{"site_name":null,"lapsed_date":"21/09/2029","appeal_decision":null,"decision_agency":"Borough","last_synced":"2026-10-07T02:04:01.274Z","bo_system":"Portal","lpa_app_no":"26/FULL/0673","valid_date":"13/04/2026","title_number":null,"epc_number":"7191-5908-1555-3024-7588","application_details":{"other_residential_accommodation_details":{"other_resi_accommodation_unit_details":[{"unit_type":"Hostel Room"},{"unit_type":"Hotel Room"},{"unit_type":"Apart-Hotel Room"},{"unit_type":"Secure Residential Room"}],"site_area":1.61},"site_area":1.61,"non_permanent_dwellings_details":[{"type":"Traveller pitches/plots"},{"type":"Houseboat moorings"},{"type":"Non-permanent dwellings"}],"existing_proposed_floorspace_details":[{"gia_existing":null,"use_class":"A1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A3","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1a","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1b","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1c","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B8","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"C1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"C2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"D1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"D2","gia_gained":null,"gia_lost":null}],"superseding_details":[{"lpa_app_no":"99/P1483","partial_supersedence":false}],"affordable_housing_fast_track":false,"total_gia_existing":13363,"projected_cost_of_works":"Between £2m and £100m","scheme_phasing":true,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":13363,"total_gia_gained":10527,"total_gia_lost":13363,"total_gia_existing":13363},"internal_resi_water_usage":0,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":0.1,"solar_pv_capacity":0.34,"no_homes_passive_cooling":0,"no_new_water_connections_required":4,"no_non_resi_units_to_have_full_fibre":4,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"no_active_other_ev_charging_points":18,"no_passive_other_ev_charging_points":52,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":4,"chp_heat_pumps_capacity":0,"ghg_reduction_over_building_regulations":true},"phasing_details":[{"phase_detail":"Entire Development","intended_completion_date":"06/2027","intended_commencement_date":"10/2026"}],"total_gia_gained":10527,"total_gia_lost":13363,"scheme_name":"Deer Park, Wimbledon","occupation_status":"Vacant","rain_water_harvesting":false,"building_details":[{"no_storeys":2,"max_height":13.8,"building_ref":"Proposed Industrial Building "}],"grey_water_reuse":false,"surface_water_discharge_percentage_reduction":99,"green_suds":true,"garden_land_lost":false,"ownership_status":"Private","lead_developer_company_name":"Wrenbridge "},"centroid_easting":526218,"decision_process":"Delegated","wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.186276,51.411021],[-0.186259,51.411014],[-0.186195,51.411],[-0.185986,51.410996],[-0.185897,51.410998],[-0.185874,51.410999],[-0.185875,51.41099],[-0.185889,51.410814],[-0.185895,51.410725],[-0.185907,51.410564],[-0.185962,51.409797],[-0.185972,51.409658],[-0.185994,51.409359],[-0.186122,51.409361],[-0.186493,51.409368],[-0.187163,51.409382],[-0.187251,51.409384],[-0.187248,51.409433],[-0.18724,51.409523],[-0.187223,51.40978],[-0.187221,51.409837],[-0.187185,51.410358],[-0.187184,51.410421],[-0.187155,51.410909],[-0.187135,51.410951],[-0.187094,51.410993],[-0.187033,51.411022],[-0.186937,51.411041],[-0.186816,51.411039],[-0.186691,51.411035],[-0.186599,51.411031],[-0.186276,51.411021]]]},"reference_no_of_permission_being_relied_on":"99/P1483","appeal_start_date":null,"decision_target_date":"13/07/2026","actual_commencement_date":null,"parking_details":{"no_existing_car":80,"net_car":-10,"no_proposed_car":70},"last_date_consultation_comments":"21/05/2026","url_planning_app":"https://rspandlp.merton.gov.uk//planning/index.html?fa=getApplication&id=272943","last_updated":"2026-10-06T12:26:58.304Z","application_type":"All Other","site_number":"1","lpa_name":"Merton","application_type_full":"Full planning permission","centroid_northing":169468,"actual_completion_date":null,"cil_liability":null,"subdivision_of_building":null,"decision_conditions":["&lt;p style=&quot;text-align: justify; &quot;&gt;Demolition Logistics Plan - Prior to the commencement of the development hereby permitted, a Demolition Logistics Plan shall be submitted to and approved in writing by the Local Planning Authority in consultation with TFL.&amp;nbsp; The approved measures shall be adhered to throughout the demolition process, unless the prior written approval of the Local Planning Authority is first obtained to any variation.