{"decision_target_date":"07/05/2026","last_updated_by":"Portal","appeal_decision_date":null,"appeal_status":null,"development_type":"Minor dwellings","postcode":"SW20 8LX","title_number":null,"application_details":{"non_permanent_dwellings_details":[{"type":"Traveller pitches/plots"},{"type":"Houseboat moorings"},{"type":"Non-permanent dwellings"}],"other_residential_accommodation_details":{"other_resi_accommodation_unit_details":[{"unit_type":"Hostel Room"},{"unit_type":"Hotel Room"},{"unit_type":"Apart-Hotel Room"},{"unit_type":"Secure Residential Room"}]},"existing_proposed_floorspace_details":[{"gia_existing":null,"use_class":"A1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"A3","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1a","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1b","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B1c","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"B8","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"C1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"C2","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"D1","gia_gained":null,"gia_lost":null},{"gia_existing":null,"use_class":"D2","gia_gained":null,"gia_lost":null}]},"decision_date":"07/10/2026","url_planning_app":"https://rspandlp.merton.gov.uk//planning/index.html?fa=getApplication&id=272607","borough":"Merton","locality":"Raynes Park","date_building_work_started_under_previous_permission":null,"bo_system":"Portal","parking_details":null,"site_name":"Flat 1, VISION HOUSE","epc_number":null,"pp_id":"14743523","subdivision_of_building":null,"status":"Approved","description":"﻿APPLICATION FOR VARIATION OF CONDITION 2 (DRAWING\r\nNUMBERS) RELATING TO LBM PLANNING PERMISSION 20/P3168 - ERECTION OF A SINGLE\r\nSTOREY ROOF EXTENSION AND INFILL EXTENSION FOR THE CREATION OF 5 SELF CONTAINED\r\nFLATS TOGETHER WITH ASSOCIATED AMENITY AREAS, CYCLE PARKING, REFUSE AREAS AND ASSOCIATED WORKS.\r\n\r\nTHE VARIATION SEEKS TO SUB-DIVIDE THE APPROVED THREE\r\nBEDROOM FLAT (FLAT 1) INTO A 1 X 2B/4P UNIT AND 1 X 1B/1P UNIT, INCREASING THE\r\nOVERALL NUMBER OF FLATS FROM 5 TO 6.","decision_conditions":["&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;No Use of Flat Roof&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp; - Access to\r\nthe flat roof of the development hereby permitted shall be for maintenance or\r\nemergency purposes only, and the flat roof shall not be used as a roof garden,\r\nterrace, patio or similar amenity area.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To safeguard the\r\namenities and privacy of the occupiers of adjoining properties and to comply\r\nwith the following Development Plan policies for Merton: policies D3 and D4 of\r\nthe London Plan 2021 and policies D12.3 &amp;amp; D12.4&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-size: 14px; line-height: 107%;&quot; aptos&quot;,sans-serif;=&quot;&quot; mso-ascii-theme-font:minor-latin;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:&quot;times=&quot;&quot; new=&quot;&quot; roman&quot;;=&quot;&quot; mso-bidi-theme-font:minor-bidi;mso-ansi-language:en-gb;mso-fareast-language:=&quot;&quot; en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size: 14px; line-height: 107%;&quot;&gt;of the Local Plan\r\n2024.&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;External Lighting &lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;-&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;Prior to the first occupation of the development\r\nhereby approved a lighting scheme for this site shall be submitted to and\r\napproved in writing by the Local planning Authority. The approved lighting\r\nscheme shall be installed and operational prior to the first occupation of the\r\ndevelopment hereby approved.&amp;nbsp;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; margin-bottom: 0cm; line-height: normal;&quot;&gt;&lt;span style=&quot;&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To safeguard the amenities of the area and\r\nthe occupiers of neighbouring properties and ensure compliance with the\r\nfollowing Development Plan policies for Merton: policies D12.1 &amp;amp; D12.3 of\r\nthe Local Plan 2024.