Policies CC2.1, CC2.2, CC2.3, CC2.4, CC2.5 and CC2.6\r\nof the Local Plan 2024.</span></span><o:p></o:p></p>","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Refuse & Recycling (Implementation) </span></u><span style=\"font-size: 14px;\">- The development hereby\r\napproved shall not be occupied until the refuse and recycling storage\r\nfacilities shown on the approved plans have been fully implemented and made\r\navailable for use. These facilities shall thereafter be retained for use at all\r\ntimes.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To ensure the provision\r\nof satisfactory facilities for the storage of refuse and recycling material and\r\nto comply with the following Development Plan policies for Merton: policies T4\r\nand T7 of the London Plan 2021 and policy \r\nW14.4 of the Local Plan 2024.  </span></span></span></p>","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Contaminated Land - Pre-liminary Risk Assessment, Site\r\nInvestigation and Remediation Method Statement &lt;/span&gt;&lt;/u&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/u&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;No\r\ndevelopment excluding the strip out and demolition works associated with the\r\nmain building shall occur until:&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;mso-margin-top-alt:auto;mso-margin-bottom-alt:auto;\r\ntext-align:justify&quot;&gt;&lt;span style=&quot;font-size:11.0pt;\r\nfont-family:&amp;quot;Arial&amp;quot;,sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;i) a preliminary risk-assessment has been submitted to and\r\napproved in writing by the local planning authority.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;ii) a site-investigation has been conducted to consider the\r\npotential for contaminated-land and has been submitted to and approved in\r\nwriting by the local planning authority.&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%; font-size: 14px;&quot;&gt;iii) a remediation method statement, described to make the\r\nsite suitable for, intended use by removing unacceptable risks to sensitive\r\nreceptors, has been submitted to and approved in writing by the local planning\r\nauthority.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 and policy D12.1\r\nof the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;o:p&gt;&lt;br&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Elevation Fixings</span></u><span style=\"font-size: 14px;\"> - No cables, wires, aerials, pipe work (except any\r\nrainwater down pipes as may be shown on the approved drawings) meter boxes or\r\nflues shall be fixed to any elevation facing a highway.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  To safeguard the\r\nappearance of the development and the visual amenities of the area and to\r\ncomply with the following Development Plan policies for Merton: policies D4 and\r\nD8 of the London Plan 2021 and policies D12.3 & D12.4</span></span><span style=\"font-size: 14px; line-height: 107%;\" aptos\",sans-serif;=\"\" mso-ascii-theme-font:minor-latin;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:\"times=\"\" new=\"\" roman\";=\"\" mso-bidi-theme-font:minor-bidi;mso-ansi-language:en-gb;mso-fareast-language:=\"\" en-us;mso-bidi-language:ar-sa\"=\"\">   </span><span style=\"font-size: 14px; line-height: 107%;\">of the Local Plan\r\n2024.</span></span></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><font face=\"Arial, sans-serif\"><span style=\"font-size: 14px;\"><u>Bird, bat and hedgehog features</u></span></font><span style=\"font-family: Arial, sans-serif; font-size: 14px;\"> </span><span style=\"font-family: Arial, sans-serif; font-size: 14px;\">- Prior to the first occupation of the\r\ndevelopment, details of the provision of bird boxes, bat boxes and hedgehog features\r\nshall be submitted to and agreed in writing by the Local Planning Authority.\r\nThe agreed details shall be installed prior to the first occupation of the\r\ndevelopment hereby permitted and shall be retained thereafter.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-family: Arial, sans-serif; font-size: 12pt;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: to protect\r\nand enhance the biodiversity of the development in the interest of nature\r\nconservation and to comply with the following development plan policies for\r\nMerton: policies G5 and G6 of the London Plan 2021 and policy O15.3 of the\r\nLocal Plan 2024. </span></span></p>","&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;﻿&lt;/span&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Surface Treatment&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;No\r\nabove ground works excluding the strip out and demolition works associated with\r\nthe main building shall take place until details of the surfacing of all those\r\nparts of the site not covered by buildings or soft landscaping, including any\r\nparking, service areas or roads, footpaths, hard and soft have been submitted\r\nin writing for approval by the Local Planning Authority. No works that are the\r\nsubject of this condition shall be carried out until the details are approved,\r\nand the development shall not be occupied / the use of the development hereby\r\napproved shall not commence until the details have been approved and works to\r\nwhich this condition relates have been carried out in accordance with the\r\napproved details.