&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Reason: To ensure the safety of pedestrians and vehicles and the amenities of the surrounding area and to comply with the following Development Plan policies for Merton: policies T4 and T7 of the London Plan 2021 and policies T16.3 and T16.4 of the Local Plan 2024.&lt;/p&gt;&lt;div style=&quot;text-align: justify;&quot;&gt;&lt;br&gt;&lt;/div&gt;","&lt;p&gt;&lt;b&gt;BREEAM – Pre-Occupation&amp;nbsp;&lt;/b&gt;&lt;/p&gt;&lt;p&gt;No part of the development hereby approved shall be used or occupied until a Post-Construction Review Certificate issued by the Building Research Establishment or other equivalent assessors confirming that the non-residential development has achieved a BREEAM rating of not less than the standards equivalent to ‘Excellent’ has been submitted to and approved in writing by the Local Planning Authority.’&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;b&gt;Reason:&lt;/b&gt; To ensure that the development achieves a high standard of sustainability and makes efficient use of resources and to comply the following Development Plan policies for Merton: policy CC2.6 of Merton’s Local Plan 2024.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size: 11px;&quot;&gt;NRMM&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 11px;&quot;&gt;All Non-Road Mobile Machinery (NRMM) of net power of 37kW and up to and including 560kW used during the course of the demolition, site preparation and construction phases shall comply with the emission standards set out in chapter 7 of the GLA&#x27;s supplementary planning guidance &quot;Control of Dust and Emissions During Construction and Demolition&quot; dated July 2014 (SPG), or subsequent guidance. Unless it complies with the standards set out in the SPG, no NRMM shall be on site, at any time, whether in use or not, without the prior written consent of the local planning authority. The developer shall keep an up to date list of all NRMM used during the demolition, site preparation and construction phases of the development on the online register at https://nrmm.london/&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 11px;&quot;&gt;Reason: To manage and prevent further deterioration of existing low quality air across London in accordance with London Plan Policies SI1(B)(1c) and SI1(B)(2d).&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;No unit shall be occupied until the vehicle parking spaces associated with that unit have been laid out and made available for parking purposes in accordance with the approved plans. The parking spaces shall thereafter be retained for the parking of vehicles by occupiers and users of that unit and shall not be used for any other purpose.&lt;/p&gt;&lt;p&gt;Reason: To ensure the safety of pedestrians and vehicles and the amenities of the surrounding area and to comply with the following Development Plan policies for Merton: policies T4 and T7 of the London Plan 2021 and policy T16.4 of Merton Local Plan 2024.&lt;/p&gt;","&lt;p&gt;Active and passive Electric Vehicle (EV) charging infrastructure shall be installed in accordance with approved Site Plan W063-CMP-SI-ZZ-DR-A-00100 (Rev PL1), which provides for 20 active EV charging points. The EV charging infrastructure associated with the parking spaces serving each individual commercial unit shall be installed and made available for use prior to the first occupation of that commercial unit. The infrastructure shall thereafter be retained and maintained for that purpose.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;Prior to the first occupation of each unit, a Delivery and Servicing Plan shall be submitted to and approved in writing by the Local Planning Authority in consultation with TFL for the relevant unit.&amp;nbsp; The approved Plan shall be implemented upon the first occupation of the relevant unit and shall thereafter be adhered to for the lifetime of the development.&lt;/p&gt;&lt;p&gt;Reason: To ensure the safety of pedestrians and vehicles and to safeguard the amenities of the surrounding area, in accordance with Policies T4 and T7 of the London Plan 2021 and Policy T16.4 of the Merton Local Plan 2024.&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Contaminated Land - Pre-liminary Risk Assessment, Site\r\nInvestigation and Remediation Method Statement &lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;-&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;No development (other than above ground demolition) shall occur until:&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;i) a preliminary risk-assessment has been submitted to and\r\napproved in writing by the local planning authority.