{"uprn":"100023393705","wgs84_polygon":{"coordinates":[[[-0.292634,51.459373],[-0.292635,51.459346],[-0.292678,51.459346],[-0.292677,51.459373],[-0.292634,51.459373]]],"type":"Polygon"},"subdivision_of_building":null,"centroid_easting":518713,"application_type":"All Other","status":"Approved","epc_number":null,"cil_liability":true,"parking_details":{},"centroid":{"lat":51.45936,"lon":-0.292656},"description":"Variation of conditions U0129431 (Approved Drawings), U0129434 NS03 (Mixed Biodiverse Roof), and U0129445 NS13 (Plant Screening) of planning permission 21/1537/FUL to allow for compliance with current Part L requirements of building regulations; including Installation of Air Source Heat Pumps (ASHP); introduction of a new below-ground sprinkler tank and addition of wind catchers to the roof of the General Hall.  Additionally variation of condition U0129436 NS05 (Arboricultural Method Statement_AMS) to allow for additional pruning of trees for site access.","application_details":{"lead_developer_company_name":"LBRuT Trees Preservation Officer (South)"},"valid_date":"09/10/2025","decision_process":null,"appeal_start_date":null,"application_type_full":"Removal/Variation of a condition","last_updated_by":"Agile APAS","bo_system":"Agile APAS","decision_target_date":"04/12/2025","last_updated":"2025-12-23T00:01:48.553Z","site_name":"Kings House School","development_type":null,"centroid_northing":174758,"title_number":null,"borough":"Richmond","actual_commencement_date":null,"lpa_app_no":"PA25/3268","pp_id":"PP-14335425","appeal_decision_date":null,"lpa_name":"Richmond","decision_agency":null,"date_building_work_started_under_previous_permission":null,"decision":"Approved","id":"Richmond-PA25_3268","last_date_consultation_comments":"14/11/2025","locality":null,"appeal_decision":null,"street_name":"Kings Road","postcode":"TW10 6ES","secondary_street_name":null,"date_building_work_completed_under_previous_permission":null,"url_planning_app":null,"appeal_status":null,"decision_date":"19/12/2025","lapsed_date":"18/12/2028","decision_conditions":["Phase 1 of Construction referenced within the table on page 2 of the cover letter dated 21/06/2024 and received at the LPA on 21/06/2024 shall be undertaken in accordance with details approved under 21/1537/DD05 unless otherwise agreed in writing by the LPA. \r\nPrior to the commencement of each other development phase(s) referenced within the table on page 2 of the cover letter, no development shall take place including any works of demolition, until a Construction Management Statement (to include any demolition works) has been submitted to and approved in writing by the Local Planning Authority for that phase(s). The approved plan shall be adhered to throughout the relevant construction phase(s). The statement shall provide for: \r\n1. The size, number, routing and manoeuvring tracking of construction vehicles to and from the site, and holding areas for these on/off site; \r\n2. Site layout plan showing manoeuvring tracks for vehicles accessing the site to allow these to turn and exit in forward gear; \r\n3. Details and location of parking for site operatives and visitor vehicles (including measures taken to ensure satisfactory access and movement for existing occupiers of neighbouring properties during construction); \r\n4. Details and location where plant and materials will be loaded and unloaded; \r\n5. Details and location where plant and materials used in constructing the development will be stored, and the location of skips on the highway if required; \r\n6. Details of any necessary suspension of pavement, roadspace, bus stops and/or parking bays; \r\n7. Details where security hoardings (including decorative displays and facilities for public viewing) will be installed, and the maintenance of such; \r\n8. Details of any wheel washing facilities;\r\n9. Details of a scheme for recycling/disposing of waste resulting from demolition and construction works (including excavation, location and emptying of skips); \r\n10. Details of measures that will be applied to control the emission of noise, vibration and dust including working hours. This should follow Best Practice detailed within BS5288:2009 Code of Practice for Noise and Vibration Control on Construction and Open Sites; \r\n11. Details of any highway licenses and traffic orders that may be required (such as for licences for any structures / materials on the highway or pavement; or suspensions to allow the routing of construction vehicles to the site); \r\n12. Details of the phasing programing and timing of works; \r\n13. Where applicable, the Construction Management Statement should be written in conjunction with the Arboricultural Method Statement, and in accordance with British Statement 5837:2012 'Trees in relation to design, demolition and construction - recommendations', in particular section 5.5, 6.1, 6.2, 6.3 and 7; 14. A construction programme including a 24 hour emergency contact number; 15. See also TfL guidance on Construction Logistics Plans. \r\nREASON: In the interests of highway and pedestrian safety together with the amenity of the area."],"polygon":null,"site_number":"68","ward":null,"reference_no_of_permission_being_relied_on":null,"actual_completion_date":null,"last_synced":"2025-12-23T02:26:07.233Z"}