&lt;/span&gt;&lt;span style=&quot;font-size: 12pt;&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Approved Plans&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development hereby permitted shall be carried out\r\nin accordance with the following approved plans:&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;26-004-01\r\nRev A – Cycle Store &amp;amp; Refuse Store Details&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;26-004-02\r\n– Ecology Enhancements&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;VIH-HK-XX-ZZ-DR-A-6706\r\nRev C01 – Fire Strategy Section&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;VIH-HK-XX-02-DR-A-1002\r\nRev C01 – Proposed Second Floor Plan&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;VIH-HK-XX-M2-DR-A-10020\r\nRev C01 – Proposed Second Floor (Mezzanine) Plan&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;VIH-HK-XX-03-DR-A-1003\r\nRev C01 – Proposed Third Floor Plan&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n\r\n&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;VIH-HK-XX-04-DR-A-1004\r\nRev C01 – Proposed Fourth Floor Plan&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;br&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: For the avoidance of doubt and in the interests of proper\r\nplanning&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Opening over Highway&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The doors of the garage or gates hereby approved\r\nshall not open over the adjacent highway.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; In the\r\ninterests of the safety of pedestrians and vehicles and to comply with the\r\nfollowing Development Plan policies for Merton: policies T4 and T7 of the\r\nLondon Plan 2021 and policies T16.3 and T16.4 of the Local Plan 2024&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:\r\n0pt;mso-ligatures:none;mso-ansi-language:EN-GB;mso-fareast-language:JA;\r\nmso-bidi-language:AR-SA&quot;&gt;The development shall be implemented only in\r\naccordance with the recommendations to protect noise intrusion into the\r\nresidential dwellings and plant noise criteria as detailed in the Background Noise Survey and Plant Assessment (submitted under 20/P3168).&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-size: 12pt; font-family: Arial, sans-serif;&quot;&gt;Reason:&amp;nbsp; &lt;/span&gt;&lt;span style=&quot;font-size: 12pt; font-family: Arial, sans-serif;&quot;&gt;To safeguard the\r\namenities of the occupiers of adjoining properties and to comply with the\r\nfollowing Development Plan policies for Merton: policies D12.1 and D12.4 of the\r\nLocal Plan 2024.&lt;/span&gt;&lt;/p&gt;","&lt;p&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:\r\n0pt;mso-ligatures:none;mso-ansi-language:EN-GB;mso-fareast-language:JA;\r\nmso-bidi-language:AR-SA&quot;&gt;Noise levels, (expressed as the equivalent continuous\r\nsound level) LAeq (10 minutes), from any fixed external new plant/machinery\r\nshall not exceed LA90-10dB at the boundary with any residential property or\r\nnoise sensitive premises.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;Reason:&amp;nbsp; &lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;To safeguard the\r\namenities of the occupiers of adjoining properties and to comply with the\r\nfollowing Development Plan policies for Merton: policies D12.1 and D12.4 of the\r\nLocal Plan 2024.&lt;/span&gt;&lt;/p&gt;","&lt;table class=&quot;MsoNormalTable&quot; border=&quot;0&quot; cellspacing=&quot;3&quot; cellpadding=&quot;0&quot; width=&quot;657&quot;&gt;\r\n &lt;tbody&gt;&lt;tr&gt;\r\n  &lt;td width=&quot;519&quot; valign=&quot;top&quot; style=&quot;width:389.4pt;padding:1.4pt 5.4pt 1.4pt 5.4pt&quot;&gt;\r\n  &lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n  &amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:\r\n  JA&quot;&gt;All Non-road Mobile Machinery (NRMM) used during the course of the &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n  &lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n  &amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:\r\n  JA&quot;&gt;development that is within the scope of the Greater London Authority\r\n  &#x27;Control of Dust and Emissions during Construction and Demolition&#x27;\r\n  Supplementary &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n  &lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n  &amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:\r\n  JA&quot;&gt;Planning Guidance (SPG) dated July 2014, or any subsequent amendment or\r\n  guidance, shall comply with the emission requirements therein.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n  &lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n  &amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:\r\n  JA&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;\r\n  &lt;/td&gt;\r\n &lt;/tr&gt;\r\n &lt;tr&gt;\r\n  &lt;td width=&quot;519&quot; valign=&quot;top&quot; style=&quot;width:389.4pt;padding:1.4pt 5.4pt 1.4pt 5.4pt&quot;&gt;\r\n  &lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n  &amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:\r\n  JA&quot;&gt;Reason: Having regard to the impact on local air quality and to comply\r\n  with Policy SI 1 of the London Plan 2021.