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;ii) a site-investigation has been conducted to consider the\r\npotential for contaminated-land and has been submitted to and approved in\r\nwriting by the local planning authority.&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%; font-size: 14px;&quot;&gt;iii) a remediation method statement, described to make the\r\nsite suitable for, intended use by removing unacceptable risks to sensitive\r\nreceptors, has been submitted to and approved in writing by the local planning\r\nauthority.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: In order to protect the health of future occupiers\r\nof the site and adjoining areas in accordance with the following Development\r\nPlan policies for Merton: policy SI 10 of the London Plan 2021 and policy D12.1\r\nof the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;o:p&gt;&lt;br&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot;&gt;&lt;b&gt;NON-RESIDENTIAL CO2 REDUCTIONS – Pre-occupation&lt;/b&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;No part of the development hereby approved shall be used or occupied until evidence demonstrating that the development has achieved CO2 reductions in accordance with those outlined in the energy statement (Energy and Sustainability &amp;amp; Overheating Statement. Dated 13.04.2026), has been submitted to and approved by the Local Planning Authority.’&amp;nbsp;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot;&gt;Reason: To ensure that the development achieves a high\r\nstandard of sustainability and makes efficient use of resources and to comply\r\nwith the following Development Plan policies for Merton: polices SI 2, SI 3 and\r\nSI 5 of the London Plan 2021 and policies CC2.1, CC2.2, CC2.3, CC2.4, CC2.5 and\r\nCC2.6 of the Local Plan 2024.&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p&gt;&lt;b&gt;Non-domestic District Heating Networks – Pre-commencement&amp;nbsp;&lt;/b&gt;&lt;/p&gt;&lt;p&gt;No development shall commence (excluding demolition) until evidence demonstrating that the development has been designed to enable connection of the site to an existing or future district heating network has been submitted to and approved by the Local Planning Authority. The details shall be designed in accordance with the Technical Standards of the London Heat Network Manual (2021).’ The development shall be implemented in accordance with the approved details.&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;b&gt;Reason: &lt;/b&gt;To demonstrate that the site heat network has been designed to link all building uses on site (domestic and non-domestic), and to demonstrate that sufficient space has been allocated in the plant room for future connection to wider district heating, in accordance with London Plan policies SI2 and SI3.&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;Drainage Maintenance and Management Plan - The development shall not be occupied until a maintenance and management plan for the implemented drainage system is submitted to and approved by the Local Planning Authority.&lt;/p&gt;&lt;p&gt;The approved plan shall thereafter be implemented for the lifetime of the development.&lt;/p&gt;","&lt;p&gt;No below ground excavation or demolition shall take place until a stage 1 written scheme of investigation (WSI) has been submitted to and approved by the local planning authority in writing. For land that is included within the WSI, no below ground demolition or excavation shall take place other than in accordance with the agreed WSI, and the programme and methodology of site evaluation and the nomination of a competent person(s) or organisation to undertake the agreed works.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;If heritage assets of archaeological interest are identified by stage 1 then for those parts of the site which have archaeological interest a stage 2 WSI shall be submitted to and approved by the local planning authority in writing. For land that is included within the stage 2 WSI, no below ground&amp;nbsp; demolition/excavation/development shall take place other than in accordance with the agreed stage 2 WSI which shall include:&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;A. The statement of significance and research objectives, the programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;B. Where appropriate, details of a programme for delivering related positive public benefits&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;C. The programme for post-investigation assessment and subsequent analysis, publication &amp;amp; dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the stage 2 WSI.