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To ensure a satisfactory\r\nstandard of development in accordance with the following Development Plan\r\npolicies for Merton: policy D4 of the London Plan 2021 and policies D12.1 and\r\nD12.3 of the Local Plan 2024&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","<p style=\"text-align: justify; \"><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">Site Supervision (Trees) </span></u><span style=\"font-size: 14px;\">-&nbsp;</span></span><span style=\"font-family: Arial, sans-serif; font-size: 10pt;\">The details of the\r\napproved document ‘Arboricultural Impact Assessment Method Statement &amp; Tree\r\nProtection Plan (to BS5837:2012)' shall include the retention of an\r\narboricultural expert to monitor and report to the Local Planning Authority not\r\nless than monthly the status of all tree works and tree protection measures\r\nthroughout the course of the demolition and site works. A final Certificate of\r\nCompletion shall be submitted to&nbsp;and agreed in writing by&nbsp;the Local\r\nPlanning Authority at the conclusion of all site works&nbsp;and prior to the\r\nfirst occupation of the development hereby approved. The works shall be carried\r\nout in accordance with the approved Arboricultural Method Statement and Tree\r\nProtection Plan.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:&nbsp; </span></span><span style=\"font-size: 14px;\">To protect\r\nand safeguard the existing retained trees in accordance with the following\r\nDevelopment Plan policies for Merton: policy G7 of the London Plan 2021 and policies\r\nO15.1, O15.2 and O15.4 of the Local Plan 2024.&nbsp;</span></span><o:p></o:p></p>","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Sustainable Drainage</span></u><span style=\"font-size: 14px;\"> - No above ground works shall be commenced until a scheme for the provision of surface water\r\ndrainage has been implemented in accordance with details that have been\r\nsubmitted to and approved in writing by the local planning authority. Before\r\nthese details are submitted an assessment shall be carried out of the potential\r\nfor disposing of surface water by means of a sustainable drainage system (SuDS)\r\nto ground, watercourse or sewer in accordance with drainage hierarchy contained\r\nwithin the London Plan Policy 5.13 and the advice contained within the National\r\nSuDS Standards. Where a sustainable drainage scheme is to be provided, the\r\nsubmitted details shall:</span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">&nbsp;&nbsp; i. provide\r\ninformation about the design storm period and intensity, the method employed to\r\ndelay (attenuate) and control the rate of surface water discharged from the\r\nsite as close to greenfield runoff rates (8l/s/ha) as reasonably practicable\r\nand the measures taken to prevent pollution of the receiving groundwater and/or\r\nsurface waters; </span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><span style=\"font-size: 14px;\">&nbsp;&nbsp; ii.&nbsp; include a timetable for its implementation;\r\nand </span><o:p></o:p></span></p><p style=\"text-align: justify;\"><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n\r\n\r\n</span><span style=\"line-height: 107%; font-size: 14px;\">&nbsp;&nbsp; iii. provide a management and maintenance\r\nplan for the lifetime of the development which shall include the arrangements\r\nfor adoption by a public authority or&nbsp;statutory undertaker and any other arrangements to secure the operation\r\nof the scheme throughout its lifetime.</span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To ensure satisfactory means of surface water\r\ndrainage, to reduce the risk of flooding and to comply with the following\r\nDevelopment Plan policies for Merton: policy SI 13 of the London Plan 2021 and\r\npolicies F15.7, F15.8 and F15.9 of the Local Plan 2024.</span></span><o:p></o:p></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\" arial\",sans-serif;=\"\" mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=\"\" en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa\"=\"\"><br></span></p>","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span&gt;﻿&lt;/span&gt;&lt;span style=&quot;font-size: 11px;&quot;&gt;﻿&lt;/span&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Materials to be Approved&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;No\r\nabove ground works excluding the strip out and demolition works associated with\r\nthe main building shall take place until details of particulars and samples of\r\nthe materials to be used on all external faces of the development hereby\r\npermitted, including replacement metal railings, window frames and doors\r\n(notwithstanding any materials specified in the application form and/or the\r\napproved drawings), have been submitted to the Local Planning Authority for\r\napproval. No works which are the subject of this condition shall be carried out\r\nuntil the details are approved, and the development shall be carried out in\r\nfull accordance with the&amp;nbsp;approved details.