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n  &lt;/td&gt;\r\n &lt;/tr&gt;\r\n&lt;/tbody&gt;&lt;/table&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Cycle Parking to be implemented&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - The development hereby permitted shall\r\nnot be occupied until the cycle parking shown on the plans hereby approved has\r\nbeen provided and made available for use. These facilities shall be retained\r\nfor the occupants of and visitors to the development at all times.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure satisfactory facilities for cycle parking\r\nare provided and to comply with the following Development Plan policies for\r\nMerton: policy T5 of the London Plan 2021 and policies T16.1 and T16.2 of the\r\nLocal Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Working Method Statement &lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;- Development shall not commence\r\nuntil a working method statement has been submitted to and approved in writing\r\nby the Local Planning Authority to accommodate:&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%; font-size: 14px;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp; (i) Parking of\r\nvehicles of site workers and visitors;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (ii) Delivery\r\ntimes;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (iii) Loading and\r\nunloading of plant and materials;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (iv) Storage of\r\nconstruction plant and materials;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (v) Wheel cleaning\r\nfacilities&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (vi) Control of\r\ndust, smell and other effluvia;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&amp;nbsp;&amp;nbsp; (vii) Control of\r\nsurface water run-off.&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%; font-size: 14px;&quot;&gt;&amp;nbsp;&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;No development shall\r\nbe carried out except in full accordance with the approved method statement.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Alternatively, the development can be carried out in accordance with the Working Method Statement submitted under condition discharge application 24/P2162.&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure the safety of pedestrians and vehicles\r\nand the amenities of the surrounding area and to comply with the following\r\nDevelopment Plan policies for Merton: policies T4 and T7 of the London Plan\r\n2021 and policies T16.3 and T16.4 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Construction Logistics Plan&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - Prior to the commencement of the\r\ndevelopment hereby permitted, including demolition, a Construction Logistics\r\nPlan shall be submitted to and approved in writing by the Local Planning\r\nAuthority.&amp;nbsp; The approved measures shall\r\nbe adhered to throughout the construction process, unless the prior written\r\napproval of the Local Planning Authority is first obtained to any variation.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size:11.0pt;font-family:&amp;quot;Aptos&amp;quot;,sans-serif;\r\nmso-ascii-theme-font:minor-latin;mso-fareast-font-family:Aptos;mso-fareast-theme-font:\r\nminor-latin;mso-hansi-theme-font:minor-latin;mso-bidi-font-family:&amp;quot;Times New Roman&amp;quot;;\r\nmso-bidi-theme-font:minor-bidi;mso-ansi-language:EN-GB;mso-fareast-language:\r\nEN-US;mso-bidi-language:AR-SA&quot;&gt;Alternatively, the development can be carried\r\nout in accordance with the Construction Logistics Plan agreed under condition\r\ndischarge application 24/P2162.&lt;/span&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure the safety of pedestrians and vehicles\r\nand the amenities of the surrounding area and to comply with the following\r\nDevelopment Plan policies for Merton: policies T4 and T7 of the London Plan\r\n2021 and policies T16.3 and T16.4 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:\r\n&quot; arial&quot;,sans-serif&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Materials to be Approved&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - No development shall take place\r\nuntil details of particulars and samples of the materials to be used on all\r\nexternal faces of the development hereby permitted, including window frames and\r\ndoors (notwithstanding any materials specified in the application form and/or\r\nthe approved drawings), have been submitted to the Local Planning Authority for\r\napproval. No works which are the subject of this condition shall be carried out\r\nuntil the details are approved, and the development shall be carried out in\r\nfull accordance with the&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 14px;&quot;&gt;approved details.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 14px;&quot;&gt;Alternatively, the development can be carried out in accordance with the materials agreed under condition discharge application 24/P2162.