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;Reason:&amp;nbsp;The application site is located within a Tier II Archaeological Priority Area, and to comply with NPPF Section16 and London Plan policy HC1.&amp;nbsp;&lt;/p&gt;","&lt;p&gt;Construction Environmental Management Plan (CEMP) -&lt;/p&gt;&lt;p&gt;Prior to the commencement of development (excluding demolition), a detailed Construction Environmental Management Plan (CEMP) shall be submitted to and approved in writing by the Local Planning Authority. The CEMP shall&lt;/p&gt;&lt;p&gt;include:&lt;/p&gt;&lt;p&gt;a)Air Quality &amp;amp; Dust Management Plan (AQDMP), based on the approved Air Quality Assessment. The AQDMP shall be in accordance with The &quot;Control of Dust and Emissions During Construction and Demolition&quot; dated July 2014 (SPG). The AQDMP will need to detail the measures to reduce the impacts during the construction phase.&lt;/p&gt;&lt;p&gt;b) Construction Management Plan (CMP) identifying:&lt;/p&gt;&lt;p&gt;-Hours of operation&lt;/p&gt;&lt;p&gt;-The parking of vehicles of site operatives and visitors&lt;/p&gt;&lt;p&gt;- Loading and unloading of plant and materials&lt;/p&gt;&lt;p&gt;- Storage of plant and materials used in constructing the development&lt;/p&gt;&lt;p&gt;- The erection and maintenance of security hoarding including decorative&lt;/p&gt;&lt;p&gt;displays and facilities for public viewing, where appropriate&lt;/p&gt;&lt;p&gt;- Wheel washing facilities&lt;/p&gt;&lt;p&gt;- Measures to control and monitor the emission of noise and vibration during&lt;/p&gt;&lt;p&gt;construction&lt;/p&gt;&lt;p&gt;- demonstration to show compliance with BS5228&lt;/p&gt;&lt;p&gt;- measures to control the emission of dust and dirt during construction&lt;/p&gt;&lt;p&gt;The development shall not be implemented other than in accordance with the approved scheme, unless previously agreed in writing by the Local Planning Authority.&lt;/p&gt;&lt;p&gt;Reason: To ensure the safety of pedestrians and vehicles and the amenities of the surrounding area and to comply with the following Development Plan policies for Merton: policies T4 and T7 of the London Plan 2021 and policies T16.3 and T16.4 of Merton Local Plan 2024.&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;","&lt;p&gt;&lt;b&gt;Whole Life Carbon Assessment -Pre-Occupation&amp;nbsp;&lt;/b&gt;&lt;/p&gt;&lt;p&gt;&amp;nbsp;Prior to the occupation of the development (excluding demolition), the post-construction tab of the GLA’s Whole Life-Cycle Carbon Assessment Template shall be completed in line with the GLA’s Whole Life-Cycle Carbon Assessment Guidance. Together with any supporting information, the Whole Life Carbon Assessment shall be submitted to, and approved in writing by the Local Planning Authority.&amp;nbsp;&lt;/p&gt;&lt;p&gt;&lt;b&gt;Reason: &lt;/b&gt;To ensure that the development achieves a high standard of sustainability and makes efficient use of resources and to comply with the following Development Plan policies for Merton: Policy SI2 of the London Plan 2021 and Policies CC2.6 of Merton&#x27;s Local Plan 2024.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;","&lt;p&gt;External Lighting - No part of the development hereby approved shall be used or occupied until the external lighting has been installed in accordance with the External Lighting Assessment Report Revision PL2 dated 25 March 2026.&amp;nbsp; The external lighting shall be operated in accordance with the approved details and retained thereafter.&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;Reason: To ensure a high standard of design, and safeguard the amenities of the area and the occupiers of neighbouring properties and ensure compliance with the following Development Plan policies for Merton: policies D12.1 &amp;amp; D12.3 of the Local Plan 2024.&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;","&lt;p&gt;Demolition Environmental Management Plan (DEMP) -&lt;/p&gt;&lt;p&gt;Prior to the commencement of development, a detailed Demolition Environmental Management Plan (DEMP) shall be submitted to and approved in writing by the Local Planning Authority. The DEMP shall&lt;/p&gt;&lt;p&gt;include:&lt;/p&gt;&lt;p&gt;a)Air Quality &amp;amp; Dust Management Plan (AQDMP), based on the approved Air Quality Assessment. The AQDMP shall be in accordance with The &quot;Control of Dust and Emissions During Construction and Demolition&quot; dated July 2014 (SPG). The AQDMP will need to detail the measures to reduce the impacts during the demolition phase.