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;mso-margin-top-alt:auto;mso-margin-bottom-alt:auto;\r\ntext-align:justify&quot;&gt;&lt;span style=&quot;font-size:\r\n11.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure a satisfactory appearance of the development and to\r\ncomply with the following Development Plan policies for Merton: policies D4 and\r\nD8 of the London Plan 2021, policies D12.1 and D12.3 of the Local Plan 2024 .&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","<p class=\"MsoNormal\" style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><u><span style=\"font-size: 14px;\">Air Quality</span></u><span style=\"font-size: 14px;\"> - All Non-Road Mobile Machinery (NRMM) of net\r\npower of 37kW and up to and including 560kW used during the course of the\r\ndemolition, site preparation and construction phases shall comply with the\r\nemission standards set out in chapter 7 of the GLA's supplementary planning\r\nguidance \"Control of Dust and Emissions During Construction and\r\nDemolition\" dated July 2014 (SPG), or subsequent guidance. </span><o:p></o:p></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\">Unless it complies with the standards set out in the SPG,\r\nno NRMM shall be on site, at any time, whether in use or not, without the prior\r\nwritten consent of the local planning authority. The developer shall keep an up\r\nto date list of all NRMM used during the demolition, site preparation and\r\nconstruction phases of the development on the online register at\r\nhttps://nrmm.London/</span><o:p></o:p></span></p><p style=\"text-align: justify;\"><span style=\"font-size: 14px;\">\r\n\r\n\r\n\r\n</span><span style=\"font-size:12.0pt;line-height:107%;font-family:\" arial\",sans-serif;=\"\" mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=\"\" en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">: To comply\r\nwith Policy SI1 of the London Plan 2021 and Policy P15.10 of the Local Plan\r\n2024.</span></span></p>","<p style=\"text-align: justify; \"><span style=\"font-size: 14px;\">﻿</span><span style=\"font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;\"><u><span style=\"font-size: 14px;\">Landscape Management Plan</span></u><span style=\"font-size: 14px;\"> - Prior to the occupation of the development a\r\nlandscape management plan including long term design objectives, management\r\nresponsibilities and maintenance schedules for all landscaped areas, other than\r\nsmall, privately owned, domestic gardens, shall be submitted to and approved in\r\nwriting by the Local Planning Authority. The landscape management plan shall be\r\ncarried out in accordance with the approved scheme unless otherwise agreed in\r\nwriting by the Local Planning Authority.</span></span></p><p><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"></span></p><p class=\"MsoNormal\" style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;font-family:\r\n\" arial\",sans-serif\"=\"\"><span style=\"font-size: 14px;\"><u><span style=\"font-size: 14px;\">Reason</span></u><span style=\"font-size: 14px;\">:  </span></span><span style=\"font-size: 14px;\">To ensure\r\nthe appearance of the development is maintained in the interest of the\r\namenities of the area, to ensure the maintenance of sustainable drainage\r\nsurfaces and to comply with the following Development Plan policies for Merton:\r\npolicies SI 12 and SI 13 of the London Plan 2021 and policies O15.1, O15.2,\r\nO15.3, O15.4, O15.5 and F15.7, F15.8 and F15.9 of the Local Plan 2024. </span></span><o:p></o:p></p>","&lt;p&gt;&lt;u style=&quot;font-size: 16px; text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Garage Doors - Remain Closed&lt;/span&gt;&lt;/u&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;The garage doors serving the parking spaces as illustrated on drawing P2411-528-Proposed Dwelling - Side (West) Elevation shall remain in a closed/shut position when not in use to facilitate the access/egress of any motor vehicles using the parking spaces.&lt;/p&gt;&lt;p&gt;&lt;u style=&quot;font-size: 16px; text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;text-align: justify;&quot;&gt;: To ensure a satisfactory appearance of the development and to comply with the following Development Plan policies for Merton: policies D4 and D8 of the London Plan 2021, policies D12.1 and D12.3 of the Local Plan 2024 .