{"date_building_work_completed_under_previous_permission":null,"cil_liability":true,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.289844,51.441968],[-0.289845,51.441941],[-0.289888,51.441941],[-0.289887,51.441968],[-0.289844,51.441968]]]},"postcode":"TW10 5HY","ward":null,"appeal_start_date":null,"appeal_decision":null,"valid_date":"15/06/2026","secondary_street_name":null,"centroid_northing":172827,"reference_no_of_permission_being_relied_on":null,"actual_commencement_date":null,"last_updated":"2026-08-26T00:01:49.098Z","description":"Proposed redevelopment of yard areas including replacement workshop, barn, training room and access alterations.","subdivision_of_building":null,"epc_number":null,"url_planning_app":null,"borough":"Richmond","street_name":"Richmond Park","decision_process":null,"last_synced":"2026-08-26T02:55:42.506Z","last_updated_by":"Agile APAS","date_building_work_started_under_previous_permission":null,"application_type":"All Other","lapsed_date":null,"last_date_consultation_comments":"17/07/2026","title_number":null,"appeal_status":null,"application_type_full":"Full planning permission","development_type":null,"decision_target_date":"10/08/2026","lpa_name":"Richmond","uprn":"10002252044","decision_date":null,"lpa_app_no":"PA26/0133","centroid_easting":518952,"appeal_decision_date":null,"decision_conditions":["- Elevations are missing of all existing/proposed boundary treatments, no elevations are provided in regards to the washing station, please provide.\r\n\r\n- Open Space Assessment required which addresses NPPF greenbelt policies and Local Plan policy 35, \r\n\r\n- BNG report and metric (the report submitted notes that an updated report with a metric needs to be submitted with a planning application) \r\n\r\n- Archaeology Desktop study required. \r\n\r\n- Description of development needs simplifying."],"site_number":null,"bo_system":"Agile APAS","status":"Application Under Consideration","site_name":"Oak Lodge","decision":null,"polygon":{"geometries":[{"coordinates":[[[518931.123,172798.263],[518931.123,172798.263],[518934.525,172762.225],[518940.85,172761],[518945.3,172760.35],[518957.4,172759.3],[518961.4,172759.65],[518977.5,172762.35],[518979.05,172764.7],[518973.5,172801.85],[518993.4,172805.45],[518985.15,172857.3],[518945.2,172841.5],[518947.95,172814.8],[518952.984,172815.108],[518955.263,172800.559],[518931.123,172798.263]]],"type":"Polygon"}],"type":"GeometryCollection"},"centroid":{"lon":-0.289866,"lat":51.441955},"actual_completion_date":null,"pp_id":"PP-13513954","decision_agency":null,"parking_details":{},"locality":"Richmond","id":"Richmond-PA26_0133","application_details":{"lead_developer_company_name":"LBRuT Ecology (South/East)","affordable_housing_fast_track":false,"phasing_details":[{"phase_detail":"Two phases ","intended_completion_date":"12/2027","intended_commencement_date":"06/2026"}],"total_gia_gained":312,"site_area":0.43810000000000004,"total_gia_lost":0,"total_gia_existing":58,"existing_proposed_floorspace_details":[{"gia_existing":58,"use_class":"B8","gia_gained":312,"gia_lost":0}],"projected_cost_of_works":"Up to £2m","occupation_status":"Occupied","scheme_phasing":true,"rain_water_harvesting":true,"building_details":[{"no_storeys":1,"max_height":3.63,"building_ref":"Training Room"},{"no_storeys":1,"max_height":5.34,"building_ref":"Green Barn"},{"no_storeys":1,"max_height":3.87,"building_ref":"Carpenters Workshop"}],"grey_water_reuse":false,"green_suds":false,"surface_water_discharge_percentage_reduction":0,"non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":312,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_gained":312,"total_gia_lost":0,"total_gia_existing":58},"garden_land_lost":true,"infrastructure_details":{"total_annual_pm_emissions":0,"no_resi_units_to_have_full_fibre":0,"green_roof_area":0,"urban_greening_factor_score":110,"solar_pv_capacity":0.01,"no_homes_passive_cooling":0,"no_new_water_connections_required":1,"no_non_resi_units_to_have_full_fibre":0,"total_annual_nox_emissions":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"no_homes_to_have_electrical_heating":0,"mobile_network_operators_consultation":false,"fire_suppression_system_proposed":false,"no_new_gas_connections_required":0,"ghg_reduction_over_building_regulations":false},"internal_resi_water_usage":0,"ownership_status":"Public"}}