&lt;/p&gt;&lt;p&gt;b) Demolition Management Plan (DMP) identifying:&lt;/p&gt;&lt;p&gt;-Hours of operation&lt;/p&gt;&lt;p&gt;-The parking of vehicles of site operatives and visitors&lt;/p&gt;&lt;p&gt;- Loading and unloading of plant and materials&lt;/p&gt;&lt;p&gt;- Storage of plant and materials&amp;nbsp;&lt;/p&gt;&lt;p&gt;- The erection and maintenance of security hoarding including decorative&lt;/p&gt;&lt;p&gt;displays and facilities for public viewing, where appropriate&lt;/p&gt;&lt;p&gt;- Wheel washing facilities&lt;/p&gt;&lt;p&gt;- Measures to control and monitor the emission of noise and vibration during&lt;/p&gt;&lt;p&gt;demolition&lt;/p&gt;&lt;p&gt;- demonstration to show compliance with BS5228&lt;/p&gt;&lt;p&gt;- measures to control the emission of dust and dirt during demolition&lt;/p&gt;&lt;p&gt;- a scheme for recycling/disposing of waste resulting from demolition works.&amp;nbsp;&lt;/p&gt;&lt;p&gt;The development shall not be implemented other than in accordance with the approved scheme, unless previously agreed in writing by the Local Planning Authority.&lt;/p&gt;&lt;p&gt;Reason: To ensure the safety of pedestrians and vehicles and the amenities of the surrounding area and to comply with the following Development Plan policies for Merton: policies T4 and T7 of the London Plan 2021 and policies T16.3 and T16.4 of Merton Local Plan 2024.&lt;/p&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Approved Plans&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development hereby permitted shall be carried out\r\nin accordance with the following approved plans:&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Approved Plans - The development hereby permitted shall be carried out in accordance with the following approved plans:&amp;nbsp;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Site Location Plan W063-CMP-SI-ZZ-DR-A-00001 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Site Plan W063-CMP-SI-ZZ-DR-A-00100 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Elevations North and South W063-CMP-SI-ZZ-DR-A-01200 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Elevations West W063-CMP-U1-ZZ-DR-A-01201 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Elevations East W063-CMP-U1-ZZ-DR-A-01202 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Site Sections Sheet 1 W063-CMP-SI-00-DR-A-00250 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Proposed Site Sections Sheet 2 W063-CMP-SI-00-DR-A-00251 Rev Pl1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 Ground Floor GA Plan W063-CMP-U1-00-DR-A-01100 Rev PL1&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 Ground Floor Core Plan W063-CMP-U1-00-DR-A-01120&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 First Floor GA Plan W063-CMP-U1-01-DR-A-01101&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 First Floor Core Plan W063-CMP-U1-01-DR-A-01121&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 Roof GA Plan W063-CMP-U1-RF-DR-A-01102&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 1 Typical Cross Sections W063-CMP-U1-ZZ-DR-A-01250&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 Ground Floor GA Plan W063-CMP-U2-00-DR-A-02100&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 Ground Floor Core Plan W063-CMP-U2-00-DR-A-02120&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 First Floor GA Plan W063-CMP-U2-01-DR-A-02101&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 First Floor Core Plan W063-CMP-U2-01-DR-A-02121&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 Roof GA Plan W063-CMP-U2-RF-DR-A-02102&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 2 Typical Cross Sections W063-CMP-U2-ZZ-DR-A-02250&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 Ground Floor GA Plan W063-CMP-U3-00-DR-A-03100&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 Ground Floor Core Plan W063-CMP-U3-00-DR-A-03120&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 First Floor GA Plan W063-CMP-U3-01-DR-A-03101&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 First Floor Core Plan W063-CMP-U3-00-DR-A-03121&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 Roof GA Plan W063-CMP-U3-RF-DR-A-03102&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 3 Typical Cross Sections W063-CMP-U3-ZZ-DR-A-03250&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 Ground Floor GA Plan W063-CMP-U4-00-DR-A-04100&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 Ground Floor Core Plan W063-CMP-U4-00-DR-A-04120&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 