&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;Demolition and Construction Environmental Management Plan (DCEMP)&amp;nbsp;&lt;/u&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Prior to the commencement of development, including demolition, a detailed Demolition and Construction Environmental Management Plan (DCEMP) shall be submitted to and approved in writing by the Local Planning Authority. The Plan shall be written in accordance with The Control of Dust and Emissions during Construction and Demolition SPG 2014. The DCEMP shall provide for:&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-hours of working (which shall be limited to 08.00 to 18.00 Mondays to Fridays and between 08.00 to 13.00 on Saturdays and not at all on Bank Holidays and Sundays)&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-delivery times and management procedures&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-means of enclosure of the site&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-provision to accommodate site workers/operatives, visitors and construction&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;vehicles&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;- demolition/construction vehicle routing&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-protocols for managing vehicles that require access to the site&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-loading and unloading arrangements of plant and materials&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-storage of plant and materials used in constructing the development&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-the erection and maintenance of security hoarding including decorative - displays&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;and facilities for public viewing, where appropriate&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-wheel washing facilities&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-measures to control the emission of noise and vibration during construction.&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-measures to control the emission of dust, dirt and other air emissions during construction/demolition and groundworks as part of a Dust Management Plan (DMP) based on the approved Air Quality Assessment, shall be submitted to and approved,&amp;nbsp; in writing, by the local planning authority. The DMP shall be in accordance with The &quot;Control of Dust and Emissions During Construction and Demolition&quot; dated July 2014 (SPG). The DMP will need to detail the measures to reduce the impacts during the construction stage.&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-measures to control surface water run-off&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-a scheme for recycling/disposing of waste resulting from demolition and construction works&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;-&amp;nbsp;detail how retained habitats will be suitably protected during the proposed works.&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;- details of all construction lighting to be installed&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure the safety of pedestrians and vehicles\r\nand the amenities of the surrounding area and ecological enhancement and to comply with the following\r\nDevelopment Plan policies for Merton: policies T4 and T7 of the London Plan\r\n2021 and policies T16.3 and T16.4 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size: 14px; line-height: 107%; font-family: Arial, sans-serif;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Landscaping&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 10.5pt;&quot;&gt;Prior\r\nto commencement of above ground works excluding the strip out and demolition\r\nworks associated with the main building full details of a landscaping and\r\nplanting scheme including the plating of 49 trees, shall be submitted to and\r\napproved in writing by the Local Planning Authority and these works shall be\r\ncarried out as approved before the commencement of the use or the occupation of\r\nany building hereby approved, unless otherwise agreed in writing by the Local\r\nPlanning Authority. The details shall include on a plan, full details of the\r\nsize, species, spacing, quantities and location of proposed plants, together\r\nwith any hard surfacing, means of enclosure, and indications of all existing\r\ntrees, hedges and any other features to be retained, and measures for their\r\nprotection during the course of development.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align:justify&quot;&gt;&lt;span style=&quot;font-size:11.0pt;\r\nfont-family:&amp;quot;Arial&amp;quot;,sans-serif&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; &lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;To enhance\r\nthe appearance of the development in the interest of the amenities of the area,\r\nto ensure the provision sustainable drainage surfaces and to comply with the\r\nfollowing Development Plan policies for Merton: policies G7 and D8 of the\r\nLondon Plan 2021 and policies F15.7, F15.8, O15.1, O15.2 &lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;and O15.4 of the Local Plan 2024.&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;Level1Heading&quot;&gt;&lt;!--[if !supportLists]--&gt;&lt;span style=&quot;font-size:11.0pt;line-height:115%;mso-fareast-font-family:Calibri;\r\nmso-fareast-language:EN-US&quot;&gt;&lt;u&gt;Habitat Management and Monitoring Plan&lt;/u&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;Level1Heading&quot;&gt;&lt;span style=&quot;font-size:11.0pt;line-height:115%;\r\nmso-fareast-font-family:Aptos;mso-fareast-theme-font:minor-latin;mso-fareast-language:\r\nEN-US&quot;&gt;1.