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure a satisfactory appearance of the development and to\r\ncomply with the following Development Plan policies for Merton: policies D4 and\r\nD8 of the London Plan 2021, policies D12.1 and D12.3 of the Local Plan 2024 .&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Refuse &amp;amp; Recycling (Implementation) &lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;- The development hereby\r\napproved shall not be occupied until the refuse and recycling storage\r\nfacilities shown on the approved plans have been fully implemented and made\r\navailable for use. These facilities shall thereafter be retained for use at all\r\ntimes.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;\r\nfont-family:&quot; arial&quot;,sans-serif;mso-fareast-font-family:aptos;mso-fareast-theme-font:=&quot;&quot; minor-latin;mso-ansi-language:en-gb;mso-fareast-language:en-us;mso-bidi-language:=&quot;&quot; ar-sa&quot;=&quot;&quot;&gt;&lt;span style=&quot;font-size: 12pt; line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;:&amp;nbsp; To ensure the provision\r\nof satisfactory facilities for the storage of refuse and recycling material and\r\nto comply with the following Development Plan policies for Merton: policies T4\r\nand T7 of the London Plan 2021 and policy&amp;nbsp;\r\nW14.4 of the Local Plan 2024.&amp;nbsp;&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;1. Prior to the commencement of development,\r\nincluding demolition, a detailed Demolition and Construction Environmental\r\nManagement Plan (DCEMP) shall be submitted to and approved in writing by the\r\nLocal Planning Authority. The DCEMP shall include: &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n\r\n&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;a) An Air quality management plan that identifies\r\nthe steps and procedures that will be implemented to minimise the creation and\r\nimpact of dust and other air emissions resulting from the site preparation,\r\ndemolition, and groundwork and construction phases of the development. To\r\ninclude continuous dust monitoring. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n\r\n&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;b) Construction environmental management plan that\r\nidentifies the steps and procedures that will be implemented to minimise the\r\ncreation and impact of noise, vibration, dust and other air emissions resulting\r\nfrom the site preparation, demolition, and groundwork and construction phases\r\nof the development. &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n\r\n&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;2. The development shall not be implemented other\r\nthan in accordance with the approved scheme, unless previously agreed in\r\nwriting by the Local Planning Authority.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt; &lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;\r\n\r\n&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;Alternatively, the development can be carried out in accordance with the DCEMP approved under condition discharge application 24/P2162.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;\r\n\r\n&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA;\r\nmso-bidi-font-weight:bold&quot;&gt;Reason: To ensure the development does not raise\r\nlocal environment impacts and pollution.&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;br&gt;","&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Sustainable Drainage&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; -&amp;nbsp;&lt;/span&gt;&lt;/span&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;No\r\ndevelopment approved by this permission shall be commenced until a detailed\r\nscheme for the provision of surface and foul water drainage has been\r\nimplemented in accordance with details that have been submitted to and approved\r\nin writing by the local planning authority. The drainage scheme will dispose of\r\nsurface water by means of a sustainable drainage system (SuDS) via infiltration\r\nor at an agreed runoff rate, in accordance with drainage hierarchy contained\r\nwithin the London Plan and the advice contained within the National SuDS\r\nStandards.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-family: Arial, sans-serif; font-size: 12pt;&quot;&gt;Alternatively, the development shall be carried out in accordance with the drainage plan agreed under condition discharge application 24/P2162.