First Floor GA Plan W063-CMP-U4-01-DR-A-04101&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 First Floor Core Plan W063-CMP-U4-01-DR-A-04121&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 Roof GA Plan W063-CMP-U4-01-DR-A-04102&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Unit 4 Typical Cross Sections W063-CMP-U4-ZZ-DR-A-01250&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Typical Green Roof Cycle Shelter Detail (6 Bikes) W063-CMP-SI-XX-DR-A-00851&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Typical Green Roof Cycle Shelter Detail (8 Bikes) W063-CMP-SI-XX-DR-A-00852&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;Typical Fence Details W063-CMP-SI-XX-DR-A-00853&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: For the avoidance of doubt and in the interests of proper\r\nplanning&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;strong style=&quot;font-family: &amp;quot;Segoe UI&amp;quot;;&quot;&gt;Cycle Parking:&lt;/strong&gt;&lt;span style=&quot;font-family: &amp;quot;Segoe UI&amp;quot;;&quot;&gt; No unit shall be occupied until the cycle parking facilities associated with that unit, as shown on the approved plans under Condition 2, and in accordance with the approved Transport Statement dated&amp;nbsp;&lt;/span&gt;&lt;font face=&quot;Segoe UI&quot;&gt;April 2026,&lt;/font&gt;&lt;span style=&quot;font-family: &amp;quot;Segoe UI&amp;quot;;&quot;&gt;&amp;nbsp;have been provided and made available for use. The cycle parking facilities shall thereafter be retained and kept available for use by the occupiers and visitors of that unit at all times.&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;u&gt;Reason&lt;/u&gt;: To ensure satisfactory facilities for cycle parking\r\nare provided and to comply with the following Development Plan policies for\r\nMerton: policy T5 of the London Plan 2021 and policies T16.1 and T16.2 of the\r\nLocal Plan 2024.&lt;/p&gt;","<p style=\"text-align: justify; \"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><u><span style=\"font-size: 14px;\">Commencement of development (Full Permission)</span></u><span style=\"font-size: 14px;\"> - The development to which\r\nthis permission relates shall be commenced not later than the expiration of 3\r\nyears from the date of this permission.</span></span></p><p style=\"text-align: justify;\"><span style=\"font-size:12.0pt;line-height:107%;\r\nfont-family:\" arial\",sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=\"\" minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=\"\" ar-sa\"=\"\"><span style=\"font-size: 12pt; line-height: 107%;\"><u><span style=\"font-size: 14px;\">Reason:</span></u><span style=\"font-size: 14px;\">  To comply with Section 91\r\n(as amended) of the Town & Country Planning Act 1990.</span></span></span></p>","&lt;p&gt;Construction Logistics Plan - Prior to the commencement of the development hereby permitted excluding demolition, a Construction Logistics Plan shall be submitted to and approved in writing by the Local Planning Authority in consultation with TFL.&amp;nbsp; The approved measures shall be adhered to throughout the construction process, unless the prior written approval of the Local Planning Authority is first obtained to any variation.&lt;/p&gt;&lt;p&gt;Reason: To ensure the safety of pedestrians and vehicles and the amenities of the surrounding area and to comply with the following Development Plan policies for Merton: policies T4 and T7 of the London Plan 2021 and policies T16.3 and T16.4 of the Local Plan 2024.&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;Prior to the commencement of development (excluding demolition), a construction level detail final scheme for the provision of surface and foul water drainage shall be submitted to and approved in writing by the local planning authority. The drainage scheme will dispose of surface water by means of a sustainable drainage system (SuDS)&amp;nbsp; limited to a greenfield rate of no more than 4.0 l/s in accordance with drainage hierarchy contained within the London Plan Policy (SI 12, SI 13 and SPG) and the advice contained within the National SuDS Standards. The require drainage details shall include:&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;a. Evidence that the proposed final solution will effectively manage the 1 in 30 &amp;amp; 1 in 100 +40% allowance for climate change) storm events during all stages of the development. The final solution should follow the principles set out in the drainage strategy. Discharge rates and storage volumes shall be provided using a maximum site wide discharge rate of 4.0 l/s.