&amp;nbsp;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 11pt;&quot;&gt;No above ground works\r\nexcluding the strip out and demolition works associated with the main building shall\r\ncommence until a Habitat Management and Monitoring Plan (the HMMP)], prepared\r\nin accordance with the approved Biodiversity Gain Plan has been submitted to,\r\nand approved in writing by, the local planning authority and including:&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;&lt;!--[if !supportLists]--&gt;1.1&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &amp;quot;Times New Roman&amp;quot;;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;a non-technical\r\nsummary;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;&lt;!--[if !supportLists]--&gt;1.2&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &amp;quot;Times New Roman&amp;quot;;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;the roles and\r\nresponsibilities of the people or organisation(s) delivering the [HMMP];&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;&lt;!--[if !supportLists]--&gt;1.3&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &amp;quot;Times New Roman&amp;quot;;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;the planned\r\nhabitat creation and enhancement works to create or improve habitat to achieve\r\nthe biodiversity net gain in accordance with the approved Biodiversity Gain\r\nPlan;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;&lt;!--[if !supportLists]--&gt;1.4&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &amp;quot;Times New Roman&amp;quot;;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;the management\r\nmeasures to maintain habitat in accordance with the approved Biodiversity Gain\r\nPlan for a period of 30 years from the completion of development; and&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;&lt;!--[if !supportLists]--&gt;1.5&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; font-size: 7pt; line-height: normal; font-family: &amp;quot;Times New Roman&amp;quot;;&quot;&gt;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;&amp;nbsp;\r\n&lt;/span&gt;&lt;!--[endif]--&gt;the monitoring\r\nmethodology and frequency in respect of the created or enhanced habitat to be\r\nsubmitted to the local planning authority.&lt;/p&gt;&lt;p class=&quot;Level1Heading&quot;&gt;&lt;span style=&quot;font-size:11.0pt;line-height:115%;\r\nmso-fareast-font-family:Aptos;mso-fareast-theme-font:minor-latin;mso-fareast-language:\r\nEN-US&quot;&gt;2. Notice in writing shall be given to the Council when the [HMMP] works\r\nhave started.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;Level1Heading&quot;&gt;&lt;span style=&quot;line-height: 115%;&quot;&gt;&lt;span style=&quot;font-variant-numeric: normal; font-variant-east-asian: normal; font-variant-alternates: normal; font-size-adjust: none; font-language-override: normal; font-kerning: auto; font-optical-sizing: auto; font-feature-settings: normal; font-variation-settings: normal; font-variant-position: normal; font-variant-emoji: normal; font-stretch: normal; line-height: normal; font-size: 14.6667px;&quot;&gt;3.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-size:11.0pt;line-height:115%;\r\nmso-fareast-font-family:Aptos;mso-fareast-theme-font:minor-latin;mso-fareast-language:\r\nEN-US&quot;&gt;The created and/or enhanced habitat specified in the approved [HMMP]\r\nshall be managed and maintained in accordance with the approved [HMMP].&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;Level1Heading&quot;&gt;&lt;span style=&quot;font-size:11.0pt;line-height:115%;\r\nmso-fareast-font-family:Aptos;mso-fareast-theme-font:minor-latin;mso-fareast-language:\r\nEN-US&quot;&gt;4.&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-family: Calibri, sans-serif; font-size: 11pt;&quot;&gt;Monitoring reports shall be submitted to local\r\nplanning authority in writing in accordance with the methodology and frequency\r\nspecified in the approved [HMMP].&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;Level2Number&quot;&gt;REASON: To safeguard biodiversity within the Borough.&lt;/p&gt;"],"actual_commencement_date":null,"pp_id":"PP-14567308","decision_target_date":"16/02/2026","valid_date":"22/12/2025","lpa_app_no":"25/P3804","locality":"Wimbledon","appeal_decision_date":null,"parking_details":{"no_existing_cycle":0,"no_proposed_cycle":14,"net_cycle":14},"decision_process":null,"street_name":"KINGSTON ROAD","last_synced":"2026-07-02T03:20:09.971Z","site_number":"152","centroid_easting":null,"polygon":{"geometries":[{"coordinates":[[[524995.95,169839.25],[525000,169841.65],[525001.8,169841.4],[525012.5,169846.5],[525012,169847.5],[525022.55,169852.55],[525024.15,169849.1],[525019.9,169847.1],[525020.85,169845.1],[525021.7,169845.5],[525024.98,169838.46],[525007.56,169830.21],[525005.7,169834.15],[525004.75,169833.7],[525003.7,169831.75],[525002.25,169831.25],[525000,169832.5],[524999.35,169832.15],[524995.95,169839.25]]],"type":"Polygon"}],"type":"geometrycollection"},"ward":"Merton Park","centroid_northing":null,"application_type":"All