{"decision":"Approved","last_date_consultation_comments":null,"wgs84_polygon":{"type":"Polygon","coordinates":[[[-0.248142,51.473968],[-0.248143,51.473941],[-0.248186,51.473941],[-0.248185,51.473968],[-0.248142,51.473968]]]},"date_building_work_started_under_previous_permission":null,"ward":null,"site_number":null,"polygon":null,"appeal_status":null,"application_type_full":"Full planning permission","borough":"Richmond","lpa_name":"Richmond","postcode":"SW13 9LE","appeal_start_date":null,"appeal_decision_date":null,"status":"Approved","valid_date":"27/01/2026","site_name":"Prospect Studios Rear Of","decision_date":"26/02/2026","pp_id":"PP-14498548","actual_completion_date":null,"url_planning_app":null,"application_details":{"surface_water_discharge_percentage_reduction":0,"site_area":0.1,"projected_cost_of_works":"Up to £2m","garden_land_lost":false,"scheme_phasing":true,"infrastructure_details":{"fire_suppression_system_proposed":true,"green_roof_area":0,"waste_provision":true,"percentage_demolition_construction_material_recycling":0,"ghg_reduction_over_building_regulations":true,"no_homes_to_have_electrical_heating":0,"no_resi_units_to_have_full_fibre":0,"total_annual_pm_emissions":0,"total_annual_nox_emissions":0,"no_homes_passive_cooling":0,"no_new_water_connections_required":0,"no_new_gas_connections_required":0,"no_non_resi_units_to_have_full_fibre":0,"mobile_network_operators_consultation":false},"internal_resi_water_usage":0,"ownership_status":"Private","non_residential_details":{"total_non_resi_gross_internal_floor_area_to_be_gained":0,"total_non_resi_gross_internal_floor_area_to_be_lost":0,"total_gia_lost":0,"total_gia_gained":0,"total_gia_existing":482.2},"existing_proposed_floorspace_details":[{"gia_existing":482.2,"use_class":"SpecifiedOther","gia_gained":0,"gia_lost":0}],"green_suds":false,"phasing_details":[{"phase_detail":"1","intended_completion_date":"07/2026","intended_commencement_date":"04/2026"}],"total_gia_gained":0,"total_gia_existing":482.2,"affordable_housing_fast_track":false,"grey_water_reuse":false,"total_gia_lost":0,"rain_water_harvesting":false,"lead_developer_company_name":"LBRuT Non-Comm Env Health Noise Issues"},"development_type":null,"centroid_easting":521765,"decision_target_date":"24/03/2026","decision_agency":null,"actual_commencement_date":null,"lpa_app_no":"PA26/0271","decision_process":null,"lapsed_date":"25/02/2029","uprn":"MAN000000000827048","bo_system":"Agile APAS","cil_liability":null,"street_name":"Seaforth Lodge","locality":null,"application_type":"All Other","epc_number":"0320-0733-3959-4502-7006","decision_conditions":["The mechanical plant and all associated acoustic mitigation shall be installed fully in accordance with the ACA Acoustics report (Ref: 251114 R001, dated 19 December 2025), including the high performance acoustic enclosures detailed in Appendix B.  The plant shall not be operated other than in accordance with the approved acoustic performance standards in the ACA Acoustics report (Ref: 251114 R001, dated 19 December 2025). The plant and all associated acoustic mitigation, including acoustic enclosures, shall be maintained in good working order for the lifetime of the development and no deviation, substitution, or alteration to the approved mitigation may occur without prior written approval of the Local Planning Authority. \r\nREASON: To safeguard the amenities of nearby neighbouring occupants."],"reference_no_of_permission_being_relied_on":null,"secondary_street_name":null,"centroid_northing":176454,"last_updated":"2026-03-17T00:01:45.434Z","centroid":{"lon":-0.248164,"lat":51.473954},"subdivision_of_building":null,"last_synced":"2026-03-17T02:22:45.568Z","last_updated_by":"Agile APAS","title_number":null,"appeal_decision":null,"date_building_work_completed_under_previous_permission":null,"id":"Richmond-PA26_0271","parking_details":{"no_proposed_car":2,"no_existing_cycle":0,"no_proposed_cycle":3,"net_cycle":3,"no_existing_car":4,"net_car":-2},"description":"External alterations including removal of external escape stair, alterations to existing windows and doors, and new rooflights. Installation of replacement plant equipment and associated mitigation and louvres/vents. Installation of timber fencing, external stores, and other minor alterations."}