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;b. Detailed drainage design drawings and calculations to include: a finalised drainage layout detailing the location of drainage elements, pipe diameters, levels, cross sections of each element including details of any flow restrictions and maintenance/risk reducing features (silt traps, inspection chambers etc.).&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;c. A plan showing exceedance flows (i.e. during rainfall greater than design events or during blockage) and how property on and off site will be protected from increased flood risk.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;d.Details of drainage management responsibilities and maintenance regimes for the drainage system.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;e. Details of how the drainage system will be protected during construction and how runoff (including any pollutants) from the development site will be managed before the drainage system is operational.&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure satisfactory means of surface water\r\ndrainage, to reduce the risk of flooding and to comply with the following\r\nDevelopment Plan policies for Merton: policy SI 13 of the London Plan 2021 and\r\npolicies F15.7, F15.8 and F15.9 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:&quot; arial&quot;,sans-serif;=&quot;&quot; mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=&quot;&quot; en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Boundary Treatment&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development shall not be occupied until details of all boundary walls or fences are submitted to and approved by the Local Planning Authority. The approved details shall be implemented prior to first occupation of the development.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:&quot; arial&quot;,sans-serif;=&quot;&quot; mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=&quot;&quot; en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure a satisfactory and safe development in accordance with\r\nthe following Development Plan policies for Merton: policies D4 and D8 of the\r\nLondon Plan 2021 and policies D12.1 and D12.3 of the Local Plan 2024&lt;/span&gt;&lt;s&gt;&lt;/s&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;No above ground works shall take place until full details of both hard and soft landscaping works have been submitted to and approved in writing by the Local Planning Authority. The details shall include:&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;A) Hard landscape works:&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;Benches/seating, road markings or similar method of delineation and bollards;&lt;/p&gt;&lt;p&gt;Porous hard surfacing materials;&lt;/p&gt;&lt;p&gt;Proposed and existing utility services above and below ground (e.g. drainage, power, communications cables, pipelines etc, indicating lines, manholes, supports etc).&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;B) Soft landscape works, informed by, and in accordance with the recommendations of, the Biodiversity Net Gain Assessment (Aspect Ecology, ref. 20089 BNGA vf, dated 26/03/2026), including:&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;Full Planting Plans in context with the development;&lt;/p&gt;&lt;p&gt;Written specifications (including cultivation and other operations associated with plant and grass establishment);&lt;/p&gt;&lt;p&gt;Plans and written specifications shall detail the quantity, density, size, species, position and the proposed time or programme of planting of all shrubs, hedges, grasses etc, together with an indication of how they integrate with the proposal in the long term with regard to their mature size and anticipated routine maintenance, especially over the first 2 years;&lt;/p&gt;&lt;p&gt;All tree, shrub and hedge planting included within that specification shall be carried out in accordance with BS 3936:1986 (parts 1, 1992, Nursery Stock, Specification for trees and shrubs, and 4, 1984, Specification for forest trees); BS 4043:1989, Transplanting root-balled trees; and BS 4428:1989, Code of practice for general landscape operations (excluding hard surfaces).&lt;/p&gt;&lt;p&gt;&lt;br&gt;&lt;/p&gt;&lt;p&gt;Reason: To ensure a satisfactory standard of development, and that planting delivers the biodiversity net gain identified for the scheme, in accordance with the following Development Plan policies for Merton: policies D4 and D8 of the London Plan 2021, and policies D12.1 and D12.3 of the Merton Local Plan 2024.