Other","uprn":"48082709","lapsed_date":"15/04/2029","actual_completion_date":null,"decision":"Approved","site_name":"DORSET HALL","borough":"Merton","last_date_consultation_comments":"06/05/2026","application_type_full":"Full planning & listed building consent","url_planning_app":"https://rspandlp.merton.gov.uk//planning/index.html?fa=getApplication&id=259081","decision_date":"15/04/2026","bo_system":"Portal","development_type":"Minor dwellings","appeal_status":null,"date_building_work_completed_under_previous_permission":null,"description":"CREATION OF TWO NEW RESIDENTIAL UNITS ALONGSIDE A SCHEME OF REPAIR AND RESTORATION TO DORSET HALL WITH MINOR EXTENSIONS TO TWO EXISTING RESIDENTIAL FLATS. ","appeal_decision":null,"date_building_work_started_under_previous_permission":null,"epc_number":null,"last_updated":"2026-07-01T07:15:18.937Z","centroid":{"lon":-7.55716,"lat":49.766807},"lpa_name":"Merton","secondary_street_name":null,"application_details":{"affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"12/2026","intended_commencement_date":"03/2026"}],"total_gia_gained":265,"site_area":0.2063,"total_gia_existing":676,"total_gia_lost":88,"existing_proposed_floorspace_details":[{"gia_existing":676,"gia_gained":265,"use_class":"C3","gia_lost":88}],"projected_cost_of_works":"Between £2m and £100m","scheme_phasing":true,"rain_water_harvesting":true,"grey_water_reuse":false,"building_details":[{"no_storeys":2,"max_height":3,"building_ref":"New build in place of former garages "}],"green_suds":true,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":265,"total_gia_existing":676,"total_gia_lost":88},"garden_land_lost":false,"residential_details":{"total_no_proposed_residential_units_shared_equity":0,"total_no_proposed_bedrooms":5,"total_no_proposed_residential_units":2,"total_no_proposed_residential_units_london_living_rent":0,"total_no_proposed_residential_affordable_units":0,"total_no_proposed_residential_units_affordable_rent":0,"total_no_existing_residential_units":0,"total_no_proposed_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_london_living_rent":0,"total_no_existing_residential_units_shared_equity":0,"total_no_existing_residential_units_market_for_sale":0,"total_no_existing_residential_units_intermediate":0,"total_no_proposed_residential_units_market_for_rent":0,"total_no_existing_residential_units_social_rent":0,"total_no_proposed_residential_units_self_build_and_custom_build":0,"total_no_existing_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_market_for_sale":2,"total_no_existing_residential_affordable_units":0,"total_no_existing_residential_units_affordable_rent":0,"habitable_rooms_density":null,"total_no_existing_residential_units_london_shared_ownership":0,"total_gia_gained":186,"total_no_proposed_residential_units_social_rent":0,"total_no_existing_residential_units_london_affordable_rent":0,"dwelling_density":0,"total_no_existing_residential_units_discount_market_sale":0,"total_no_proposed_residential_units_starter_homes":0,"total_no_proposed_residential_units_london_affordable_rent":0,"total_gia_lost":0,"total_no_existing_residential_units_discount_market_rent_charged_at_london_rents":0,"total_no_existing_residential_units_starter_homes":0,"total_no_proposed_residential_units_discount_market_rent":0,"total_no_proposed_residential_units_intermediate":0,"affordable_percentage":0.0,"total_no_proposed_residential_units_london_shared_ownership":0,"residential_units":[{"provider":"Private","no_habitable_rooms":4,"change_type":"Gain","unit_type":"Semi Detached Home","no_bedrooms":2,"tenure":"Market for sale","gia":82},{"provider":"Private","no_habitable_rooms":5,"change_type":"Gain","unit_type":"Flat Apartment Maisonette","no_bedrooms":3,"tenure":"Market for sale","gia":104}],"total_no_existing_residential_units_market_for_rent":0,"total_no_existing_residential_units_self_build_and_custom_build":0},"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"green_roof_area":0,"no_resi_units_to_have_full_fibre":12,"no_new_water_connections_required":0,"no_homes_passive_cooling":0,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":true,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":true},"ownership_status":"Private","non_permanent_dwellings_details":[{"type":"Traveller pitches/plots"},{"type":"Houseboat moorings"},{"type":"Non-permanent dwellings"}],"other_residential_accommodation_details":{"other_resi_accommodation_unit_details":[{"unit_type":"Hostel Room"},{"unit_type":"Hotel Room"},{"unit_type":"Apart-Hotel Room"},{"unit_type":"Secure Residential Room"}]}},"wgs84_polygon":{"coordinates":[[[-0.204001,51.413803],[-0.203942,51.413824],[-0.203917,51.413821],[-0.203761,51.413865],[-0.203768,51.413874],[-0.203614,51.413917],[-0.203593,51.413885],[-0.203654,51.413868],[-0.203641,51.41385],[-0.203629,51.413854],[-0.203584,51.41379],[-0.203838,51.413719],[-0.203863,51.413755],[-0.203877,51.413751],[-0.203893,51.413734],[-0.203914,51.41373],[-0.203946,51.413741],[-0.203955,51.413738],[-0.204001,51.413803]]],"type":"Polygon"},"id":"Merton-25_P3804","reference_no_of_permission_being_relied_on":null,"title_number":null,"last_updated_by":"Planning Portal ingest"}