&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;margin-bottom:0cm;line-height:normal&quot;&gt;&lt;span style=&quot;font-size:12.0pt;font-family:&amp;quot;Arial&amp;quot;,sans-serif;mso-fareast-font-family:\r\n&amp;quot;MS Mincho&amp;quot;;mso-font-kerning:0pt;mso-ligatures:none;mso-fareast-language:JA&quot;&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure satisfactory means of surface water\r\ndrainage, to reduce the risk of flooding and to comply with the following\r\nDevelopment Plan policies for Merton: policy SI 13 of the London Plan 2021 and\r\npolicies F15.7, F15.8 and F15.9 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;font-size:12.0pt;line-height:107%;font-family:&quot; arial&quot;,sans-serif;=&quot;&quot; mso-fareast-font-family:aptos;mso-fareast-theme-font:minor-latin;mso-ansi-language:=&quot;&quot; en-gb;mso-fareast-language:en-us;mso-bidi-language:ar-sa&quot;=&quot;&quot;&gt;&lt;br&gt;&lt;/span&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;﻿&lt;/span&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Delivery and Servicing Plan&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt; - Development shall not commence until a\r\nDelivery and Servicing Plan (the Plan) has been submitted in writing for\r\napproval to the Local Planning Authority. No occupation of the development\r\nshall be permitted until the Plan is approved in writing by the Local Planning\r\nAuthority and implemented in accordance with the approved plan.&amp;nbsp; The approved measures shall be maintained, in\r\naccordance with the Plan, for the duration of the use, unless the prior written\r\napproval of the Local Planning Authority is obtained to any variation.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Alternatively, the development can be carried out in accordance with the Delivery and Servicing Plan agreed under condition discharge application 24/P2162.&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure the safety of pedestrians and vehicles\r\nand the amenities of the surrounding area and to comply with the following\r\nDevelopment Plan policies for Merton: policies T4 and T7 of the London Plan\r\n2021 and policy T16.4 of the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;","&lt;p style=&quot;text-align: justify; &quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Sustainability -&amp;nbsp;&lt;/span&gt;&lt;/u&gt;&lt;/span&gt;&lt;span style=&quot;font-size: 11pt;&quot;&gt;No part of the development hereby approved shall be occupied until evidence has been submitted to and approved in writing by the Local Planning Authority confirming that the residential development has achieved CO2 reductions in accordance with those outlined in the submitted Merton energy assessment template and wholesome water consumption rates of no greater than 105 litres per person per day.&lt;/span&gt;&lt;/p&gt;&lt;br data-cke-eol=&quot;1&quot;&gt;&lt;p&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;/span&gt;&lt;/p&gt;&lt;p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot;&gt;&lt;span style=&quot;line-height: 107%;&quot;&gt;&lt;u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;Reason&lt;/span&gt;&lt;/u&gt;&lt;span style=&quot;font-size: 14px;&quot;&gt;: To ensure that the development achieves a high\r\nstandard of sustainability and makes efficient use of resources and to comply\r\nwith the following Development Plan policies for Merton: Policy SI 2 and SI 3\r\nof the London Plan 2021 and Policies CC2.1, CC2.2, CC2.3, CC2.4, CC2.5 and CC2.6\r\nof the Local Plan 2024.&lt;/span&gt;&lt;/span&gt;&lt;o:p&gt;&lt;/o:p&gt;&lt;/p&gt;"],"site_number":"300","last_updated":"2026-10-13T10:26:47.451Z","last_date_consultation_comments":"10/05/2026","valid_date":"12/03/2026","actual_commencement_date":null,"centroid_northing":169314,"appeal_decision":null,"decision_agency":"Borough","lpa_app_no":"26/SEC73/0355","date_building_work_completed_under_previous_permission":null,"decision":"Approved","id":"Merton-26_SEC73_0355","polygon":{"type":"geometrycollection","geometries":[{"coordinates":[[[524354.697999664,169319.300071373],[524375.997999709,169287.750071385],[524381.847999713,169290.850071396],[524375.897999698,169302.20007139],[524396.69799971,169313.050071419],[524384.947999681,169335.300071412],[524354.697999664,169319.300071373]]],"type":"Polygon"}],"crs":{"type":"name","properties":{"name":"EPSG:27700"}}},"appeal_start_date":null,"decision_process":"Delegated","ward":"Merton Park","street_name":"KINGSTON ROAD","secondary_street_name":null,"last_synced":"2026-10-21T16:59:52.007Z","lpa_name":"Merton","reference_no_of_permission_being_relied_on":null,"cil_liability":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.2134,51.409271],[-0.213105,51.408983],[-0.213019,51.409009],[-0.213101,51.409113],[-0.212798,51.409206],[-0.212959,51.409408],[-0.2134,51.409271]]]},"uprn":"48127526","application_type":"All Other","centroid":{"lat":51.409219,"lon":-0.213095},"lapsed_date":"07/10/2029","application_type_full":"Removal/Variation of a condition","centroid_easting":524376,"actual_completion_date":null}