&lt;/p&gt;","&lt;p&gt;The development hereby permitted shall be used only for purposes falling within Use Classes E(g)(ii), E(g)(iii), B2 and/or B8 of the Town and Country Planning (Use Classes) Order 1987 (as amended), and for no other purpose(s) within any other class of the Order, including any provision equivalent to that class, without the prior written consent of the Local Planning Authority.&lt;/p&gt;&lt;p&gt;Reason: To ensure the retention of the site for employment-generating uses appropriate to its Strategic Industrial Location designation, and to safeguard the character and function of the Strategic Industrial Location, in accordance with London Plan policy E5 and MLP policies EC13.1 and EC13.2.&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;External Materials as Specified&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The facing materials to be used for the\r\ndevelopment hereby permitted shall be those specified in the approved plans as listed under condition 2 unless otherwise agreed in writing by the Local Planning Authority.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To ensure a satisfactory\r\nappearance of the development and to comply with the following Development Plan\r\npolicies for Merton: policies D4 and D8 of the London Plan 2021, policies D12.1\r\nand D12.3 of the Local Plan 2024.&lt;/span&gt;&lt;s&gt;&lt;/s&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;﻿&lt;/span&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Drainage&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - Surface water from private land shall not discharge on to the\r\npublic highway. Details of the drainage system for surface water drainage to\r\nprevent the discharge of surface water from private land on to the highway\r\nshall be submitted to and approved in writing by the Local Planning Authority\r\nprior to commencement of works (excluding demolition). Before any part of the development hereby\r\npermitted is first occupied, the surface water drainage system shall be\r\ncompleted in accordance with the approved details and shall be retained\r\npermanently thereafter.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure satisfactory means of surface water\r\ndrainage, to reduce the risk of flooding and to comply with the following\r\nDevelopment Plan policies for Merton: policy SI 13 of the London Plan 2021 and\r\npolicies F15.7, F15.8 and F15.9 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;"],"uprn":"48020535","centroid":{"lon":-0.18657,"lat":51.410196},"date_building_work_completed_under_previous_permission":null,"borough":"Merton","postcode":"SW19 3TL","date_building_work_started_under_previous_permission":null,"description":"FULL APPLICATION FOR THE PROPOSED REDEVELOPMENT OF THE SITE\r\nFOR FLEXIBLE EMPLOYMENT USE (USE CLASS E(G)(II)-(III)/B2/B8) TOGETHER WITH\r\nSERVICING AREAS, PARKING, LANDSCAPING AND OTHER ASSOCIATED WORKS, INCLUDING\r\nDEMOLITION","last_updated_by":"Portal","ward":null,"street_name":"DEER PARK ROAD","development_type":"Major all other major developments","decision_date":"21/09/2026","appeal_status":null,"appeal_decision_date":null,"polygon":{"crs":{"properties":{"name":"EPSG:27700"},"type":"name"},"type":"geometrycollection","geometries":[{"coordinates":[[[526236.216406619,169560.195524044],[526237.39800139,169559.450073653],[526241.901001395,169558.067073663],[526256.448001411,169557.95007368],[526262.628001417,169558.320073686],[526264.213938381,169558.536154036],[526264.148001419,169557.500073688],[526263.648001434,169537.900073678],[526263.481001441,169527.971073675],[526263.088001455,169510.008073669],[526261.38900152,169424.718073632],[526261.091001531,169409.233073628],[526260.398001556,169375.850073621],[526251.446001547,169375.913073608],[526225.66300152,169376.096073579],[526179.048001472,169376.450073522],[526172.898001465,169376.550073515],[526172.948001461,169381.950073518],[526173.298001453,169392.000073521],[526173.748001432,169420.650073531],[526173.698001427,169426.950073532],[526174.798001383,169484.900073557],[526174.698001377,169491.900073558],[526175.348001336,169546.250073579],[526176.648001333,169551.000073582],[526179.398001332,169555.700073587],[526183.548001334,169559.050073594],[526190.198001339,169561.300073602],[526198.598001348,169561.300073612],[526207.298001357,169561.050073621],[526213.687001364,169560.766073631],[526236.216406619,169560.195524044]]],"type":"Polygon"}]},"secondary_street_name":null,"locality":"Wimbledon","id":"Merton-26_FULL_0673","pp_id":"14796699","status":"Approved","decision":"Approved"}